ML20133E589

From kanterella
Jump to navigation Jump to search
Forwards Reactor Operator License Exam to Be Administered on 970113 & Copy of Guidelines for Guidance in Administering Exam.W/O Encl
ML20133E589
Person / Time
Site: University of Iowa
Issue date: 01/09/1997
From: Eresian W
NRC (Affiliation Not Assigned)
To: Bullen D
IOWA STATE UNIV., AMES, IA
References
NUDOCS 9701130075
Download: ML20133E589 (3)


Text

_.

3

~

Dr. Daniel B. Bullen i

Mechanical Engineering Department

  • #Y 9' 199[-

Nuclear Engineering Program Iowa State University 261 Sweeney Hall i

Ames, Iowa 50010 4

4

Dear Dr. Bullen:

j-In accordance with my telephone ~ conversation with Scott Wendt; enclosed is the reactor operator license examination, to be administered by you to Mr. Chad Hutchinson on January 13, 1997. At the conclusion'of the examination, please return the entire examination and t.nswer sheets in the enclosed envelope.

Please ensure that the examination is proctored (the time limit is one hour) and that the candidate signs the statement at the bottom of the cover sheet at the conclusion of the examination.

I have enclosed a copy of our Guidelines for. Administering Written Examinations for your guidance.

Note that this is a closed-reference examination, and there should be no notes, charts or other training materials open in the examination room.

Calculators and scratch 1

paper are allowed.

If any questions regarding the examination test items arise, please respond by telling the candidate to answer the test item as best he can. Make note of the question so that we may discuss it after the examination.

If there are any major problems, I can be reached at (301) 415-1833.

This is the second time that a retake examination has been administered at your facility in this manner. We hope that we may continue this process in order to realize cost savings and efficiencies.

Thank you for your cooperation and support.

Sincerely, Original signed by:

Warren J. Eresian, Reactor Engineer Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket.No. 50-116

Enclosures:

As stated cc w/o enclosures:

See next page DISTRIBUTION: w/o enclosures Docket File (50-116)

OGC (015-8-18)

Region III PUBLIC SWeiss PDND r/f EHylton' y

TMartin WEresian

'\\%

i

~

I p$on PDND:RE P

A PDND:D.

WEresi 6 SWeiss /

Q 1/9/97 1/

/97

<1/$/97 1

0FFICIAL RECORD COPY DOCUMENT NAME:

G:\\SECY\\ERESIAN\\BULLEN.ISU 9 01 30075 970109 PDR ADOCK 05NO116 V

PDR

1 t

  • @ MGu p

UNITED STATES g

j NUCLEAR REGULATORY COMMISSION

%.... /g WASHINGTON, D.C. 20656-0001 o

i

\\

January 9, 1997

+

l Dr. Daniel B. Bullen i

Mechanical Engineering Department Nuclear Engineering Program Iowa State University 261 Sweeney Hall i

Ames, Iowa 50010 1

Dear Dr. Bullen:

2 In accordance with my telephone conversation with Scott Wendt, enclosed is the reactor operator license examination, to be administered by you to Mr. Chad Hutchinson on January 13, 1997. At the conclusion of the examination, please return the entire examination and answer sheet in the enclosed envelope.

Please ensure that the examination is proctored (the time limit is one hour) and that the candidate signs the statement at the bottom of the cover sheet at the conclusion of the examination.

I have enclosed a copy of our Guidelines for Administering Written Examinations for your guidance.

Note that this is a closed-reference examination, and there should be no notes, charts or other training materials open in the examination room. Calculators and scratch paper are allowed.

If any questions regarding the examination test items arise, please respond by telling the candidate to answer the test item as best he can. Make note of the question so that we may discuss it after the examination.

If there are any major problems, I can be reached at (301) 415-1833.

This is tt.e second time that a retake examination has been administered at i

your facility in this manner. We hope'that we may continue this process in order to realize cost savings and efficiencies. Thank you for your cooperation and support.

Sincerely,

%LM MiQ Warren J. Eres an, Reactor Engineer Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-116

Enclosures:

As stated cc w/o enclosures:

See next page

.._=_.

o i

9 Iowa State University Docket No. 50-116 1

i l

i cc:

Mayor Larry Curtis City Hall 515 ?, lark Avenue 1

Ames, Iowa 50010 i

l Director, Office for Planning and Programming 523 East 12th Street Des Moines, Iowa 50319 i

-