Category:CORRESPONDENCE-LETTERS
MONTHYEARML20202D4861998-02-12012 February 1998 Ack Receipt of & Check in Amount of $55,000 in Payment for Civil Penalty Proposed by NRC in . Corrective Actions Will Be Examined During Future Insps IR 05000485/19960241997-03-0505 March 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-485/96-24 IR 05000485/19850711986-06-17017 June 1986 Ack Receipt of 851204 & s Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-485/85-71 ML18037A3791982-05-27027 May 1982 Forwards Annual Financial Repts 1981 for Niagara Mohawk Power Corp,Ny State Electric & Gas Corp,Lilco,Rochester Gas & Electric Corp & Central Hudson Gas & Electric Corp ML17258A1861981-09-22022 September 1981 Forwards Endorsements 73 & 74 to ANI Policy NF-170 ML20003G2671981-04-22022 April 1981 Forwards Second Draft Safety Evaluation of Snupps 10.1,10.2, 10.3,10.4.1 & 10.4.4, Steam & Power Conversion Sys. ML17258A7951981-02-10010 February 1981 Forwards Summary of Actual Cash Flow for 1980,projected Cash Flow for 1981 & Financial Statement for 3 & 12 Months Ended 801231.Info Supports Util Guarantee to Pay Retrospective Premiums Required by Secondary Financial Protection Sys ML17258A7371981-01-14014 January 1981 Forwards Public Version of Upgraded Evacuation Time Estimates for Facilities in Response to NRC 801209 Ltr ML17250A7161980-10-29029 October 1980 Informs of Changes in Organizational Structure Per FE Drake Retirement as Board Chairman & Chief Executive Officer. Corporate Organization Chart,Effective 801001,encl ML19338C4601980-08-11011 August 1980 Requests Info Re Basis for Denial of Certificate for Facility ML19320A5831980-06-16016 June 1980 Responds to IE Bulletin 80-09, Hydramotor Actuator Deficiencies. Two safety-related Uses of Itt General Controls Models AH-90 & NH-90 Series Hydramotor Actuators Have Been Identified.Itt Is Testing Actuators ML17250A3321980-06-12012 June 1980 Comments on 800506 Presentation to NRC Commissioners Re Status of SEP & Description of Difficulty as Lack of Aggression by Licensees.Nrc Has Not Provided Guidelines. Issues W/Higher Priorities Have Arisen ML19323H2791980-06-0606 June 1980 Responds to IE Bulletin 80-05 Re Vacuum Condition Resulting in Damage to Chemical Vol Control Sys Holdup Tanks.Tank Damage Due to Vacuum Conditions Precluded by Design Provisions or Suitable Vent Connections ML19318C1861980-06-0202 June 1980 Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. Top Cover Gaskets on Switches W/Applicable Date Codes Will Be Replaced on Valves Listed in Encl ML17249A9111980-04-30030 April 1980 Forwards Response to IE Bulletin 80-04. Analysis of PWR Main Steam Line Break W/Continued Feedwater Addition. Auxiliary Feedwater Flow Becomes Dominant Factor in Determining Duration & Magnitude of Steam Flow Transient ML20003H9601980-04-18018 April 1980 Advises That Licensee Considers 800320 Deficiency Rept Final.No Addl Action Planned Unless Required by New Info ML19309G0821980-03-20020 March 1980 Responds to IE Bulletin 80-03 Re Charcoal Tray Adsorber Cells.Design & Manufacturer of Adsorber Cells Planned to Be Used Are Different than Type Described in Bulletin ML19305C3721980-03-20020 March 1980 Informs That Snupps Utils Are Investigating Hardware Changes to Preclude Need for Tests to Correct Deficiency in Engineered Safety Features Actuation Sys.Tests Will Be Made Part of Plant Procedures If Changes Are Not Feasible ML19305D5111980-03-20020 March 1980 Discusses Undetectable Failure in Engineered Safety Features Actuation Sys.Utils Are Investigating Hardware Changes That May Preclude Further Testing,Provided That Changes Are Feasible.Otherwise,Tests Will Continue ML19305C3751980-03-20020 March 1980 Informs That C-E 791026 Amend to