ML21266A041
From kanterella
Jump to navigation
Jump to search
ML21266A041 | |
Person / Time | |
---|---|
Site: | Saint Lucie |
Issue date: | 09/17/2021 |
From: | Lauren Gibson Office of Nuclear Reactor Regulation |
To: | Bob Caldwell, Franzone S, Lois James, Maher W, Hector Rodriguez-Luccioni Florida Power & Light Co |
Rodriguez-Luccioni H | |
References | |
EPID L -2021-SLR-0002 | |
Download: ML21266A041 (1) | |
Similar Documents at Saint Lucie | |
---|---|
Category:Acceptance Review Letter
MONTHYEARML23109A1862023-04-19019 April 2023
[Table view]and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23019A2052022-12-24024 December 2022 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors - Acceptance Review ML21266A0412021-09-17017 September 2021 SLR Application Accepted-email to FPL ML21039A1932021-01-19019 January 2021 NRC Acceptance Review: St Lucie, Units 1 and 2 - License Amendment to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC ML21035A0172020-12-11011 December 2020 NRC Acceptance Review: St Lucie, Unit 2- RR 15 - Extension of St. Lucie, Unit 2 RPV Welds from 10 to 20 Years ML21036A2422020-03-12012 March 2020 NRC Acceptance Review: St Lucie 2 LAR for RCS Pressure/Temperature Limits and LTOP Applicable for 55 EFPY ML19324C5772019-11-19019 November 2019 NRC Acceptance Review: St Lucie 2 Flywheel LAR ML16029A1722016-02-0101 February 2016 Acceptance of Requested Licensing Action Regarding the Use of Gothic Computer Code Vacuum Analyses ML15281A2292015-11-0505 November 2015 Acceptance Review of Relief Request 10, Revision 0, Concerning Control Element Drive Mechanism Welds - Fourth 10-Year Interval ML15223B2042015-08-24024 August 2015 Acceptance of Requested Licensing Action Regarding Removal the 10-Year Sediment Cleaning of the Fuel Oil Storage Tank from Technical Specifications and Relocated to License-Controlled Documents (TAC Nos. MF6488-89) ML14210A3972014-07-28028 July 2014 NRR E-mail Capture - Acceptability Review of the Relief Request No 16 (MF4340) ML14210A4252014-07-23023 July 2014 NRR E-mail Capture - Acceptability Review of the Relief Request No. 6 (MF336) ML14118A2442014-03-19019 March 2014 E-mail Re. Acceptance Review: PSL2 Amendment, 10-year ISI Snubber Surveillance ML13169A2962013-06-18018 June 2013 Acceptance Review Concerning License Amendment Request to Adopt NFPA-805, Performance-Based at Standard for Fire Protection for Light Water Reactor Electric Generating Plants, ML1130800452011-11-0303 November 2011 Acceptance Review - One-Time Exemption Request 10 CFR 26.205(d)(3) - Work Hour Controls ML1123109812011-08-19019 August 2011 Acceptance Review ISI Third Ten-Year Interval Relief Request No. 12 ML11173A1042011-06-23023 June 2011 Acceptance for Review of License Amendment Request for Extended Power Uprate ML1114306512011-05-23023 May 2011 Acceptance Review of Exemption P-T Limit Curves ML1002008292010-01-14014 January 2010 Plants Units 1 and 2 - Request for Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue 2023-04-19 Category:E-Mail MONTHYEARML24002A7272023-12-16016 December 2023
[Table view]NRR E-mail Capture - (External_Sender) November 2023 FPL Marine Turtle Removal Monthly Report ML23332A0352023-11-27027 November 2023 Conversion to Improved Technical Specifications Change in Estimated Review Schedule ML23326A0252023-11-20020 November 2023 NRR E-mail Capture - (External_Sender) October 2023 FPL Marine Turtle Removal Monthly Report ML24008A1582023-11-14014 November 2023 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for October 2023 ML23254A2852023-09-11011 September 2023 NRR E-mail Capture - (External_Sender) August 2023 FPL Marine Turtle Removal Monthly Report ML23243A9182023-08-31031 August 2023 NRR E-mail Capture - Re Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23228A1482023-08-16016 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PSL2-I5-RR-01 (L-2023-LLR-0038) ML23226A0762023-08-14014 August 2023 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Units 1 and 2 - Adopt 10 CFR 50.69 (L-2022-LLA-0182) ML23226A0692023-08-12012 August 2023 NRR E-mail Capture - (External_Sender) July 2023 FPL Marine Turtle Removal Monthly Report ML23223A0152023-08-11011 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PR-10 (L-2023-LLR-0039) ML23191A1952023-07-10010 July 2023 NRR E-mail Capture - (External_Sender) June 2023 FPL Marine Turtle Removal Monthly Report ML23216A1412023-06-30030 June 2023 August 2023 RP Inspection Document Request ML23248A1292023-06-29029 June 2023 NRR E-mail Capture - St Lucie 50.69 - Additional Audit