NRR-PMDAPEm Resource From: Jackson, Diane Sent: Friday, June 19, 2015 11:29 AM To: Shams, Mohamed Cc: DiFrancesco, Nicholas; Wyman, Stephen; Spence, Jane; Devlin-Gill, Stephanie; Roche, Kevin; Yee, On; Heeszel, David; Rodriguez, Ricardo; Ng, Ching; Park, Sunwoo; 50.54f_Seismic Resource; RidsNroDsea Resource

Subject:

PEACH BOTTOM UNITS 2 AND 3 - TECHNICAL REVIEW CHECKLIST RELATED TO INTERIM ESEP SUPPORTING IMPLEMENTATION OF NTTF R2.1, SEISMIC (TAC NOS.

MF5259 AND MF5260)

Attachments: Peach Bottom R2.1 seismic ESEP NRC review.docx June 19, 2015 MEMORANDUM TO: Mohamed K. Shams, Chief Hazards Management Branch (JHMB)

Japan Lessons-Learned Division Office of Nuclear Reactor Regulation FROM: Diane T. Jackson, Chief Geosciences and Geotechnical Engineering Branch 2 (RGS2)

Division of Site Safety and Environmental Analysis Office of New Reactors

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - TECHNICAL REVIEW CHECKLIST RELATED TO INTERIM EXPEDITED SEISMIC EVALUATION PROCESS SUPPORTING IMPLEMENTATION OF NTTF RECOMMENDATION 2.1, SEISMIC, RELATED TO THE FUKUSHIMA DAI-ICHI NUCLEAR POWER PLANT ACCIDENT (TAC NOS. MF5259 and MF5260)

The NRC technical staff working through the Geosciences and Geotechnical Engineering Branches 1 and 2 (RGS1 and RGS2) completed the Technical Review Checklist of the PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, response to Enclosure 1, Item (6) of the March 12, 2012, request for information letter issued per Title 10 of the Code of Federal Regulations, Subpart 50.54(f), to power reactor licensees and holders of construction permits requesting addressees to provide further information to support the NRC staffs evaluation of regulatory actions to be taken in response to Fukushima Near-Term Task Force (NTTF)

Recommendation 2.1: Seismic which implements lessons learned from Japans March 11, 2011, Great Thoku Earthquake and subsequent tsunami. The addresses the staff review of the Expedited Seismic Evaluation Process (ESEP) Interim Evaluation report in response to Requested Item (6) of Enclosure 1, Recommendation 2.1: Seismic, of the 50.54(f) letter. Attached is a file containing the technical review checklist to prepare a response letter to the licensee.

The NRC staff reviewed the information provided and, as documented in the enclosed staff checklist, determined that sufficient information was provided to be responsive to this portion of the Enclosure 1 of the 50.54(f) letter. The application of this staff review is limited to the interim ESEP as part of NTTF R2.1: Seismic activities.

This electronic memo constitutes the DSEA concurrence provided that only editorial changes are made to the staff assessment that would not affect the technical conclusions or technical context of the assessment.

This concludes the NRCs efforts associated with TAC NOS. MF5259 AND MF5260 for the review of the ESEP Interim Evaluation report for PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3.

1

Docket Nos: 50-277 and 50-278 CONTACT: Stephanie Devlin-Gill Office of New Reactors 301-415-5301 Copy: Nicholas DiFrancesco, Stephen Wyman, Jane Spence, Stephanie Devlin-Gill, Kevin Roche, On Yee, David Heeszel, Ricardo Rodriguez, Ching Ng, Sunwoo Park, Robert Hsu, 50.54f_Seismic Resource, RidsNroDsea Resource 2

Hearing Identifier: NRR_PMDA Email Number: 2168 Mail Envelope Properties (933495689F8EB5409FE4267845E41B8816D43EEEB9)

Subject:

PEACH BOTTOM UNITS 2 AND 3 - TECHNICAL REVIEW CHECKLIST RELATED TO INTERIM ESEP SUPPORTING IMPLEMENTATION OF NTTF R2.1, SEISMIC (TAC NOS.

