ML14353A333
From kanterella
Revision as of 02:20, 28 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Letter Sequence Request | |
---|---|
TAC:MF5259, (Approved, Closed) | |
Administration | |
MONTHYEARRS-14-071, Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term.2014-03-31031 March 2014
[Table View]Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term. Project stage: Response to RAI RS-14-300, Expedited Seismic Evaluation Process Report (CEUS Sites), Response to Nrg Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1..2014-12-19019 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites), Response to Nrg Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1.. Project stage: Request ML15139A0122015-04-14014 April 2015 NRR E-mail Capture - Inquiry Peach Bottom ESEP Report Clarifications Project stage: Request ML15173A3602015-06-19019 June 2015 NRR E-mail Capture - Peach Bottom Units 2 and 3 - Technical Review Checklist Related to Interim ESEP Supporting Implementation of NTTF R2.1, Seismic (TAC Nos. MF5259 and MF5260) Project stage: Other ML15173A3852015-06-30030 June 2015 Staff Review of Interim Evaluation Associated with Reevaluated Seismic Hazard Implementation Near-Term Task Force Recommendation 2.1 Project stage: Approval 2015-04-14 |
ML14353A333 | |
Person / Time | |
---|---|
Site: | Peach Bottom |
Issue date: | 12/19/2014 |
From: | Jim Barstow Exelon Generation Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RS-14-300 14Q4233-RPT-004, Rev 3 | |
Download: ML14353A333 (68) | |
Similar Documents at Peach Bottom | |
---|---|
Category:Letter
MONTHYEARIR 05000277/20244012024-10-17017 October 2024
[Table view]Security Baseline Inspection Report 05000277/2024401 and 05000278/2024401 (Cover Letter Only) RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24227A5492024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. 05000277/LER-2024-001, Submittal of LER 2024-001-00 for Peach Bottom Atomic Power Station (PBAPS) Unit 2, Automatic Reactor Scram Due to an Invalid Generator Lockout2024-03-21021 March 2024 Submittal of LER 2024-001-00 for Peach Bottom Atomic Power Station (PBAPS) Unit 2, Automatic Reactor Scram Due to an Invalid Generator Lockout IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) 2024-09-06 Category:Report MONTHYEARML24177A1512024-06-24024 June 2024
[Table view]Post Accident Monitoring Instrumentation Report ML23346A2392024-01-17017 January 2024 Seismic Hazard Report by the Office of Nuclear Reactor Regulation ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits CCN:22-15, (Pbaps), Units 1, 2, and 3 - Annual Commitment Revision Report for the Period 01/01/21 Through 12/31/212022-01-31031 January 2022 (Pbaps), Units 1, 2, and 3 - Annual Commitment Revision Report for the Period 01/01/21 Through 12/31/21 RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20329A3452020-11-24024 November 2020 Relief Request Associated with N-16A Reactor Pressure Vessel Instrument Nozzle Repairs - Submittal of Analyses ML20314A0282020-11-0606 November 2020 Verbal Relief for Penetration Nozzle ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML19053A4692019-06-10010 June 2019 Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluation Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic ML19007A3302019-01-0707 January 2019 Final Report PBAPS Thermal Study ML18354B0662018-12-20020 December 2018 Summary of Monitoring Well Installation Details RS-18-113, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident...2018-09-28028 September 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident... RS-18-098, Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ...2018-08-28028 August 2018 Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ... ML18093A3822018-03-30030 March 2018 Decommissioning Status Report - 2017 RS-18-002, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2018-01-0505 January 2018 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML17093A6972017-03-30030 March 2017 Decommissioning Status Report - 2016 ML19064B2232017-02-24024 