WBL-24-004, Emergency Plan Implementing Procedure Revision

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedure Revision
ML24046A136
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 02/15/2024
From: Anthony Williams
Tennessee Valley Authority
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
References
WBL-24-004
Download: ML24046A136 (1)


Text

Post Office Box 2000, Spring City, Tennessee 37381 WBL-24-004 February 15, 2024 10 CFR 50.54(q)(5) 10 CFR 72.44(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License Nos. NPF-90 and NPF-96 NRC Docket Nos. 50-390, 50-391, and 72-1048

Subject:

Emergency Plan Implementing Procedure Revision Pursuant to Title 10, Code of Federal Regulations (10 CFR) 50.54(q)(5), and 10 CFR 72.44(f),

Tennessee Valley Authority (TVA) is submitting a description of changes to the Watts Bar Nuclear Plant (WBN) Radiological Emergency Plan (REP). The affected document is the WBN Emergency Plan Implementing Procedure (EPIP) listed below:

EPIP Revision Title Effective Date 12 53 Emergency Equipment and Supplies 01/30/2024 Description of Changes EPIP-12 Revision 53 enacted the following changes:

Performed some minor editorial changes (e.g. date changes, spelling, typographical issues, formatting, and capitalization) throughout the procedure

U.S. Nuclear Regulatory Commission WBL-24-004 Page 2 February 15, 2024 Updated the following inventory attachments to add/remove/update items, merge common procedures and, and make editorial changes: Attachment 1 (Quarterly Technical Support Center (TSC)), Attachment 2 (Quarterly Operations Support Center (OSC)), Attachment 4 (Quarterly Training Center Checks), Attachment 8 (Quarterly Agreement Hospital(s) Cabinet Inventory Rhea/ Athens), Attachment 13 (Quarterly Check of Equipment Important To Emergency Response (EITER)), and Attachment 16 (Quarterly Alternate Facility Checks)

Renamed "Emergency Communicator" to "MGR Communicator" in Attachment 15 (Quarterly Simulator Checks)

Moved portable generator checks to more appropriate attachments Renamed Attachments to include performance frequency Deleted references to "Plantronics" Portable Phones from Attachment 2 Added location of the Emergency Communication Notification System (ECNS) manual in (Monthly Testing of Communications Equipment)

De-unitized Emergency Management Guideline (EMG-0), Emergency Contingency Actions (ECAs), Emergency Operating Instructions (EOls) and Functional Restorations (FRs) and made procedure acronyms plural throughout procedure Attachments.

The above changes were evaluated in accordance with 10 CFR 50.54(q)(3) and 10 CFR 72.44(f). TVA determined that the changes did not reduce the effectiveness of the WBN REP. The WBN REP, as revised, continues to meet the requirements in Appendix E to 10 CFR 50 and the planning standards of 10 CFR 50.47(b).

There are no new regulatory commitments in this letter. Please direct all questions concerning this matter to Michael White, Emergency Preparedness Manager, at mrwhite@tva.gov.

Resp.eetfal,

Anthony L. Williams IV Site Vice President Watts Bar Nuclear Plant cc:

NRG Regional Administrator - Region II NRG Senior Resident Inspector - Watts Bar Nuclear Plant NRG Project Manager - Watts Bar Nuclear Plant NRG Director - Division of Fuel Management, NMSS