MF5259 AND MF5260)

Sent Date: 6/19/2015 11:28:36 AM Received Date: 6/19/2015 11:28:39 AM From: Jackson, Diane Created By: Diane.Jackson@nrc.gov Recipients:

"DiFrancesco, Nicholas" <Nicholas.DiFrancesco@nrc.gov>

Tracking Status: None "Wyman, Stephen" <Stephen.Wyman@nrc.gov>

Tracking Status: None "Spence, Jane" <Jane.Spence@nrc.gov>

Tracking Status: None "Devlin-Gill, Stephanie" <Stephanie.Devlin-Gill@nrc.gov>

Tracking Status: None "Roche, Kevin" <Kevin.Roche@nrc.gov>

Tracking Status: None "Yee, On" <On.Yee@nrc.gov>

Tracking Status: None "Heeszel, David" <David.Heeszel@nrc.gov>

Tracking Status: None "Rodriguez, Ricardo" <Ricardo.Rodriguez@nrc.gov>

Tracking Status: None "Ng, Ching" <Ching.Ng@nrc.gov>

Tracking Status: None "Park, Sunwoo" <Sunwoo.Park@nrc.gov>

Tracking Status: None "50.54f_Seismic Resource" <50.54f_Seismic.Resource@nrc.gov>

Tracking Status: None "RidsNroDsea Resource" <RidsNroDsea.Resource@nrc.gov>

Tracking Status: None "Shams, Mohamed" <Mohamed.Shams@nrc.gov>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 3131 6/19/2015 11:28:39 AM Peach Bottom R2.1 seismic ESEP NRC review.docx 49270 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

TECHNICAL REVIEW CHECKLIST BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO EXPEDITED SEISMIC EVALUATION PROCESS INTERIM EVALUATION IMPLEMENTING NTTF RECOMMENDATION 2.1 SEISMIC PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278 By letter dated March 12, 2012 (USNRC, 2012a), the U.S. Nuclear Regulatory Commission (NRC) issued a request for information to all power reactor licensees and holders of construction permits in active or deferred status, pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 50.54(f) Conditions of License (hereafter referred to as the 50.54(f) letter). Enclosure 1 of the 50.54(f) letter requests addressees to reevaluate the seismic hazard at their site using present-day methods and guidance for licensing new nuclear power plants, and identify actions to address or modify, as necessary, plant components affected with the reevaluated seismic hazards. Requested Information Item (6) in Enclosure 1 to the 50.54(f) letter requests addressees to provide an interim evaluation and actions taken or planned to address a higher seismic hazard relative to the design basis, as appropriate, prior to completion and submission of the seismic risk evaluation.

Additionally, by letter dated April 12, 20131, the Electric Power Research Institute (EPRI) staff submitted EPRI TR 3002000704 Seismic Evaluation Guidance: Augmented Approach for the Resolution of Fukushima Near-Term Task Force (NTTF) Recommendation 2.1: Seismic (hereafter referred to as the guidance). The Augmented Approach proposed that licensees would use an Expedited Seismic Evaluation Process (ESEP) to address the interim actions as requested by Information Item (6) in the 50.54(f) letter. The ESEP is a simplified seismic capacity evaluation with a focused scope of certain key installed Mitigating Strategies equipment that is used for core cooling and containment functions to cope with scenarios that involve a loss of all AC power and loss of access to the ultimate heat sink to withstand the Review Level Ground Motion, which is up to two times the safe shutdown earthquake (SSE).

Due to the expedited and interim nature of the ESEP, the assessment does not include many considerations that are part of a normal risk evaluation.These deferred items, include but are not limited to, structures, piping, non-seismic failures, and operator actions, as well scenarios such as addressing loss of coolant accidents. By letter dated May 7, 20132, the NRC staff endorsed the guidance. Central and eastern United States licensees with a reevaluated seismic hazard exceeding the SSE submitted an ESEP interim evaluation in December 2014 Consistent with the interim nature of this activity, the staff performed the review of the licensees submittal to assess whether the intent of the guidance was implemented. A multi-disciplined team checked whether the identified methods were consistent with the guidance. A senior expert panel reviewed the teams questions, if any, and checklist for consistency and scope.

