Acceptance Review Concerning License Amendment Request to Adopt NFPA-805, Performance-Based at Standard for Fire Protection for Light Water Reactor Electric Generating Plants,
ML13169A296
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/18/2013
From: Siva Lingam
Plant Licensing Branch II
To: Nazar M
Florida Power & Light Co
Lingam S NRR/DORL/LPL2-2
References
TAC MF1373, TAC MF1374
Download: ML13169A296 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 June 18, 2013 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420 SUB,JECT:

S1. LUCIE PLANT, UNITS 1 AND 2 - ACCEPTANCE REVIEW CONCERNING LICENSE AMENDMENT REQUEST TO ADOPT NATIONAL FIRE PROTECTION ASSOCIATION STANDARD NFPA 80S, "PERFORMANCE BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS" (TAC NOS. MF1373 AND MF1374)

Dear Mr. Nazar:

By letter dated March 22, 2013, as supplemented by letter dated June 14, 2013, Florida Power

&Light Company submitted a license amendment request (LAR) to transition the fire protection licensing basis at the St. Lucie Plant, Units 1 and 2, from Title 10 of the Code of Federal Regulations (CFR), Section 50.48(b}, to 10 CFR 50.48(c), National Fire Protection Association Standard NFPA 805.

Consistent with Section 50.90 of 10 CFR, an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment.

Consistent with Section 9.1 of the NRC Enforcement Policy, because the NRC found the submitted LAR acceptable for detailed review, enforcement discretion for previously identified noncompliances and newly identified noncompliances discovered either by the licensee or the NRC while the LAR is under review will continue to be in place until the NRC disposition of the LAR.

M. Nazar

- 2 Given the lesser scope and depth of the acceptance review, as compared to the detailed technical review, there are instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

If you have any questions, please contact me at (301) 415-1564.

Sincerely,

~\\f'OC~

Siva P. Lingam, Project Manager Plant licenSing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-335 and 50-389 cc: Distribution via Listserv

M. Nazar

- 2 Given the lesser scope and depth of the acceptance review, as compared to the detailed technical review, there are instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.

If you have any questions, please contact me at (301) 415-1564.

Sincerely, IRA!

Siva P. Lingam, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-335 and 50-389 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL2-2 Reading File RidsAcrsAcnw _MaiICTR RidsNrrDorl RidsNrrDorlDpr RidsNrrLABClayton RidsNrrDorlLpl2-2 RidsNrrPMStLucie RidsRgn2MailCenter RidsNrrDraAfpb RidsNrrDraApla RidsN rrDssStsb RidsNrrDraAadb J. Robinson, NRR K. Hemphill, NRR R. Gallucci, NRR H. Barrett, NRR R. Rodriguez, NRR R. Conatser, NRR C. Moulton, NRR L. Fields, NRR ADAMS Accesslon N0.: ML13169A296

  • byemal'1 OFFICE LPLlI-2/PM LPLlI-2/LA AFPB/BC APLAlBC MDB/BC LPLlI-2/BC LPLlI-2/PM NAME SLingam BClayton AKlein*

HHamzehee* TTate*

CGratton for JQuichocho SLingam DATE 6/18/13 6/18/13 6/18/13 6/18/13 6/18/13 6/18/13 6/18/13 OFFICIAL RECORD COPY