From:
Scott Wall Sent:
Wednesday, April 17, 2024 11:34 AM To:
Mack, Kenneth Cc:
Schultz, Eric; Phillabaum, Jerry
Subject:
Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Revision to Reactor Vessel Surveillance (EPID: L-2024-LLL-0006)
Dear Kenneth Mack:
By letter dated March 25, 2024 (Agencywide Documents Access and Management System Accession No. ML24087A033), NextEra Energy Point Beach, LLC (NextEra, the licensee),
submitted a requested to revise the surveillance capsule withdrawal schedule in the Current Licensing Basis (CLB) for Point Beach Nuclear Plant, Units 1 and 2 (Point Beach).
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed exemption in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this review will take approximately 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> to complete. The NRC staff expects to complete this review by September 2024. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application, and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review, review by NRC advisory committees, or hearing-related activities.
If you have any questions, please contact me at (301) 415-2855 or e-mail at Scott.Wall@nrc.gov.
Scott P. Wall Senior Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
301.415.2855 Scott.Wall@nrc.gov
Hearing Identifier:
NRR_DRMA Email Number:
2476 Mail Envelope Properties (SA1PR09MB9605CB775461ABE1598CBB64920F2)
Subject:
Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Revision to Reactor Vessel Surveillance (EPID L-2024-LLL-0006)
Sent Date:
4/17/2024 11:34:23 AM Received Date:
4/17/2024 11:34:28 AM From:
Scott Wall Created By:
Scott.Wall@nrc.gov Recipients:
"Schultz, Eric" <Eric.Schultz@nexteraenergy.com>
Tracking Status: None "Phillabaum, Jerry" <Jerry.Phillabaum@fpl.com>
Tracking Status: None "Mack, Kenneth" <Kenneth.Mack2@fpl.com>
Tracking Status: None Post Office:
SA1PR09MB9605.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2860 4/17/2024 11:34:28 AM Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date: