Millstone Units 2 & 3 Annual Assessment Meeting for 2022 Reactor Oversight Process Nuclear Regulatory Commission Region I March 16, 2023 ML23073A004

Agenda

Overall Assessment Millstone Units 2 and 3 operated safely in 2022 and continue to do so today 3

Inspection and Oversight

  • Three full-time residents assigned to Millstone Justin Fuller Eben Allen Earl Bousquet Senior Resident Resident Inspector Resident Inspector
  • Inspectors have unfettered access to all areas of the site
  • Technical specialists conduct additional inspections 4 03/18/2021

Millstone Units 2 & 3 2022 Assessment Summary

  • Operated safely and in a manner that preserved the public health and safety and protected the environment
  • Licensee Response Column
  • 9054 hours0.105 days <br />2.515 hours <br />0.015 weeks <br />0.00345 months <br /> of inspection and related activities
  • Green Performance Indicators
  • 1 Apparent Violation - Significance not finalized in Security Cornerstone 5

Reactor Oversight Process 6

Action Matrix Concept Multiple/Repetitive Licensee Regulatory Degraded Unacceptable Degraded Response Response Performance Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions 7

National Summary of Plant Performance Status as of 12/31/2022 Licensee Response 87 Regulatory Response 6 Degraded Cornerstone 0 Multiple/Repetitive Degraded Cornerstone 0 Unacceptable Performance 0 IMC 0350 Oversight 0 Total 93 8

National Summary

  • Performance Indicator Results for 2022*

- Green 6247

- White 0

- Yellow 0

- Red 0

  • PIs are counted per plant per quarter
  • Total Inspection Findings in 2022#

- Green 381

- Greater-than-Green 1

- White 6

- Yellow 0

- Red 0

  1. Finding data current as of 2/24/2023 9

Safety Conscious Work Environment (SCWE)

SCWE

  • The last PI&R was September 2022 Allegations
  • 3 allegations in 2022
  • Resident inspectors and regional staff are highly accessible and take all allegation matters seriously 10

NRC Actions in Response to COVID-19

  • Monitored plant activities through inspections and oversight
  • Maintained emergency response capabilities within Regional Incident Response Centers and our headquarters Operations Center 11

NRC Response to COVID-19

  • Additional Actions:

- Expanded use of telework where appropriate

- Dedicated Continuity of Operations Plan

- Coordinating actions with industry on best practices to minimize impacts

- Risk-informing eyes-on inspections through residents and regional inspections 12

Office of Public Affairs Diane Screnci Neil Sheehan Diane.Screnci@nrc.gov Neil.Sheehan@nrc.gov 610-337-5330 610-337-5331 13

NRC Social Media Channels Facebook www.facebook.com/nrcgov/

Twitter twitter.com/nrcgov YouTube www.youtube.com/user/NRCgov Flickr www.flickr.com/photos/nrcgov/

LinkedIn www.linkedin.com/company/u-s--nuclear-regulatory-commission/

RSS www.nrc.gov/public-involve/listserver.html#rss 14

Annual Assessment Meeting Feedback Submit feedback: Through any computer by going to the Public Meeting Schedule and pressing the Meeting Feedback link for this meeting, or pressing the [more]

link for this meeting and then pressing the Meeting Feedback link on the Meeting Details page.

Meeting number: 20230220 15

Questions and Answers 16