New or updated parameters (e.g., In-Structure Response Spectra, High Confidence of Low Probability of Failure calculations) presented by the licensees were assessed only based on licensee statements for acceptability for the Item (6) response. The application of this staff review is limited to the ESEP interim evaluation as part of NTTF R2.1: Seismic activities.

1 ADAMS Accession No. ML13102A142 2 ADAMS Accession No. ML13106A331

NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Peach Bottom Atomic Power Station, Units Nos. 2 and 3 By letter dated December 19, 20143, Exelon Generating Co., LLC (the licensee) provided an Expedited Seismic Evaluation Process (ESEP) report in a response to Enclosure 1, Requested Information Item (6) of the 50.54(f) letter, for the Peach Bottom Atomic Power Station, Units 2 and 3 (Peach Bottom).

I. Review Level Ground Motion The licensee:

  • described the determination of the review level ground motion (RLGM) using one of the means acceptable by the guidance Yes
  • identified location of the control point and is consistent with March submittal Yes
  • compared the site ground motion response spectra used to select the ESEP RLGM to the SSE. Yes Peach Bottom used a scaled SSE at the maximum ratio of 2.0for the ESEP because the GMRS is above two times the SSE.

Notes from the Reviewer:None Deviation(s) or Deficiency(ies), and Resolution:

  • No deviations or deficiencies were identified The NRC staff concludes:
  • the licensees RLGM meets the intent of the guidance Yes
  • the RLGM is reasonable for use in the interim evaluation. Yes II. Selection of the Success Path The licensee:
  • described the success path Yes
  • described normal and desired state of the equipment for the success Yes path
  • ensured that the success path is consistent with the plants overall Yes mitigating strategies approach or provided a justification for an alternate path
  • stated that the selection process was in accordance with the Yes guidance or meets the intent of the guidance
  • used installed FLEX Phase 1 equipment as part of the success path Yes
  • included FLEX Phase 2 and/or 3connections Yes
  • considered installed FLEX Phase 2 and/or 3equipment Yes Notes from the Reviewer:None Deviation(s) or Deficiency(ies), and Resolution:
  • No deviations or deficiencies were identified 3 ADAMS Accession No. ML14353A333 Page 2

NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Peach Bottom Atomic Power Station, Units Nos. 2 and 3 The NRC staff concludes that:

  • the selected success path is reasonable for use in the interim Yes evaluation
  • the licensee considered installed Phase 2 and 3 connections or Yes equipment in the interim evaluation.

III. Selection of the Equipment List The licensee:

  • developed and provided the ESEL by applying the ESEP Yes
  • identified equipment considering the following functions:

o Core cooling (with focus on Mode 1) function Yes o Available, sustainable water source Yes o Containment function and integrity Yes For PWR Plants ONLY The licenseeincluded indicators / instrumentation for the following functions:

level, pressure, temperature, that would be indicative of (but not explicitly N/A identified to specific instruments): water level of the SG, pressure of SG, containment, and RCS; and temperature of the RCS.

For BWR Plants ONLY The licenseeconsidered indicators for the following functions:

level, pressure, temperature that would be indicative of (but not explicitly Yes identified to specific instruments): Temperature of suppression pool, RCS, containment); Pressure of suppression pool, RCS, and drywell; water level of the suppression pool.

Notes from the Reviewer:

  • The staff requested the licensee to justify why certain components were not included in the ESEL for Units 2 & 3. The staff finds that the licensee responses (ML15139A012) adequately addressed the concern and met the intent of the guidance for this interim evaluation.
  • The staff requested the licensee to clarify whether HCLFP evaluations will be performed to ensure they achieve the RLGM capacity when those non-portable FLEX components are installed in the future. The staff finds that the licensee responses (ML15139A012) adequately addressed the concern and met the intent of the guidance for this interim evaluation.

