Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P6801999-10-26026 October 1999 Informs That Effective 991026,SW Holmes Will Be NRC Inspector for Facility at Iowa State Univ,Due to Retirement of Previously Assigned Inspector ML20211J4131999-09-0101 September 1999 Forwards Insp Rept 50-116/99-201 on 990810-12.No Violations Noted ML20210N5601999-08-0505 August 1999 Informs That Rh Estwick,License SOP 70166,has Resigned Position as RO at IA State Univ Following Completion of Academic Program ML20202C8981999-01-26026 January 1999 Ack Receipt of SE Wendt ,Forwarding Rev to Iowa State Univ UTR-10 Reactor EP Under Provisions of 10CFR50.54. NRC Approval Not Needed Based on Determination That Changes Do Not Decrease EP Effectiveness ML20206S0501999-01-22022 January 1999 Forwards Revised Tech Specs,Reflecting Change in Facility Operating Status as Possession Only License,Per 990121 Telcon with NRC ML20198R2131999-01-0606 January 1999 Requests Issuance of Decommissioning Order for UTR-10 Reactor.Decommissioning Plan,Characterization Rept,Ltr of Intent & Environ Rept,Encl as Supporting Documentation ML20198R2301999-01-0404 January 1999 Forwards Environ Rept Prepared in Preparation for Proposed Decommissioning of UTR-10 Reactor,Per 10CFR51.21 ML20198L6571998-12-28028 December 1998 Forwards Complete Text of TSs for UTR-10 Reactor Facility Which Are Being Updated to Reflect Change in Facility Operating Status ML20198R2211998-12-21021 December 1998 Submits Revised Cost Estimate for Decommissioning UTR-10 Reactor ML20196B1581998-11-23023 November 1998 Informs of Completion of Review of Iowa State Research RO Requalification Program Submitted by Wendt in . Program Meets Requirements & Considered Acceptable. Implementation of Approved Program Should Begin Immediately ML20195F4761998-09-30030 September 1998 Forwards Copy of IA State Univ Revised Licensed Operator Requalification Program Which Is Being Provided for NRC Approval,Per 10CFR50.59.Revised Program Reflects That UTR-10 Reactor Has Permanently Ceased Reactor Operations ML20154A7991998-09-28028 September 1998 Informs That Licensee Has Chosen Decon Decommissioning Alternative & Will Proceed with Dismantling UTR-10 Reactor as Soon as Possible.Description Decommissioning Plan, Discussed ML20154K3621998-07-17017 July 1998 Requests Assistance in Determining New Route for Iowa State Univ to Use to Transport LEU Fuel to Savannah River Site ML20217A4371998-04-16016 April 1998 Informs of Intent to Cease Operating UTR-10 Nuclear Reactor No Later than 980515.Licensee Plans to Remove LEU Fuel from Reactor & Place Fuel Into Storage Pits by 980630 ML20217H2871998-03-30030 March 1998 Forwards Amend 12 to License R-59 & Safety Evaluation.Amend Revises TS to Clarify Grace Periods Associated W/Surveillance & Maint Intervals ML20217F4061998-03-18018 March 1998 Provides Advance Notification of Second of 2 Shipments of Spent Nuclear Fuel Consisting of Quantity of SNM of Moderate Strategic Significance.Info Required by 10CFR73.72 Provided on Encl Shipment Id Form ML20217N6811998-03-0303 March 1998 Provides Advance Notification of Shipment of Spent Nuclear Fuel.Info Required by 10CFR73.72 Provided on Encl Shipment Id Form ML20202F7211998-02-10010 February 1998 Forwards Rev to Request for Update of TS Which Was Submitted on 971222.Rev Is Result of Several Telcons W/T Michaels & Is Submitted for Approval ML20198Q6271998-01-0606 January 1998 Forwards Revised Licensed Operator Requalification Program for NRC Approval,Per 10CFR50.59.W/explanation for Changes ML20197G3491997-12-23023 December 1997 Notifies That TE Draur Has Resigned Position at Iowa State Univ Following Completion of Academic Program ML20197H9761997-12-22022 December 1997 Forwards Three Copies of Updated TS Section 1.0, Definitions, for Approval.Explanation of Changes Provided & Additions Are Underlined ML20211J4731997-10-0202 