February 2017 Final Report for Post-EPU Thermal and Biological Monitoring Peach Bottom Atomic Power Station ML17027A0152017-01-27027 January 2017 ISFSI - Biennial 1OCFR 50.59 and 10CFR 72.48 Reports for the Period 1/1/2015 Through 12/31/2016 and Annual Commitment Revision Report for the Period 1/1/16 Through 12/31/16 ML16342B6212016-12-0707 December 2016 Results of Visual Inspections of Replacement Steam Dryer RS-16-103, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal2016-06-30030 June 2016 Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal ML16048A4412016-02-17017 February 2016 Transmittal of Extended Power Uprate: Results of Replacement Steam Dryer Power Ascension Testing ML19064B2162015-12-31031 December 2015 Data Report or Intake Screen Sampling at Peach Bottom Atomic Power Station in 2015 ML15275A1682015-10-0202 October 2015 Attachment 2, LTR-BWR-ENG-15-076-NP, Revision 1, Replacement Steam Dryer Report at Predicted EPU Conditions (Non-Proprietary) and Attachment 3, Affidavit ML15233A0952015-08-20020 August 2015 Revision 0 to LTR-BWR-ENG-15-076-NP, Replacement Steam Dryer Report at Predicted EPU Conditions ML15219A6182015-08-0707 August 2015 Extended Power Uprate: Results of Unit 2 Replacement Steam Dryer Power Ascension Testing ML15051A2622015-04-20020 April 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Related to Recommendation 2.1 ML15097A0762015-04-0606 April 2015 Soarca Peach Bottom 2005 Site File ML15096A0082015-04-0505 April 2015 Extended Power Uprate: Response to Replacement Steam Dryer Requests for Additional Information ML15026A4692015-02-12012 February 2015 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to EA-13-109 (Severe Accident Capable Hardened Vents) ML15029A6402015-01-29029 January 2015 Mellla+ License Amendment Request Supplement 1 Supplemental Reload Licensing Report ML15028A3812015-01-28028 January 2015 Independent Spent Fuel Storage Installation (ISFSI) - Biennial 10 CFR 50.59 and 10CFR 72.48 Reports for the Period 1/1/2013 Through 12/31/2014 and Annual Commitment Revision Report for Period 1/1/14 - 12/31/14 ML19064B2142014-12-31031 December 2014 Data Report or Intake Screen Sampling at Peach Bottom Atomic Power Station in 2014 RS-14-300, Expedited Seismic Evaluation Process Report (CEUS Sites), Response to Nrg Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1..2014-12-19019 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites), Response to Nrg Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1.. RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14119A0572014-06-17017 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident (Tac Nos. MF0261 and MF0262) ML14086A6242014-04-30030 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (MF0157 and MF0158) ML14105A3872014-04-11011 April 2014 Attachment 10: WCAP-17654-NP, Rev. 4, Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate ML14105A3862014-04-11011 April 2014 Attachment 9: WCAP-17649-NP, Rev. 2, ASME Code Stress Report (Enclosure B.3) ML14105A3852014-04-11011 April 2014 Attachment 8: WCAP-17635-NP, Rev. 3, Comprehensive Vibration Assessment Program ML14105A3882014-04-11011 April 2014 Attachment 11: WCAP-17655-NP, Rev. 4, Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate ML14072A0232014-03-31031 March 2014 WCAP-17635-NP, Rev 2, Peach Bottom Atomic Power Station Unit 2 and Unit 3 Replacement Steam Dryer Comprehensive Vibration Assessment Program. ML14072A0242014-03-31031 March 2014 WCAP-17609-NP, Rev 2, Peach Bottom Units 2 and 3 Replacement Steam Dryer Structural Evaluation for High-Cycle Acoustic Loads. ML14072A0252014-03-31031 March 2014 WCAP-17654-NP, Rev 3, Peach Bottom Unit 2 Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate. ML14072A0262014-03-31031 March 2014 WCAP-17655-NP, Rev 3,Peach Bottom Unit 3 Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate. RS-14-001, Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal 1 (Annex a) for the Peach Bottom, Unit 3. Report No. RS-14-0012014-03-25025 March 2014 Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for the Peach Bottom, Unit 3. Report No. RS-14-001 ML19064B2202014-02-28028 February 2014 Final Report for the Thermal Study to Support a 316(a) Demonstration: Peach Bottom Atomic Power Station Part 1 of 2 ML14070A1462014-02-28028 February 2014 WCAP-17639-NP, Revision 3, Instrumentation Description for the Peach Bottom Unit 2 Replacement Steam Dryer. ML14070A1452014-02-28028 February 2014 WCAP-17626-NP, Revision 1, Processing of Peach Bottom Unit 2 and Unit 3 MSL Strain Gauge Data and Computation of Predicted EPU Signature. 