Rept on IE Bulletin 78-12, Atypical Weld Matl in Reactor Pressure Vessel Welds, Should Be Considered Part of Util Bulletin Response ML19323D2451980-03-20020 March 1980 Responds to IE Bulletins 78-12,12A & 12B, Atypical Weld Matl in Reactor Pressure Vessel Welds. Util 790629 Ltr & C-E 791026 Ltr to NRC Constitutes Response to Bulletin ML19323C4271980-03-0606 March 1980 Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. Identification of Switches Has Required More Time than Anticipated.Util Will Respond as Soon as Possible ML19309D3451980-03-0606 March 1980 Responds to IE Bulletin 79-28.Investigation Re Planned Use of Namco EA180 Switches,Identification in Snupps Design & Development of Plans for Corrective Action Requires More Time than Anticipated.Will Forward Response Later ML19294B1451980-02-22022 February 1980 Disagrees W/Nrc Plans Re ATWS Issue.New Plans May Not Serve Best Interests of Public Health & Safety.Nrc Should Not Impose Requirements Before Thorough Review of Mass of Technical Info Supplied Last Year ML19296C5711980-02-19019 February 1980 Responds to NRC 800204 Ltr Received 800213 Re NRC 800208 Meeting W/Snupps Representatives to Discuss Snupps QA Program.Requests NRC Reschedule Meeting & Provide State Public Svc Commission Sufficient Time to Participate ML19294B8661980-02-14014 February 1980 Forwards Ny State Board on Electric Generation Siting & Environ 800211 Opinion & Order Vacating Previously Granted Certificate.Denies Application & Closes Proceeding ML19260D5621980-02-0505 February 1980 Forwards Supplemental Deficiency Rept Re Qualification of Control Sys ML19309B5491980-02-0505 February 1980 Forwards Supplemental Rept on Potential Deficiency Re Qualification of Control Sys Discussed in Util 790928 Ltr.No Unresolved Safety Concerns Re Pressure Controllers & Main Steam Line Atmospheric Relief Valve ML19296D9961980-02-0101 February 1980 Responds to IE Bulletin 79-28.Investigation Re Planned Use of Namco EA180 Switches for Snupps Facilities Not Complete.Investigation Results & Corrective Actions Will Be Submitted in 3-4 Wks ML19294B1891980-01-30030 January 1980 Notifies That Ny State Board on Electric Generation Siting & Environ Voted on 800123 to Rescind Approval of Plant Const & Operation.No Decision Can Be Made Re Continuation of NRC Proceedings Until Util Has Received Formal Opinion ML19260E0561980-01-30030 January 1980 Notifies of Ny State Board on Electric Generation Siting & Environ 800123 Decision to Rescind Prior Approval of Const & Operation of Facility.No Date Set for Formal Opinion. Certificate of Svc Encl ML19296B9801980-01-18018 January 1980 Forwards RO Pohl Testimony on Radon Emissions from U Mill Tailings Piles ML19308C9981980-01-18018 January 1980 Responds to IE Bulletin 79-25.Westinghouse Bfd/Nbfd Relays Are Not Included in safety-related Portions of Design ML19211D2751980-01-14014 January 1980 Discusses NRC Delay in Review of FSAR & OL Application. Review Schedule Should Be Established Promptly ML19257B8871980-01-0404 January 1980 Responds to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. No Such Relays Have Been Identified.Will Advise Further in Two Wks ML19291C3061980-01-0303 January 1980 Responds to IE Bulletin 79-02,Revision 2.Initial Response Satisfies Requirements of Revision 1.Facility Does Not Use Concrete Expansion Anchor Bolts to Support Seismic Category I Piping ML19296D7051980-01-0303 January 1980 Responds to IE Bulletin 79-02,Revision 1.Initial 790705 Response Resolves NRC Concerns Re Use of Concrete Expansion Anchor Bolts for Pipe Support Base Plates.Util Does Not Use Expansion Anchors in Concrete or Structural Steel Members ML19262C4241980-01-0303 January 1980 Responds to IE Bulletin 