ML24137A188

From kanterella
Revision as of 15:04, 4 October 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides
ML24137A188
Person / Time
Site: Beaver Valley, Calvert Cliffs, Peach Bottom, Salem, Nine Mile Point, Hope Creek, Susquehanna, Limerick, Ginna, FitzPatrick  Constellation icon.png
Issue date: 05/16/2024
From:
NRC/RGN-I/DORS
To:
References
Download: ML24137A188 (1)


Text

2023 Annual Assessment Meeting

Region I King of Prussia, PA May22, 2024

1 Meeting Conduct

  • All participants will be muted during presentations by NRC staff.
  • The chat is enabled to allow you to ask questions during the meeting.
  • We encourage mutual respect on the part of NRC staff and attendees.

2 How to Ask a Question

  • Type in your question at any time using Microsoft Teams.

- or -

  • You can wait until the question-and-answer session to ask your question orally.

3 Agenda

  • Reactor Oversight Process (ROP)
  • 2023 Safety Performance Overview

- FitzPatrick

- Ginna

- Nine Mile Point

- Beaver Valley

- Calvert Cliffs

- Hope Creek

- Salem

- Limerick

- Peach Bottom

- Susquehanna

  • Question-and-Answer Session 4

Our Mission

To license and regulate the nations civilian use of radioactive materials to provide reasonable assurance of adequate protection of public health and safety and to promote the common defense and security and protect the environment.

5 Action Matrix Concept

Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Performance Degraded Performance Cornerstone

Increasing Safety Significance

Increasing NRC Inspection Efforts

Increasing NRC/Licensee Management Involvement

Increasing Regulatory Actions

6 Reactor Oversight Process

7 Types of Inspections

  • Baseline Inspection Program

- Minimum level of inspection conducted at all facilities regardless of their performance.

- Events involving reactor facilities are investigated in a timely, objective, systematic and technically sound manner.

  • Supplemental Inspections (e.g., IP 95001)

- Applies NRC inspection resources in a graded manner when risk-significant performance issues are identified.

8 Reactor Oversight Process

9 Facility Information Finder

  • Additional Plant Information
  • Safety Performance Summary
  • Inspection Reports
  • NRC Points of Contact

10 Projects Branch 1

Erin Carfang Branch Chief

Ginna FitzPatrick Nine Mile Point

11 R.E. Ginna Resident Inspectors

Jason Schussler Chris Swisher Senior Resident Inspector Resident Inspector

Facility Information Finder R.E. Ginna Nuclear Power Plant, Unit 1

12 R.E. Ginna 2023 Assessment Summary

  • Operated safely and in a manner that preserved the public health and safety and protected the environment
  • Licensee Response Column
  • 4,300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> of inspectionand related activities
  • Green Performance Indicators
  • 6 Green Findings

13 James A. FitzPatrick Resident Inspectors

Eric Miller Veronica Fisher Senior Resident Inspector Resident Inspector

Facility Information Finder James A. Fitzpatrick Nuclear Power Plant, Unit 1

14 James A. FitzPatrick 2023 Assessment Summary

  • Operated safely and in a manner that preserved the public health and safety and protected the environment
  • Licensee Response Column
  • 6,500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> of inspection and related activities.
  • Green Performance Indicators

15 Nine Mile Point Resident Inspectors

Chris Kline Beth Sienel Senior Resident Inspector Resident Inspector

Facility Information Finder Nine Mile Point Nuclear Station, Unit 1 / Nine Mile Point Nuclear Station, Unit 2

16 Nine Mile Point 2023 Assessment Summary

  • Operated safely and in a manner that preserved the public health and safety and protected the environment
  • Licensee Response Column
  • 9,100hours of inspection and related activities
  • Green Performance Indicators
  • 1 Green Finding

17 Projects Branch 2

Matt Young Branch Chief

Beaver Valley

18 Beaver Valley Resident Inspectors

Neil Day Alex Nugent Senior Resident Inspector Resident Inspector

Facility Information Finder Beaver Valley Power Station, Unit 1 / Beaver Valley Power Station, Unit 2

19 Beaver Valley 2023 Assessment Summary

  • Operated safely and in a manner that preserved the public health and safety and protected the environment
  • Licensee Response Column
  • 5,700hours of inspection and related activities
  • Green Performance Indicators
  • 12 Green Findings

20 Projects Branch 3

Brice Bickett Branch Chief

Calvert Cliffs Hope Creek Salem

21 Calvert Cliffs Resident Inspectors

Gene DiPaolo Anthony Tran Senior Resident Inspector Resident Inspector

Facility Information Finder Calvert Cliffs Nuclear Power Plant, Unit 1 / Calvert Cliffs Nuclear Power Plant, Unit 2

22 Calvert Cliffs 2023 Assessment Summary

  • Operated safely and in a manner that preserved thepublic health and safety and protected theenvironment
  • Unit 1 - Regulatory Response Column (Licensee Response Column as of March 21, 2024)

Unit 2-Licensee Response Column

  • 8,200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> of inspection and related activities
  • Green Performance Indicators
  • 10 Green & 1 White Findings
  • 1 Severity Level IV Violation Calvert Cliffs Unit 1 Action Matrix - Regulatory Response

Licensee Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Degraded Response Response Performance Cornerstone Performance

  • The Special Inspection team identified a White Finding (3Q23) related to inadequate maintenance practices for the1A emergency diesel generator.
  • Supplemental Inspection (IP 95001) was recently completed, and the plant transitioned from the Regulatory Response to the Licensee Response Column effective March 21, 2024.

