ML20132D903

From kanterella
Revision as of 05:12, 10 August 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of Ltr Dtd 960924,transmitting Changes to Physical Security Plan Identified as Rev 4 to IA State Univ Reactor Security Plan Submitted,Per 10CFR50.54(p)
ML20132D903
Person / Time
Site: University of Iowa
Issue date: 12/16/1996
From: Pederson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wendt S
IOWA STATE UNIV., AMES, IA
References
NUDOCS 9612200194
Download: ML20132D903 (2)


Text

- - = -- -- - - _ . - - - -- - -. . .. .

December 16, 1996 Mr. Scott E. Wendt Reactor Manager Iowa State University College of Engineering i Department of Mechanical Engineering 2025 H. M. Black Engineering Building Ames, IA 50011-2160

SUBJECT:

PHYSICAL SECURITY PLAN CHANGES

Dear Mr. Wendt:

This letter acknowledges receipt of your letter dated September 24, 1996, which transmitted changes to the Physical Security Plan identified as Revision 4 to the Iowa State University Reactor Security Plan submitted under the provisions of 10 CFR 50.54(p).

i Based on your determination that the changes do not decrease the overall effectiveness of your security plan and after limited review of the changes, no NRC approval is required, in accordance with 50.54(p). Implementation of these changes will be subject to inspection to confirm that the changes have i not decreased the overall effectiveness of your security plan.

The enclosure to your letter contains Proprietary Information of a type specified in 10 CFR 2.790 (d) and is being protected against unauthorized i

. disclosure. In accordance with 10 CFR 2.790 of the Commission's regulations, l

! a copy of this letter will be placed in the NRC Public Document Room.  !

1 If you would like to discuss this letter or additional security plan changes, l please contact Mr. James R. Kniceley of my staff at (630) 829-9874. l Sincerely, 1

Original Signed by

, Cynthia D. Pederson, Director Division of Nuclear Materials Safety Docket No. 50-116 l

cc: Dr. D. Bullen, Program Director i Dr. W. Vernetson, Director of Nuclear Facilities l Dr. T. Okiishi, Department Executive Officer J. Eure, Iowa Department of Health 7 bec: OC/LFDCB PUBLIC-(IE03.) b 1 b

9612200194 PDR 961216 ADOCK 05000116 PDR \

DOCUMENT NAME: A:\50.54P.ISU (SEE PREVIOUS CONCURRENCE PAGE) l

.e thi. c-t u-g gi . iwic.t. i. th. 6.a c - con with t .it.ch/ ci t - cm with att.ch/ ei 0FFICE RIII RIII RIIIAf)

NAME Kniceley:ib Shear Peder1Ibn DATE 12/ /96 12/ /96 12///t'/96 190Ubd 0FFICIAL RECORD COPY 4

1

.g

, December 16, 1996 4 Mr. Scott E. Wendt Reactor Manager Iowa State University College of Engineering Department of Mechanical Engineering 2025 H. M. Black Engineering Building Ames, IA 50011-2160

SUBJECT:

PHYSICAL SECURITY PLAN CHANGES

Dear Mr. Wendt:

This letter acknowledges receipt of your letter dated September 24,.1996, which transmitted changes to the Physical Security Plan identified as Revision 4 to the Iowa State University Reactor Security Plan submitted under the provisions of 10 CFR 50.54(p).

Based on your determination that the changes do not decrease the overall i effectiveness of your security plan and after limited review of the changes, l no NRC approval is required, in accordance with 50.54(p). Implementation of- l these changes will be subject to inspection to confirm that the changes have not decreased the overall effectiveness of your security plan.

The enclosure to your letter contains Proprietary Information of a type specified in 10.CFR 2.790 (d) and is being protected against unauthorized

' disclosure. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, less enclosure (s), will be placed in the NRC Public r Document Room.  !

~

If you would like to discuss this letter or additional security plan changes, please contact Mr. James R. Kniceley of my staff at (630) 829-9874.

Sincerely, Original Signed by Cynthia D. Pederson, Director Division of Nuclear Materials Safety Docket No. 50-116 cc: Dr. D. Bullen, Program Director Dr. W. Vernetson, Director of Nuclear Facilities Dr. T. Okiishi, Department Executive Officer J. Eure, Iowa Department of Health bec: OC/LFDCB PUBLIC (IE02)

DOCUMENT NAME: A:\50.54P.ISU ..,. j.

g ,, . . ,,.<ini. s. sus ...sn.6.. c -c.,,.sn .. /.-i e -c.,,.......f i -

0FFICE RIII N L RIII N RIII l NAME Kniceley:ib Shear h1 Pederson DATE 12/ll /96 12/$/96 12/ /96 j OF:ICIAL RECORD COPY I l