79-02,Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Expansion Anchors in Concrete Block Walls Not Used.Util 790705 Response Need Not Be Modified or Amended ML17249A4551980-01-0202 January 1980 Supplements 791212 Ltr Listing Six Suits Against Util. Seventh,Ew Garrett Vs Util,Received ML19262B5671979-12-20020 December 1979 Responds to NRC 791018 Request for Addl Info Re Snupps Fire Protection Sys.Detailed Responses to Requests Will Be Included in FSAR Revision.Clarification of Sys Description Will Show Design in Compliance W/Nrc Requirements ML19262B5831979-12-14014 December 1979 Discusses Potential Deficiency,Per 791116 Telcon to Nrc. Westinghouse Review Reveals That Dropped Rod Safety Analysis Deficiency May Affect Four Addl Loop Plants.Further Info Will Be Provided by FSAR Revision ML19253C9361979-12-0606 December 1979 Notifies of Corrective Action for Potential Deficiency Re Engineered Safety Features Actuation Sys.Test Sequence to Detect Failure Will Be Incorporated Into Appropriate Procedures ML19260C9481979-11-29029 November 1979 Forwards Final Deficiency Rept Re Gulf & Western Preassembly Formations ML19305B9591979-11-0707 November 1979 Discusses Undetectable Failure in Engineered Safety Features Actuation Sys.Failure of P-4 Permissive Circuit in Both Redundant Protection Trains Could Result in Failure of Sys to Automatically Initiate Protective Function.Details Encl ML19210C1331979-11-0707 November 1979 Confirms That Snupps FSAR Should Be Considered Tendered by Util.Snupps FSAR Will Be Incorporated by Formal Amend to License Application ML19211A4241979-11-0101 November 1979 Submits Generic Response to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. Seismic Analysis Input Info Conforms to Actual as-built Configuration of safety-related Sys ML19254F2061979-11-0101 November 1979 Requests NRC Concurrence on Usage of ASME Section III Code Case N-240, Hydrostatic Testing of Open-Ended Piping, Section Iii,Div 1. ML19253C5961979-10-26026 October 1979 Responds to IE Bulletin 79-23 Re Potential Failure of Emergency Diesel Generator Field Exciter Transformer.Problem Not Applicable to Snupps Diesel Generators ML20125B3041979-10-18018 October 1979 Forwards Request for Addl Info Re QA Aspects of Fire Protection Sys for Snupps Portion of Facilities ML19253C7981979-10-15015 October 1979 Forwards Interim Deficiency Rept Re Qualification of Control Sys.Supplemental Rept in Approx Three Months 1998-02-12
[Table view] Category:NRC TO UTILITY
MONTHYEARIR 05000485/19850711986-06-17017 June 1986 Ack Receipt of 851204 & s Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-485/85-71 ML20125B3041979-10-18018 October 1979 Forwards Request for Addl Info Re QA Aspects of Fire Protection Sys for Snupps Portion of Facilities ML20062H0921979-03-19019 March 1979 Forwards IE Bulletin 78-12B, Atypical Weld Matl in Reactor Pressure Vessel Welds ML20062F1351978-11-24024 November 1978 Forwards IE Bulletin 78-12A,suppl to IE Bulletin 78-12. W/Encl ANO:7811300055 ML20062E4211978-11-21021 November 1978 Notice of Seminar on 781208 on New Model Radiological Effluent Tech Specs for Nuc Pwr Plants.Requests Advance Submission of Seminar Specific Questions.W/Encl Seminar Info Sheet,Proposed Agenda & Maps ML20062G5591978-11-15015 November 1978 Forwards IE Inspec Rept 50-485/78-01 on 781023-25 During Which No Items of Noncompliance Were Noted ML20062D7021978-11-0606 November 1978 Forwards IE Circular 78-18,UL Fire Test.W/Encl ANO: 7811150002 ML20062A6421978-09-29029 September 1978 Forwards IE Bulletin 78-12 Atypical Weld Matl in Reactor Pressure Vessel Welds Requesting Action in 60 Days.List of Bulletins Issued in 1978 Encl 1986-06-17