Deviation(s) or Deficiency(ies), and Resolution:

  • No deviations or deficiencies were identified Page 3

NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Peach Bottom Atomic Power Station, Units Nos. 2 and 3 Through a sampling of the ESEP key components, the NRC staff concludes that:

  • the licensees process to develop the ESEL meets the intent of the Yes guidance for the interim evaluation
  • the desired equipment state for the success path were identified Yes
  • the licensee considered the support equipment for the ESEL Yes
  • both front-line and support systems appeared to be included in the Yes ESEL as evidenced by inclusion of SSCs on the success path and of support systems (e.g., batteries, motor control center (MCC),

inverters).

IV. Walkdown Approach The licensee:

  • described the walkdown screening approach, including walkbys and Yes walkdowns performed exclusively for the ESEP, in accordance with the guidance
  • credited previous walkdown results, including a description of current Yes action(s) to verify the present equipment condition and/or configuration (e.g., walk-bys), in accordance with the guidance
  • stated that the walkdown was performed by seismically trained Yes personnel Notes from the Reviewer:None Deviation(s) or Deficiency(ies), and Resolution:
  • No deviations or deficiencies were identified The licensee:
  • described adverse material condition of the equipment (e.g. material degradation)
  • credited previous walkdown results, included a description of current Yes action(s) to verify the present equipment condition (e.g., walk-bys),

meeting the intent of the guidance Yes The licensee:

  • described the conditions of structural items considered for the interim evaluation, including:

o spatial interactions (i.e. interaction between block walls and other items/components) o anchorage Yes o piping connected to tanks (i.e. differential movement between pipes and tanks at connections) Yes Yes Notes from the Reviewer:None Deviation(s) or Deficiency(ies), and Resolution:

  • No deviations or deficiencies were identified Page 4

NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Peach Bottom Atomic Power Station, Units Nos. 2 and 3 The licensee reported deviations for Peach Bottom. No If deviations were identified, there is a discussion of how the deficiencies N/A were or will be addressed in the ESEP submittal report.

The NRC staff concludes that:

the licensee described the performed walkdown approach, including any Yes credited previous efforts (e.g., Individual Plant Examination of ExternalEvents(IPEEE)consistent with the guidance Yes

  • the licensee addressed identified deviations consistent with the guidance, if any V. Capacity Screening Approach and HCLPF Calculation Results The licensee:
  • described the capacity screening process for the ESEL items, Yes consistent with the guidance (e.g., use of EPRI NP-6041 screening table).
  • presented the results of the screened-out ESEL items in the ESEP Yes report
  • described the development of ISRS based on scaling Yes
  • described the development of ISRS based on new analysis N/A consistent with the guidance
  • described the method for estimating HCLPF capacity of screened-in Yes ESEL items, including both structural and functional failure modes consistent with the guidance:

o use of Conservative Deterministic Failure Margin (CDFM) Yes o use of fragility analysis (FA) N/A o use of experience data or generic information Yes

  • credited IPEEE spectral shape for HCLPF capacity estimates is Yes similar to or envelopes the RLGM, and anchored at the same control point
  • presented the results of HCLPF capacities including associated Yes failure modes for screened-in ESEL items Yes
  • reviewed the ESEL items with the lowest HCLPF values to ensure that their capacities are equal or greater than the RLGM Notes from the Reviewer:
  • The staff asked a question to the licensee regarding licensees disposition of components whose HCLPF values were lower than the RLGM. In its response (ML15139A012), the licensee stated that the affected components are RCIC Turbine Trip Aux relays which can be reset through operator actions from the main control room and that the operator actions are described in a Peach Bottom site procedure, which is acceptable to the staff.

