ML20202C898

From kanterella
Jump to navigation Jump to search

Ack Receipt of SE Wendt ,Forwarding Rev to Iowa State Univ UTR-10 Reactor EP Under Provisions of 10CFR50.54. NRC Approval Not Needed Based on Determination That Changes Do Not Decrease EP Effectiveness
ML20202C898
Person / Time
Site: University of Iowa
Issue date: 01/26/1999
From: Michaels T
NRC (Affiliation Not Assigned)
To: Bullen D
IOWA STATE UNIV., AMES, IA
References
TAC-MA4385, NUDOCS 9902010207
Download: ML20202C898 (3)


Text

_ _ _ . . _ _ _ . . . . . .. . . - . -

y- .

January 26, 1999  ;

Dr. D:ni:1 B. Bull:n i

! Mechanical Engineering Department r lowa State University 2025 H.M. Black Engineering Building l

- Ames, Iowa 5011-2241

SUBJECT:

REVISION TO THE lOWA STATE UNIVERSITY UTR-10 REACTOR -

EMERGENCY PLAN (TAC NO. MA4385)

Dear Dr. Bullen:

This letter acknowledges receipt of Scott E. Wendt's letter dated November 25,1998,  ;

which enclosed a revision to the Iowa State University UTR-10 Reactor Emergency Plan  !

submitted under the provisions of 10 CFR 50.54(q). .

i Based on your determination that the changes do not decrease the effectiveness of your emergency plan, and that it continues to meet the requirements of Appendix E to Part 50,  !

NRC approval is not required, t i

Our initial review of these changes indicates them to be in accordance with 10 CFR 50.54(q). Implementation of these changes will be subject to inspection to confirm that they did not decrease the effectiveness of your emergency plan. l l

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of the letter will be placed in the NRC Public Document Room.

if your have any questions, please call me at (301) 415-1102. '

Sincerely, ORIGINAL SIGNED BY:

- Theodore S. Michaels, Senior Project Manager Non-Power Reactors and Decommissioning -

Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-116 cc: See next page DISTRIBUTION:

E-MAIL ,

HARD COPY -

'AAdams WEresian Docket File 50-116 DMatthews

- CBassett SHolmes PUBLIC SWeiss

- TBurdick Pisaac EHylton _ PDND r/f PDoyle . MMendonca TMichaels OGC (015-B18) 3TDragoun SHolmes Region 111 -

\0 i.

PDND
PM

~

P LA g:D I

TMichaelsh , _

ton- SWeiss jg

.. ~1/36/9 9 1/ /99 1/')h99 v~[

! OFFICIAL RECORD COPY /

ll DOCUMENT NAME: G:\SNCY\MICHAELS\BULLEN-9902010207 99012& R w

oa ^==**=; 1g FE Derh'*P e o @O["

lS h

a p sM*% l

[4 4 UNITED STATES i g g. NUCLEAR REGULATORY COMMISSION o

  • WASHINGTON, D.C. 2066Mm01 g j/ January 26, 1999 Dr. Daniel B. Bullen Mechanical Engineering Depar* ment ,

Iowa State University i 2025 H.M. Black Engineering Building Ames, Iowa 5011-2241

SUBJECT:

REVISION TO THE lOWA STATE UNIVERSITY UTR-10 REACTOR EMERGENCY PLAN (TAC NO. MA4385)

Dear Dr. Bullen:

This letter acknowledges receipt of Scott E. Wendt's letter dated November 25,1998, whi'ch enclosed a revision to the towa State University UTR-10 Reactor Emergency Plan  :

submitted under the provisions of 10 CFR 50.54(q). I Based on your determination that the changes do not decrease the effectiveness of your emergency plan, and that it continues to meet the requirements of Appendix E to Part 50, NRC approvalis not required Our initial review of these changes indicates them to be in accordance with 10 CFR <

50.54(q). Implementation of these changes will be subject to inspection to confirm that they did not decrease the effectiveness of your emergency plan, in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of the letter will be placed in the NRC Public Document Room.

If your have any questions, please call me at (301) 415-1102.

Sincerely, 4 S. l

' Theodore S. Michaels, Senior Project Manager

  • Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-116 cc: See next page

, _ . _ . . _ _ _ . . . . . . - _ _ . _ . . _ . ._ _ _ _. __ _...___ _._ _ ._ .m __.- _

?.

y L

lowa State University Docket No. 50-116 cc: i Mayor Larry Curtis l City Hall i 515 Clark Avenue

p. Ames, IA 0010 Director, Office for Planning and Programming .

523 East 12th Street L ' Des Moines, IA 50319 Mr. Warren DeVries Department Executive Officer,-

l '- . Mech. Engr. Dept.

2025 H.M. Black Engineering Bldg.

Iowa State University Ames, IA 50011-2160 Mr. Scott E. Wendt, Reactor Manager Mechanical Engineer Department 209W Nuclear Engineering Lab.

Iowa State University l Ames, IA 50011-2241 l

t i i-I

! 1 i l l

l 1

t 2

c I-l l

. . . ~ . , _ _ . . - n -