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20202D4861998-02-12012 February 1998 Ack Receipt of & Check in Amount of $55,000 in Payment for Civil Penalty Proposed by NRC in . Corrective Actions Will Be Examined During Future Insps IR 05000485/19960241997-03-0505 March 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-485/96-24 IR 05000485/19850711986-06-17017 June 1986 Ack Receipt of 851204 & s Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-485/85-71 ML20125B3041979-10-18018 October 1979 Forwards Request for Addl Info Re QA Aspects of Fire Protection Sys for Snupps Portion of Facilities ML20062H0921979-03-19019 March 1979 Forwards IE Bulletin 78-12B, Atypical Weld Matl in Reactor Pressure Vessel Welds ML20062G1631978-12-12012 December 1978 Ack Ltr of 781207 Forwarding Petition for Review of Decision ALAB-507.Ltr & Petition Are Being Forwarded by Aslab to Comm for Latter'S Consideration ML20062F1351978-11-24024 November 1978 Forwards IE Bulletin 78-12A,suppl to IE Bulletin 78-12. W/Encl ANO:7811300055 ML20062E4211978-11-21021 November 1978 Notice of Seminar on 781208 on New Model Radiological Effluent Tech Specs for Nuc Pwr Plants.Requests Advance Submission of Seminar Specific Questions.W/Encl Seminar Info Sheet,Proposed Agenda & Maps ML20062G5591978-11-15015 November 1978 Forwards IE Inspec Rept 50-485/78-01 on 781023-25 During Which No Items of Noncompliance Were Noted ML20062D7021978-11-0606 November 1978 Forwards IE Circular 78-18,UL Fire Test.W/Encl ANO: 7811150002 ML20062A6421978-09-29029 September 1978 Forwards IE Bulletin 78-12 Atypical Weld Matl in Reactor Pressure Vessel Welds Requesting Action in 60 Days.List of Bulletins Issued in 1978 Encl 1998-02-12
[Table view] |
See also: IR 05000485/1978001
Text
__
e N,
.
~
_
PDA
g mRtc0 UNITED STATES
fi $ NUCLEAR REGULATORY COMMisslON
O
U 'j . "(/
e l[/ c REGION I
i
- 5 $31 P ARK AVENUE
o, [ KING QF PRUSSI A. PENNSYLV ANI A 19406
g ..,e * p
,,
HOV 15 IN3
Occket No. 50-485
Rochester Gas & Electric Corporation
ATTN: Mr. J. E. Arthur
Chief Engineer
39 East Avenue /,
Rochester, NY 14649 \
Gentlemen:
Subject: Inspec io,n 50-485 78-01
This refers to th inspect on conducted by Mr. J. Mattia of this office
, on October 23-25,19'78',1it ; Rochester Gas and Electric Corporation and at
<
the Sterling Power Project Site of activities authorized by NRC License
.
No. CPPR-156 and to the discussions of our findings held by Mr. Mattia
with Mr. C. Anderson and others of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of precedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room. If this report contains any information that you (or your contractor)
believe to De proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure. Any such application must be accompanied by an
affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which centains a statement
of reasons which addresses with specificity the items which will be
considered by the Ccmmission as listed in subparagraph (b) (4) of Section
2.790. The information sought tn :.e withheld shall be incorporated as
far as possible into a separate part of the affidavit. If we do not
hear from you in this regard within the specified period, the report
will be placed in the Public Document Rocm.
781029 6 A Yf q
.
. . ,
.
. .
Rochester Gas & Electric Corporation 2
No reply to this letter is required; however, should you have any questions
- concerning this inspection, we will be pleased to discuss them with you.
'
Sincerely,
W
, ,ftf thw
Robert T. Car son, Chief
Reactor Construction and Engineering
Support Branch
Enclosure: Office of Inspection and Enforcement Inspection
Report Number 50-485/78-01
cc w/ encl:
C. R. Anderson, Manager, QA
Lex K. Larson, Esquire
N. A. Petrick, Executive Director, SNUPPS l
Gerald Charnoff, Esquire
,
e