WBL-24-043, Emergency Plan Implementing Procedure Revisions

From kanterella
Revision as of 22:28, 3 October 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Emergency Plan Implementing Procedure Revisions
ML24260A124
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 09/16/2024
From: Reneau W
Tennessee Valley Authority
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
References
WBL-24-043
Download: ML24260A124 (1)


Text

TENNESSEE 1\\14 AUTHORITY VALLEY

Po st Office Box 2000, Spri ng City, Tennes see 373 8 1

WBL-24-043

September 16, 2024

10 CFR 50.54(q)(5) 10 CFR 72.44(f)

ATTN : Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License Nos. NPF-90 and NPF-96 NRC Docket Nos. 50-390, 50-391, and 72-1048

Subject:

Emergency Plan Implementing Procedure Revisions

Pursuant to Title 10, Code of Federal Regulations (10 CFR) 50.54(q)(5), and 10 CFR 72.44(f),

Tennessee Valley Authority (TVA) is submitting a description of changes to the Watts Bar Nuclear Plant (WBN) Radiological Emergency Plan (REP). The affected documents are the WBN Emergency Plan Implementing Procedures (EPIP) listed below :

EPIP Revision Title Effective Date

5 65 General Emergency 08/21/2024 6 60 Activation and Operation of the Techn ic al 08/21/2024 Support Center (TSC)

Description of Changes

EPIP-5 revision 65 enacted the following changes :

  • Added protective action recommendations (PAR) 6 and 7 to forms and attachments to align with emergency plan classification logic procedure changes.
  • Added steps to notify the NRC of all REP declarations and PAR changes.
  • Updated the initial notification form.

U.S. Nuclear Regulatory Commission WBL-24-043 Page 2 September 16, 2024

EPIP-6 revision 60 enacted the following changes:

  • Added PARs 6 and 7 to the Site Emergency Director turnover data sheet.
  • Edited operational responsibilities of the positions of Operations Manager, Operations Communicato r and Main Control Room Communicator.
  • Deleted operational responsibility bullets from two procedure checklists for initial support center activation.
  • Added responsibilities to the NRG Coordinator checklist to ensure NRG is notified of declarations and upgrades.

These listed changes were evaluated in accordance with 10 CFR 50.54(q)(3) and 10 CFR 72.44(f). TVA determined that the changes did not reduce the effectiveness of the WBN REP.

The WBN REP, as revised, continues to meet the requirements in Appendix E to 10 CFR 50 and the planning standards of 10 CFR 50.47(b).

There are no new regulatory commitments in this letter. Please direct all questions concerning this matter to Michael White, Emergency Preparedness Manager, at mrwhite@tva.gov.

Respectfully, /}/

~r.?~

Site Vice President Watts Bar Nuclear Plant

cc :

NRG Regional Administrator - Region II NRG Senior Resident Inspector - Watts Bar Nuclear Plant NRG Project Manager - Watts Bar Nuclear Plant NRG Director - Division of Fuel Management, NMSS