Questions ML23198A0662023-06-22022 June 2023 NRR E-mail Capture - (External_Sender) Green Turtle Nest on Canal Bank, June 2023 ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23198A0642023-06-12012 June 2023 NRR E-mail Capture - (External_Sender) Loggerhead Nest on Canal Bank, May 2023 ML23163A1732023-06-10010 June 2023 NRR E-mail Capture - (External_Sender) May 2023 FPL Marine Turtle Removal Monthly Report ML23163A1222023-05-30030 May 2023 NRR E-mail Capture - (External_Sender) Nest on Intake Canal Bank ML23137A0942023-05-17017 May 2023 NRR E-mail Capture - Audit Plan - St Lucie Plant, Units 1 and 2 - 10 CFR 50.69 LAR ML23138A0212023-05-17017 May 2023 Telephone Record, Call with Florida Power and Light Regarding Decommissioning Funding Plan Update Dated March 30, 2021 ML23135A0292023-05-12012 May 2023 NRR E-mail Capture - (External_Sender) April 2023 FPL Marine Turtle Removal Monthly Report ML23129A8312023-05-0808 May 2023 NRR E-mail Capture - Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23198A1592023-04-0707 April 2023 NRR E-mail Capture - (External_Sender) March 2023 FPL Marine Turtle Removal Monthly Report ML23074A2292023-03-15015 March 2023 NRR E-mail Capture - (External_Sender) February 2023 FPL Marine Turtle Removal Monthly Report ML23041A2262023-02-10010 February 2023 NRR E-mail Capture - (External_Sender) January 2023 FPL Marine Turtle Removal Monthly Report ML23065A1142023-02-0101 February 2023 NRR E-mail Capture - (External_Sender) FPL St. Lucie Plant Biological Opinion SERO-2019-03494 - Submittal ML23254A4022023-01-24024 January 2023 RP Inspection_2023-001_Document Request ML23019A0142023-01-18018 January 2023 NRR E-mail Capture - (External_Sender) Regarding St. Lucie Olive Ridley Capture 1/3/2023 ML23006A1882023-01-0606 January 2023 NRR E-mail Capture - (External_Sender) December 2022 FPL Marine Turtle Removal Monthly Report ML23006A1822023-01-0606 January 2023 NRR E-mail Capture - (External_Sender) Psl Smalltooth Sawfish Capture 1/5/23 ML23006A0242023-01-0505 January 2023 NRR E-mail Capture - (External_Sender) Psl Olive Ridley Capture 1323 ML23019A2052022-12-24024 December 2022 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors - Acceptance Review ML22348A1002022-12-14014 December 2022 NRR E-mail Capture - (External_Sender) November 2022 FPL Marine Turtle Removal Monthly Report ML22325A0682022-11-18018 November 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA RAI Set 4 ML22319A0762022-11-15015 November 2022 NRR E-mail Capture - (External_Sender) October 2022 FPL Marine Turtle Removal Monthly Report ML22285A2222022-10-12012 October 2022 NRR E-mail Capture - (External_Sender) September 2022 FPL Marine Turtle Removal Monthly Report ML22270A1492022-09-26026 September 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA Second Round RAI Letter 2 - Class 1 Fatigue ML22286A1612022-09-16016 September 2022 August 2022 FPL St. Lucie Marine Turtle Removal Report ML22234A1552022-08-22022 August 2022 NRR E-mail Capture - (External_Sender) July 2022 FPL Marine Turtle Removal Monthly Report ML22227A0522022-08-15015 August 2022 NMFS to NRC, Transmittal of Final Biological Opinion for Continued Operation of St. Lucie Nuclear Power Plant ML22217A0022022-08-0404 August 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA Second Round RAI Letter 1) ML22210A0782022-07-22022 July 2022 Stl 2022003 Document Request ML22194A0482022-07-12012 July 2022 NRR E-mail Capture - (External_Sender) June 2022 FPL Marine Turtle Removal Monthly Report ML22193A0862022-07-11011 July 2022 Email - St. Lucie SLRA - Request for Additional Information Set 3 ML22165A2992022-06-14014 June 2022 NRR E-mail Capture - (External_Sender) May 2022 FPL Marine Turtle Removal Monthly Report ML22147A0862022-05-26026 May 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA - RCI Set 1 2023-09-11 |
Text
From: Gibson, Lauren To: Maher, William; Franzone, Steve; James, Lois; Rodriguez-Luccioni, Hector; Caldwell, Bob
Subject:
St. Lucie SLR Application Accepted Date: Friday, September 17, 2021 8:43:03 AM
Dear Bill,
I am pleased to tell you that we have completed our acceptance review of the St.
Lucie SLR application and have determined it is acceptable for docketing. You will receive the formal letter notifying you of that in the near future, and we will now begin our in-depth technical review.
I look forward to working with you as the review progresses. Please feel free to contact me at any time.
Thank you, Lauren
Retrieved from "https://kanterella.com/w/index.php?title=ML21266A041&oldid=3405253"