October 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp of R-059 ML20216H0421997-09-0808 September 1997 Forwards Response to NRC Re Violations Noted in Insp of License R-059 on 970721-25.Corrective Actions:Last Three Required Surveillance Activities Were Completed on 970108 ML20210M7961997-08-18018 August 1997 Forwards Insp Rept 50-116/97-201 on 970721-25 & Nov. Violations of Concern Because of Apparent Failure to Properly Assure,At Specified Frequencies,That Certain Safety Sys Were Operable as Required Prior to Reactor Operation ML20148C9891997-05-12012 May 1997 Notifies That Sf Wagner Resigned Position at Iowa State Univ Following Completion of Academic Program ML20135C0871997-02-24024 February 1997 Forwards Certificate for Listed Newly Licensed Individual. W/O Encl ML20135C1321997-02-24024 February 1997 Forwards Certificates for Newly Licensed Individuals at Iowa State University.W/O Encl ML20134B2921997-01-27027 January 1997 Forwards Results of Operator Initial Exam Conducted at Iowa State Univ on 970113.W/o Encl ML20133E5891997-01-0909 January 1997 Forwards Reactor Operator License Exam to Be Administered on 970113 & Copy of Guidelines for Guidance in Administering Exam.W/O Encl ML20132D9031996-12-16016 December 1996 Ack Receipt of Ltr Dtd 960924,transmitting Changes to Physical Security Plan Identified as Rev 4 to IA State Univ Reactor Security Plan Submitted,Per 10CFR50.54(p) ML20132H1621996-12-16016 December 1996 Informs of Resignation of Jo Oftelie,License SOP 70167 ML20132B0441996-12-13013 December 1996 Forwards Amend 11 to License R-59 & Safety Evaluation. Amend Revises TS to Include Change in Definition of Term Confident Secured & Change Administrative Control Section ML20135D2611996-12-0404 December 1996 Ack Receipt of Which Transmitted Changes to Emergency Plan for Iowa State Univ Research Reactor Facility Submitted Under Provisions of 10CFR50.54(q) ML20133H2611996-11-0707 November 1996 Informs That Proposed Shipment of Spent Nuclear Fuel by Iowa State Univ Commencing 961112 Has Been Postponed ML20134K1971996-11-0707 November 1996 Informs That Proposed Shipment of Spent Nuclear Fuel by Licensee Commencing 961112 Has Been Postponed ML20134J1801996-10-30030 October 1996 Informs of Impending Shipment of Spent Nuclear Fuel by Iowa State Univ.Info Required by 10CFR73.72 Encl ML20134J2061996-10-30030 October 1996 Informs of Impending Shipment of Spent Nuclear Fuel & Attaches Info Required by 10CFR73.72.W/o Encl ML20134L8321996-10-10010 October 1996 Forwards Drawings & Revisions to Tech Spec Definition Section ML20128F5911996-10-0202 October 1996 Forwards Initial Exam Rept 50-116/OL-96-02 Conducted on 960923 ML20129E3761996-09-24024 September 1996 Forwards Physical Security Plan,Update 4 for IA State Univ Reactor Facility.Encl Withheld,Per 10CFR50.54(p)(2) ML20117G7261996-08-27027 August 1996 Submits Update of 3 Necessary Changes to TS for IA State Univ Reactor Facility,Suggested by NRC During Last Insp,For NRC Approval ML20101C9711996-03-13013 March 1996 Informs That Effective 960216 Jt Adams Resigned & Interim Reactor Manager SE Wendt Was Appointed by Dean of Engineering ML20101E6431996-03-13013 March 1996 Notifies NRC That Licensed Operator SOP70017,JT Adams Resigned Position at IA State Univ ML20100N2611996-02-28028 February 1996 Forwards Info Requesting Extension to Original Route Approval IAW 10CFR73,for Shipment of Irradiated Fuel Elements.Approval Expires 960420 ML20095J4101995-12-20020 December 1995 Forwards Update 3 to Physical Security Plan.Plan Withheld ML20094P8711995-11-0606 November 1995 Forwards Revised Licensed Operator Requalification Program for NRC Approval,Per 10CFR50.59.Paragraphs Changed from 950531,version Underlined ML20085E5181995-06-12012 June 1995 Provides Notification of Change of Rso.Effective 950608, Kc Kerns Added to Staff & Will Be Serving as RSO for Iowa State Univ.Resume of Kerns Encl ML20084V1871995-05-31031 May 1995 Forwards Requalification Program for Licensed Operators of UTR-10 Facility for NRC Approval Per 10CFR50.59 ML20078H9221995-01-30030 January 1995 Notifies of Resignation of Listed RO from Position at Iowa State Univ Following Completion of Academic Program ML20059L4151994-01-25025 January 1994 Forwards Insp Rept 50-116/94-02 on 940110-11.No Violations Noted 1999-09-01