2024-06-24 Category:Technical MONTHYEARML23346A2392024-01-17017 January 2024
[Table view]Seismic Hazard Report by the Office of Nuclear Reactor Regulation NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20329A3452020-11-24024 November 2020 Relief Request Associated with N-16A Reactor Pressure Vessel Instrument Nozzle Repairs - Submittal of Analyses ML20314A0282020-11-0606 November 2020 Verbal Relief for Penetration Nozzle ML19053A4692019-06-10010 June 2019 Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluation Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic ML19007A3302019-01-0707 January 2019 Final Report PBAPS Thermal Study ML18354B0662018-12-20020 December 2018 Summary of Monitoring Well Installation Details RS-18-113, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident...2018-09-28028 September 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident... RS-18-098, Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ...2018-08-28028 August 2018 Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ... RS-18-002, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2018-01-0505 January 2018 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML16048A4412016-02-17017 February 2016 Transmittal of Extended Power Uprate: Results of Replacement Steam Dryer Power Ascension Testing ML15275A1682015-10-0202 October 2015 Attachment 2, LTR-BWR-ENG-15-076-NP, Revision 1, Replacement Steam Dryer Report at Predicted EPU Conditions (Non-Proprietary) and Attachment 3, Affidavit ML15233A0952015-08-20020 August 2015 Revision 0 to LTR-BWR-ENG-15-076-NP, Replacement Steam Dryer Report at Predicted EPU Conditions ML15219A6182015-08-0707 August 2015 Extended Power Uprate: Results of Unit 2 Replacement Steam Dryer Power Ascension Testing ML15029A6402015-01-29029 January 2015 Mellla+ License Amendment Request Supplement 1 Supplemental Reload Licensing Report RS-14-300, Expedited Seismic Evaluation Process Report (CEUS Sites), Response to Nrg Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1..2014-12-19019 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites), Response to Nrg Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1.. RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14105A3862014-04-11011 April 2014 Attachment 9: WCAP-17649-NP, Rev. 2, ASME Code Stress Report (Enclosure B.3) ML14105A3852014-04-11011 April 2014 Attachment 8: WCAP-17635-NP, Rev. 3, Comprehensive Vibration Assessment Program ML14105A3872014-04-11011 April 2014 Attachment 10: WCAP-17654-NP, Rev. 4, Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate ML14105A3882014-04-11011 April 2014 Attachment 11: WCAP-17655-NP, Rev. 4, Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate ML14072A0262014-03-31031 March 2014 WCAP-17655-NP, Rev 3,Peach Bottom Unit 3 Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate. ML14072A0232014-03-31031 March 2014 WCAP-17635-NP, Rev 2, Peach Bottom Atomic Power Station Unit 2 and Unit 3 Replacement Steam Dryer Comprehensive Vibration Assessment Program. ML14072A0242014-03-31031 March 2014 WCAP-17609-NP, Rev 2, Peach Bottom Units 2 and 3 Replacement Steam Dryer Structural Evaluation for High-Cycle Acoustic Loads. ML14072A0252014-03-31031 March 2014 WCAP-17654-NP, Rev 3, Peach Bottom Unit 2 Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate. RS-14-001, Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal 1 (Annex a) for the Peach Bottom, Unit 3. Report No. RS-14-0012014-03-25025 March 2014 Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for the Peach Bottom, Unit 3. Report No. RS-14-001 ML19007A3282014-02-28028 February 2014 Final Report for the Thermal Study to Support a 316(a) Demonstration ML14077A0952014-01-30030 January 2014 BWROG-TP-14-001, Rev. 0, Containment Accident Pressure Committee (344) Task 1 - Cfd Report and Combined Npshr Uncertainty for Browns Ferry/ Peach Bottom Cvic RHR Pumps, Attachment 8 ML14077A0902013-12-31031 December 2013 BWROG-TP-13-021, Rev. 0, Containment Accident Pressure Committee (344) Task 4 - Operation in Maximum Erosion Rate Zone (Cvic Pump), Attachment 11 ML13220A1052013-11-22022 November 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13317A9502013-11-20020 November 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Peach Bottom Atomic Power Station, Units 2 and 3, TAC Nos.: MF0845 and MF0846 ML19186A3832013-07-31031 July 2013 Analysis for the Maryland Department of Natural Resources' Question of the Effect of Peach Bottom Station Uprate on Migratory Fishes. Prepared for Exelon Generation by Normandeau Associates, Inc. and Environmental Resource Management. July ML14077A0912013-06-30030 June 2013 BWROG-TP-13-008, Rev. 0, Containment Accident Pressure Committee (344) Task 2 - Equation for Pump Speed Correction (Cvic Pump), Attachment 9 ML14077A0922013-06-30030 June 2013 BWROG-TP-13-010, Containment Accident Pressure Committee (344) Task 6 - Npshr Test Instrument Accuracy Effect on the Published Results (Cvic Pump), Attachment 13 ML14077A1022013-06-30030 June 2013 BWROG-TP-13-009, Rev. 0, Containment Accident Pressure Committee (344) Task 3 Pump Operation at Reduced Npsha Conditions (Cvic Pump), Attachment 10 ML13175A1102013-05-31031 May 2013 NEDO-33533, Revision 1, Peach Bottom Atomic Power Station Units 2 and 3 Safety Valve Setpoint Tolerance Increase Safety Analysis Report. ML13032A5502013-01-31031 January 2013 NEDO-33808, Revision 0, Peach Bottom Atomic Power Station Units 2 and 3 SIL 636 Evaluation of Small Break Loca. RS-12-174, Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-19019 November 2012 Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML12286A0212012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 15, WCAP-17609-NP, Rev. 1 - Enclosure B2, Replacement Steam Dryer Structural Evaluation for High-Cycle Acoustic Loads ML12286A0202012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 15, WCAP-17590-NP, Rev. 0 - Enclosure B1, Acoustic Lead Definition ML12286A0112012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 4, NEDO-33566, Rev. 0, Safety Analysis Report, Constant Pressure Power Uprate, Page 2-488 Through End, and Attachments 5 and 7 Through 9 ML12286A0612012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, WCAP-17639-NP, Revision 2, Instrumentation Description for the Peach Bottom Unit 2 Replacement Steam Dryer ML12286A0582012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, WCAP-17655-NP, Revision 2, Peach Bottom Unit 3 Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate ML12286A0572012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 15, WCAP-17654-NP, Rev. 2 - Enclosure B.4U2, Replacement Steam Dryer Power Ascension Program Description for Extended Power Update ML12286A0132012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 4, NEDO-33566, Rev. 0, Safety Analysis Report, Constant Pressure Power Uprate, Cover Through Page 2-222 ML12286A0142012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 4, NEDO-33566, Rev. 0, Safety Analysis Report, Constant Pressure Power Uprate, Page 2-223 Through Page 2-358 ML12286A0152012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 4, NEDO-33566, Rev. 0, Safety Analysis Report, Constant Pressure Power Uprate, Page 2-359 Through Page 2-487 ML12286A0192012-09-30030 September 2012 License Amendment Request - Extended Power Uprate, Attachment 15, WCAP-17635-NP - Enclosure 15A, Rev. 1, Replacement Steam Dryer Comprehensive Vibration Assessment Program (Cvap) 2024-01-17 |
Retrieved from "https://kanterella.com/w/index.php?title=ML14353A333&oldid=401002"