And Turkey Point – Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1
ML23109A186
Person / Time
Site: Saint Lucie, Point Beach, Seabrook, Turkey Point, Duane Arnold  NextEra Energy icon.png
Issue date: 04/19/2023
From: Justin Poole
Plant Licensing Branch 1
To: Mack J, Mack K, Phillabaum J
NextEra Energy
Poole J
References
Download: ML23109A186 (1)


Text

From: Justin Poole (He/Him)

To: Phillabaum, Jerry; Mack, Jarrett; Mack, Kenneth Cc: Hipo Gonzalez

Subject:

POINT BEACH; SEABROOK; ST. LUCIE PLANT; AND TURKEY POINT - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: PROPOSED ALTERNATIVE TO ASME SECTION XI AUTHORIZING IMPLEMENTATION OF ASME CODE CASE N-752-1 Date: Wednesday, April 19, 2023 10:57:00 AM

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2; SEABROOK STATION, UNIT NO. 1; ST. LUCIE PLANT, UNIT NOS. 1 AND 2; AND TURKEY POINT NUCLEAR GENERATING UNIT NOS. 3 AND 4 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: PROPOSED ALTERNATIVE TO ASME SECTION XI AUTHORIZING IMPLEMENTATION OF ASME CODE CASE N-752-1

By letter dated March 15, 2023 (ADAMS Accession No. ML23074A155), NextEra Energy Point Beach, LLC/NextEra Energy Seabrook, LLC/Florida Power & Light Company submitted a relief request for Point Beach Nuclear Plant, Units 1 and 2; Seabrook Station, Unit No. 1; St. Lucie Plant, Units Nos. 1 and 2; and Turkey Point Generating Unit Nos. 3 and 4. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br /> to complete. The NRC staff expects to complete this review by April 19, 2024. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Justin C. Poole Project Manager FitzPatrick/Seabrook/NextEra Fleet NRR/DORL/LPL I U.S. Nuclear Regulatory Commission (301)415-2048