24 Hope Creek Resident Inspectors

Jigar Patel Justin Bresson Senior Resident Inspector Resident Inspector Facility Information Finder Hope Creek Generating Station, Unit 1

25 Hope Creek 2023 Assessment Summary

  • Operatedsafely and in a manner thatpreservedthepublic health and safety and protectedtheenvironment
  • Licensee Response Column
  • 4,600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> of inspection and related activities
  • Green Performance Indicators

26 Salem Resident Inspectors

Larry Grimes Eli Garcia Senior Resident Inspector Resident Inspector (acting)

Facility Information Finder Salem Nuclear Generating Station, Unit 1 / Salem Nuclear Generating Station, Unit 2

27 Salem 2023 Assessment Summary

  • Operatedsafely and in a manner that preserved thepublic health and safety and protected theenvironment
  • Licensee Response Column
  • 6,900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> of inspection andrelated activities
  • Green Performance Indicators
  • 12 Green Findings

28 Projects Branch 4

Jon Greives Branch Chief

Limerick Peach Bottom Susquehanna

29 Limerick Resident Inspectors

Adam Ziedonis Eric Miller Senior Resident Inspector Resident Inspector (acting)

Facility Information Finder Limerick Generating Station, Unit 1 / Limerick Generating Station, Unit 2

30 Limerick 2023 Assessment Summary

  • Operated safely and in a manner that preserved the public health and safety and protected the environment
  • Licensee Response Column
  • 5,900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> of inspection and related activities
  • Green Performance Indicators
  • 6 Green Findings

31 Peach Bottom Resident Inspectors

Scott Rutenkroger Corey Dukehart Senior Resident Inspector Resident Inspector

Facility Information Finder Peach Bottom Atomic Power Station, Unit 2 / Peach Bottom Atomic Power Station, Unit 3

32 Peach Bottom 2023 Assessment Summary

  • Operated safely and in a manner that preserved the public health and safety and protected the environment
  • Unit 2 - Licensee Response Column(June 8, 2023)

Unit 3-Licensee Response Column

  • 7,100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> of inspection and related activities.
  • Green Performance Indicators
  • 10 Green Findings and 1 Severity Level IV Violation 33 Peach Bottom Unit 2 Action Matrix Transition

Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Performance Degraded Performance Cornerstone

Supplemental inspection (IP 95001) was completed in response to a White Finding (3Q22) related to use of aprocedure not appropriate for plant conditions that led to a reactor scram, or shutdown. The plant transitioned from the Regulatory Response to the Licensee Response Column effective June 8, 2023.

34 Susquehanna Resident Inspectors

Jennifer England Erin Brady Senior Resident Inspector Resident Inspector

Facility Information Finder Susquehanna Steam Electric Station, Unit 1 / Susquehanna Steam Electric Station, Unit 2

35 Susquehanna 2023 Assessment Summary

  • Operated safely and in a manner that preserved the public health and safety and protected the environment
  • Licensee Response Column
  • 5,800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> of inspection and related activities
  • Green Performance Indicators
  • 3 Green Findings

36 How to Ask a Question

  • Type your question in the meeting chat
  • Use the hand raise feature
  • Phone only attendees will also be asked if they have any questions (*5 - hand raise,
  • 6 - mute/unmute)

37 NRC Social Media Channels

  • Facebook www.facebook.com/nrcgov
  • Twitter twitter.com/nrcgov
  • YouTube www.youtube.com/user/NRCgov
  • Instagram www.instagram.com/nrcgov
  • Flickr www.flickr.com/photos/nrcgov/sets
  • LinkedIn www.linkedin.com/company/u-s--nuclear-regulatory-commission/mycompany/
  • GovDelivery service.govdelivery.com/accounts/USNRC/sub scriber/new

38 More Information

  • Inspection Reports

- https://www.nrc.gov/reactors/operating/oversight/listofrpts-body.html

  • Reactor Oversight Process

- https://www.nrc.gov/reactors/operating/oversight.html

  • Fact Sheets and Brochures

- https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/

  • NRC Information Digest

- https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/

  • Regulations

- https://www.nrc.gov/reading-rm/doc-collections/cfr/

39 Supplemental Meeting Feedback

We are looking for specific feedback on the format and content of this meeting

https://feedback.nrc.gov/pmfs/feedback/form?meetingcode=20240563

40