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217P6801999-10-26026 October 1999 Informs That Effective 991026,SW Holmes Will Be NRC Inspector for Facility at Iowa State Univ,Due to Retirement of Previously Assigned Inspector ML20211J4131999-09-0101 September 1999 Forwards Insp Rept 50-116/99-201 on 990810-12.No Violations Noted ML20202C8981999-01-26026 January 1999 Ack Receipt of SE Wendt ,Forwarding Rev to Iowa State Univ UTR-10 Reactor EP Under Provisions of 10CFR50.54. NRC Approval Not Needed Based on Determination That Changes Do Not Decrease EP Effectiveness ML20196B1581998-11-23023 November 1998 Informs of Completion of Review of Iowa State Research RO Requalification Program Submitted by Wendt in . Program Meets Requirements & Considered Acceptable. Implementation of Approved Program Should Begin Immediately ML20217H2871998-03-30030 March 1998 Forwards Amend 12 to License R-59 & Safety Evaluation.Amend Revises TS to Clarify Grace Periods Associated W/Surveillance & Maint Intervals ML20211J4731997-10-0202 October 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp of R-059 ML20210M7961997-08-18018 August 1997 Forwards Insp Rept 50-116/97-201 on 970721-25 & Nov. Violations of Concern Because of Apparent Failure to Properly Assure,At Specified Frequencies,That Certain Safety Sys Were Operable as Required Prior to Reactor Operation ML20135C1321997-02-24024 February 1997 Forwards Certificates for Newly Licensed Individuals at Iowa State University.W/O Encl ML20135C0871997-02-24024 February 1997 Forwards Certificate for Listed Newly Licensed Individual. W/O Encl ML20134B2921997-01-27027 January 1997 Forwards Results of Operator Initial Exam Conducted at Iowa State Univ on 970113.W/o Encl ML20133E5891997-01-0909 January 1997 Forwards Reactor Operator License Exam to Be Administered on 970113 & Copy of Guidelines for Guidance in Administering Exam.W/O Encl ML20132D9031996-12-16016 December 1996 Ack Receipt of Ltr Dtd 960924,transmitting Changes to Physical Security Plan Identified as Rev 4 to IA State Univ Reactor Security Plan Submitted,Per 10CFR50.54(p) ML20132B0441996-12-13013 December 1996 Forwards Amend 11 to License R-59 & Safety Evaluation. Amend Revises TS to Include Change in Definition of Term Confident Secured & Change Administrative Control Section ML20135D2611996-12-0404 December 1996 Ack Receipt of Which Transmitted Changes to Emergency Plan for Iowa State Univ Research Reactor Facility Submitted Under Provisions of 10CFR50.54(q) ML20128F5911996-10-0202 October 1996 Forwards Initial Exam Rept 50-116/OL-96-02 Conducted on 960923 ML20059L4031994-01-25025 January 1994 Forwards Insp Rept 50-116/94-01 on 940110-11.No Violations Noted ML20059L4151994-01-25025 January 1994 Forwards Insp Rept 50-116/94-02 on 940110-11.No Violations Noted ML20058F7811993-11-29029 November 1993 Forwards Amend 10 to License R-59 & Safety Evaluation. Amend Revises TS to Include Definition of Term Confinement Secured ML20056E9681993-08-0909 August 1993 Forwards Reactor/Senior Reactor Operator License Certificates for Jo Oftelie,Ml Trimpe & Wendt,Per Commission Request ML20056D2941993-07-22022 July 1993 Forwards Results for Operator Initial Exam Conducted at Iowa State Univ on 930623 ML20127L1041993-01-20020 January 1993 Confirms NRC Concurrence for Startup of Reactor as Discussed During 930114 Telcon ML20126B4221992-12-0808 December 1992 Forwards Reactive Safety Insp 50-116/92-03 