UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD, STE 102 KING OF PRUSSIA, PENNSLYVANIA 19406-2713 March 21, 2023 MEETING

SUMMARY

LICENSEE: DOMINION ENERGY NUCLEAR CONNECTICUT, INC.

FACILITY: MILLSTONE POWER STATION, UNITS 2 AND 3

SUBJECT:

SUMMARY

OF PUBLIC MEETING On March 16, 2023, at 6:30 p.m., the U.S. Nuclear Regulatory Commission (NRC) was part of a public meeting with the Connecticut Nuclear Energy Advisory Council (NEAC). During the first part of the meeting, the NRC staff presented the Agencys assessment of the safety performance at Millstone Power Station for the period of January 1 through December 31, 2022, as described in the annual assessment letter dated March 1, 2023. A copy of the letter can be accessed through the NRCs Agencywide Documents Access and Management System (ADAMS), Accession Number ML23058A256. Following the presentation, an opportunity was provided to the members of the public and the Connecticut NEAC for questions. The following NRC staff provided presentations and answers to questions during the meeting: Matt Young (Branch Chief, Division of Operating Reactor Safety), Eben Allen (Resident Inspector, Millstone), Earl Bousquet (Resident Inspector, Millstone), Joe DeBoer (Senior Project Engineer, Division of Operating Reactor Safety), and Sarah Elkhiamy (Senior Project Engineer, Division of Operating Reactor Safety).

Copies of the slides used by the NRC staff during the meeting can be accessed through ADAMS, Accession Number ML23073A004. A notice of the NRC and NEAC meeting was issued on March 2, 2023, and was posted on the NRCs external (public) Web page (ADAMS Accession Number ML23061A008). ADAMS is accessible from the NRC Web page at:

http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's web site at:

https://www.nrc.gov/reactors/operating/oversight.html.

Digitally signed by Matthew R.

Matthew R. Young Date: 2023.03.21 13:26:02 Young -04'00' Matt R. Young, Chief Projects Branch 2 Division of Operating Reactor Safety