WBL-24-008, Emergency Plan Implementing Procedure Revision

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedure Revision
ML24060A087
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 02/29/2024
From: Anthony Williams
Tennessee Valley Authority
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
References
WBL-24-008
Download: ML24060A087 (1)


Text

Post Office Box 2000, Spring City, Tennessee 37381 WBL-24-008 February 29, 2024 10 CFR 50.54(q)(5) 10 CFR 72.44(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License Nos. NPF-90 and NPF-96 NRC Docket Nos. 50-390, 50-391, and 72-1048

Subject:

Emergency Plan Implementing Procedure Revision Pursuant to Title 10, Code of Federal Regulations (10 CFR) 50.54(q)(5), and 10 CFR 72.44(f),

Tennessee Valley Authority (TVA) is submitting a description of changes to the Watts Bar Nuclear Plant (WBN) Radiological Emergency Plan (REP). The affected document is the WBN Emergency Plan Implementing Procedure (EPIP) listed below:

EPIP Revision Title Effective Date 13 35 Initial Dose Assessment for Radiological Emergencies 02/12/2024 Description of Changes EPIP-13 Revision 35 enacted the following change:

Corrected typographical errors in Section 2.2 (Developmental References).