on 921117-19.No Violations Noted.Nrc Concerned W/Recent Stuck Shim Safety Rod Event ML20059N6361990-10-0101 October 1990 Forwards Insp Rept 50-116/90-01 on 900911-13.No Violations or Deviations Noted ML20059J8961990-09-12012 September 1990 Forwards Order Modifying License R-59,Amend 8,converting Training Reactor from High to Low Enriched U & Allowing Possession,But Not Separation of SNM Produced by Operation of Reactor ML20059G1031990-09-0505 September 1990 Forwards Exam Rept 50-116/OL-90-01 on 900719 & 20 ML20248D5291989-09-27027 September 1989 Forwards Exam Rept 50-116/OL-89-01 Administered on 890823 & 24 ML20245L6841989-08-15015 August 1989 Advises That 890807 Update 1 to Physical Security Plan Meets Provisions of 10CFR50.54(p) & Acceptable ML20247G2551989-05-17017 May 1989 Forwards Safeguards Insp Rept 50-116/89-01 on 890508-09.No Violations Noted ML20247D4761989-05-17017 May 1989 Forwards Matl Control & Accountability Safeguards Insp Rept 50-116/89-02 on 890508 & 09.No Violations Noted ML20246F9001989-05-0303 May 1989 Requests That Ref Matls Listed in Encl Be Provided for Operator & Senior Operator Licensing Exam Scheduled for Wk of 890821 ML20247M8271989-03-30030 March 1989 Discusses Licensee Requests for Changes to Requalification Program.Requests Include Extension of Max Time Period of 24 Months for Requalification Cycle to Account for Changes in Outage Schedules & Reorganization of Training Programs ML20207M2881988-10-12012 October 1988 Advises That 880826 Request to Extend Submission of High to Low Enrichment Conversion Application to 881130,acceptable ML20195D5871988-06-10010 June 1988 Extends Deadline for Submittal of Application for Conversion from High to Low Enriched U Until 880831,in Response to 880518 Request ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup ML20148C1631988-03-17017 March 1988 Forwards Safety Insp Rept 50-116/88-01 on 880209-10.No Violations Noted ML20234E8221987-06-26026 June 1987 Forwards Exam Rept 50-116/OLS-87-01 of Exam Administered on 870602-04.Exam & Answer Key Also Encl ML20215D6871987-06-11011 June 1987 Informs of Recent Reorganization of Nrr.Ofc Now Standardization & Non-Power Reactor Project Directorate, Under Div of Reactor Projects Iii,Iv,V & Special Projects, NRR ML20214U9841987-06-0303 June 1987 Forwards Revised NRC Form 398,personal Qualifications statement-licensee & NRC Form 396,certification of Medical Exam by Facility Licensee.Forms Revised to Reflect Changes to 10CFR55 Effective on 870526.W/o Encls ML20206U3121987-04-20020 April 1987 Ack Receipt of Proposed Schedule for Conversion of Reactor from High Enriched to Low Enriched U,Submitted Per 10CFR50.64(c)(2)(i).Requests That TS Michaels Be Informed of Any Changes or Updates to Proposed Schedule ML20205C1461987-03-13013 March 1987 Advises of 870416 Public Meeting W/Nrr & Region III Representatives in Rosemont,Il to Discuss Rev to 10CFR55, Operators Licenses & Implementation of Rev.Meeting Agenda Encl ML20212A3011987-02-26026 February 1987 Informs That Written & Oral Operator & Senior Operator Licensing Exams Scheduled for Wk of 870601.Ref Matls Listed on Encl 1 Should Be Submitted by 870401.Requirements for Conducting Exams Also Encl ML20207B2761986-11-0505 November 1986 Forwards Safety Insp Rept 50-116/86-01 on 861021-24. No Violation Noted ML20214M4591986-09-0808 September 1986 Forwards Exam Rept 50-116/OL-86-01 of Exams Administered on 860819-21 ML20199F1631986-06-19019 June 1986 Requests Ref Matl Listed in Encl for Operator/Senior Operator Licensing Exams Scheduled for Wk of 860818 by 860707.Requirements for Conducting Exams & Rules & Guidance for Exam Also Encl ML20154R4031986-03-26026 March 1986 Advises of NRR Reorganization.Telephone Number of J Dosa Changed.D Tondi New Section Leader for Nonpower Reactors & Safeguards Licensing Section.Correspondence Should Be Addressed to