Deviation(s) or Deficiency(ies), and Resolution:

  • No deviations or deficiencies were identified Page 5

NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Peach Bottom Atomic Power Station, Units Nos. 2 and 3 The NRC staff concludes that:

  • the licensee described the implementation of the capacity screening Yes process consistent with the intent of the guidance
  • the licensee presented capacity screening and calculation results, as Yes appropriate, in the ESEP report
  • the method used to develop the ISRS is consistent with guidance for Yes use in the ESEP
  • for HCLPF calculations, the licensee used HCLPF calculation Yes methods as endorsed in the guidance
  • no anomalies were noted in the reported HCLPF Yes VI. Inaccessible Items The licensee:
  • provided a list of inaccessible items Yes
  • provided a schedule of the planned walkdown and evaluation for all N/A inaccessible items
  • provided Regulatory Commitment to complete walkdowns. N/A Peach Bottom will provide results or complete walkdown by: N/A Notes from the Reviewer:
  • The licensee identified a number of items that were inaccessible due to being energized or were located in high radiation areas. The licensee dispositioned of these items by sampling of other/similar equipment, referring to recent previous walkdowns performed and other applicable methods. The staff finds this approach reasonable for the interim evaluation.

Deviation(s) or Deficiency(ies), and Resolution:

  • No deviations or deficiencies were identified The NRC staff concludes that the licensee:
  • listed inaccessible items Yes
  • committed to provide the results (e.g. walkdowns, walkbys, etc) of N/A the remaining inaccessible items consistent with the guidance
  • substitutions, if needed, were appropriately justified Yes VII. Modifications to Plant Equipment The licensee:
  • identified modifications for ESEL items necessary to achieve HCLPF Yes values that bound the RLGM (excluding mitigative strategies equipment (FLEX)), as specified in the guidance
  • provided a schedule to implement such modifications (if any), Yes consistent with the intent of the guidance
  • provided Regulatory Commitment to complete modifications Yes
  • provided Regulatory Commitment to report completion of Yes modifications.

Page 6

NTTF Recommendation 2.1 Expedited Seismic Evaluation Process Technical Review Checklist for Peach Bottom Atomic Power Station, Units Nos. 2 and 3 Peach Bottom will:

  • complete modifications during outages in Fall 2017 for Unit 3 and by Fall 2018 for Unit 2__
  • report completion of modifications by__same dates as above__

Notes from the Reviewer:None Deviation(s) or Deficiency(ies), and Resolution:

  • No deviations or deficiencies were identified The NRC staff concludes that the licensee:
  • identified plant modifications necessary to achieve the target seismic Yes capacity
  • provided a schedule to implement the modifications (if any) Yes consistent with the guidance VIII.

Conclusions:

The NRC staff assessed the licensees implementation of the ESEP guidance. Due to the interim applicability of the ESEP evaluations, use of the information for another application would require a separate NRC review and approval. Based on its review, the NRC staff concludes that the licensees implementation of the interim evaluation meets the intent of the guidance. The staff concludes that, through the implementation of the ESEP guidance, the licensee identified and evaluated the seismic capacity of certain key installed Mitigating Strategies equipment that is used for core cooling and containment functions to cope with scenarios that involve a loss of all AC power and loss of access to the ultimate heat sink to withstand a seismic event up to the Review Level Ground Motion (RLGM). In the case of Peach Bottom, the RLGM was set at the maximum ratio of two times the SSE in accordance with the guidance because the GMRS is above two times the SSE. The staff did not identify deviations or exceptions taken from the guidance. The application of this staff review is limited to the ESEP interim evaluation as part of NTTF R2.1: Seismic activities. The licensee identified safety enhancing modifications based on the evaluation, and committed to complete modifications and report the completion of modifications in the Fall 2017 for Unit 3 and Fall 2018 for Unit 2.

In summary, the licensee, by implementing the ESEP interim evaluation, has demonstrated additional assurance which supports continued plant safety while the longer-term seismic evaluation is completed to support regulatory decision making. The NRC staff concludes that the licensee responded appropriately to Enclosure 1, Item (6) of the 50.54(f) letter, dated March 12, 2012, for Peach Bottom Nuclear Atomic Power Station, Units 2 and 3.

Technical Reviewers: David Heezel, Kevin Roche, Ching Ng, Robert Hsu, Sunwoo Park, Ricardo Rodriguez, Joseph Braverman (NRC Consultant)