Nrc,Attention Document Control Desk ML20137S4981986-02-11011 February 1986 Forwards Revised NRC Form 398 Requiring All Info to Be Completed in Total W/Each new,renewal,upgrade,multi-unit & Reapplication Operator License Submittal.W/O Encls ML20141N2791986-01-10010 January 1986 Partial Response to FOIA Request for Licensee Responses to NRC Show Cause Orders Re Removal of Highly Enriched U to Secure Facilities.Documents Listed in App a Available in PDR ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20149K1911980-05-0707 May 1980 Generic Ltr 80-38 to All Nonpower Reactor Licensees Re NPR Physical Protection Requirements.Summary of Certain NPR Physical Protection Requirements Encl & Should Aid in Determining Safeguards Requirements Applicable to Facility ML20137G4721971-06-23023 June 1971 Advises That Presence & Irradiation of Explosives in Reactor Must Be Evaluated Due to Potential for Damage to Reactor. Evaluation Requested Establishing Operating Restrictions,Max Quantity of Explosives Allowed in Facility & Form 1999-09-01
[Table view] |
See also: IR 05000116/1997201
Text
, _ _ . .
.
e
.
p* \ UNITE] STATES
g ij NUCLEAR REGULATORY COMMISSION
e WASHINGTON. D.C. 30MH001
%,**ee*f A ugust 18, 1997
Dr. Daniel B. Bullen, Facility Director
j
Mechanical Engineering Department '
lows State University
2025 H.M. Black Engineering Building
l Ames, Iowa 50011 2100
l
SUBJECT: ROUTINE SAFETY INSPECTION REPORT NO. 50116/97201(DRPM) AND
NOTICE OF VIOLATION
Dear Dr. Bullen:
This refers to the inspection conducted on July 21 25, 1997 at the UTR 10 Argonaut
Reactor. The purpose of the inspection was to determine whether activities authorized by
the license were conducted safely and in accordance with NRC requirements. At the
conclusion of the inspection, the findings were discussed with those members of your staff
identified in the onclosed report.
Areas examined during the inspection are identified in the report. Within these areas, the
inspection consisted of selective examinations of procedurcs and representative records ,
4
interviews with personnel, and observations of activities in progress.
Based on the results of this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice of Violation. The violation is of
concern because of the apparent failure to properly assure, at specified frequencies, that
certain safety systems were operable as required prior to reactor operation.
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response, in your responso, you should document the
specific actions taken and any additional actions you plan to prevent recurrence. After
reviewing your response to this Notice, including your proposed corrective actions and the
results of future inspections, the NRC will determine whether further NRC onforcement
action is necessary to ensure compliance with NRC regulatory requirements.
\
D \\
9708220218 970818
PDR ADOCK 05000116
G PDR
'ab
ll l p Ill. I,II. II -_.
pa -
-
.
.
'
'
,
'
, A ugust 18, 1997
Dr. Daniel B. Bullen -
2-
- In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, the
enclosures, and your response to this letter will be placed in the NRC Public Dacument
Room.
Two non cited violations were also identified during this inspection.
Sincerely,
lOrJoinal signed byl
Mary,n Mendonca, Acting Director
Non Power Reactor and Decommissioning
Project Directorate,
Division Reactor Programs Management
Office of Nuclear Reactor Regulation
Docket No. 50116
License No. R 059
Enclosure: 1. Notice of Violation
2. Inspection Report
No. 50116/97201(DRPM)
DISTRIBUTION:
Deehot N o M 1947 SWeiss OGC (015 B 18) TBurdick, Rlli
PUBLIC POND t/f EHylton
Region 111 MMendonca BJones (c/Itr. only)
MSlosson CBassett,,~ Ril - TDragoun,- RI
N
PDND:LA Y d
PDND:PM TJM
-idtM3i9tmes [ ([ s/' EHylton j
"
PDND:D
?"!slas di % % I M'~
g //$/97 / '/97 ffy97
OFFICIAL RECORD COPY ~
DOCUMENT NAME: G:\SECY)MENDONCA\l 50116
4