Category:Graphics incl Charts and Tables
MONTHYEARML22033A5442022-02-0202 February 2022 Inservice Inspection Summary Report -1RE23 ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5). ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. ML13323B2042013-01-22022 January 2013 Attachment 9: CHLE-016, Rev. 2, Calculated Material Release to Estimate Chemical Effects. ML13323B2012013-01-22022 January 2013 Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report. ML13323B2022013-01-15015 January 2013 Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal. ML13323B2002013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End ML13323B1992013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 ML13323B1982012-08-19019 August 2012 Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition. ML13323B1912012-08-14014 August 2012 Attachment 2: CHLE-006, Rev. 1, STP Material Calculations. NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test.2012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test. ML13323B1942012-08-11011 August 2012 Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures. ML13323B1962012-06-12012 June 2012 Attachment 4: CHLE-008, Rev. 3, Debris Bed Preparation and Formation Test Results. ML1118904202011-07-0606 July 2011 Licensee Slide from 7/7/11 Meeting with STP Nuclear ML11157A0102011-06-0202 June 2011 STP Nuclear Operating Company, Licensee Handouts, 6/2/2011 Meeting Risk-Informed GSI-191 Closure Plan for GSI-191 Resolution ML1112504292011-04-26026 April 2011 Annual Environmental and Annual Radiological Environmental Operating Reports, Part 2 of 2 ML1019004182010-06-28028 June 2010 Quick View Chart ML1005413692010-01-0505 January 2010 TS Pages from Licensee ML0930200982009-10-29029 October 2009 Summary of Meeting with STP Nuclear Operating Company, Licensee for South Texas Project, Units 1 and 2, to Discuss Experience with Implementation of Risk-Managed Technical Specification Pilot Amendment (Initiative 4b) and Other Initiatives ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists NOC-AE-06001960, Inservice Inspection Summary Report2006-01-19019 January 2006 Inservice Inspection Summary Report ML0426502472004-09-13013 September 2004 One Page from 033004 Open Items Table Riv Fire Protection ML0426100732004-09-13013 September 2004 One Page from the Open Items Table CY-02-012, Project Response to AIF Generator Survey2002-02-28028 February 2002 Project Response to AIF Generator Survey 2022-02-02
[Table view] Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML24249A3372024-09-0404 September 2024 Inservice Inspection Summary Report - 2RE23 ML23229A5262023-08-17017 August 2023 Inservice Inspection Summary Report - 1 RE24, ML23221A3002023-08-0909 August 2023 RE22 Inspection Summary Report for Steam Generator Tubinq, Rev. 1 (Epld L-2023-LRO-0029) ML23044A6192023-02-13013 February 2023 Summary Report for Inservice Inspection (2RE22) Completed in November 2022 ML22033A5442022-02-0202 February 2022 Inservice Inspection Summary Report -1RE23 NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 ML21196A4922021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval ML21144A1092021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval ML20303A2602020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing ML20281A8542020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing ML20191A2702020-07-0909 July 2020 Inservice Inspection Summary Report -1RE22 NOC-AE-20003700, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01)2020-01-22022 January 2020 Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01) NOC-AE-20003703, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-04)2020-01-22022 January 2020 Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-04) NOC-AE-19003696, Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096)2019-11-26026 November 2019 Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096) NOC-AE-19003620, Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23)2019-02-28028 February 2019 Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23) NOC-AE-19003624, Inservice Inspection Summary Report- 1RE212019-02-0707 February 2019 Inservice Inspection Summary Report- 1RE21 NOC-AE-18003603, Transmittal of 2RE19 Inspection Summary Report for Steam Generator Tubing2018-10-18018 October 2018 Transmittal of 2RE19 Inspection Summary Report for Steam Generator Tubing NOC-AE-18003587, Inservice Inspection Summary Report -2RE192018-07-25025 July 2018 Inservice Inspection Summary Report -2RE19 NOC-AE-17003503, Inservice Inspection Summary Report - 1 RE202017-07-20020 July 2017 Inservice Inspection Summary Report - 1 RE20 NOC-AE-17003440, Inservice Inspection Summary Report -2RE18 Completed in November 20162017-02-0808 February 2017 Inservice Inspection Summary Report -2RE18 Completed in November 2016 NOC-AE-16003364, 1RE19 Inspection Summary Report for Steam Generator Tubing2016-04-25025 April 2016 1RE19 Inspection Summary Report for Steam Generator Tubing NOC-AE-16003355, Inservice Inspection Summary Report, 1RE192016-03-24024 March 2016 Inservice Inspection Summary Report, 1RE19 NOC-AE-15003282, Inservice Inspection Summary Report -2E172015-08-0606 August 2015 Inservice Inspection Summary Report -2E17 NOC-AE-14003170, Inservice Inspection Summary Report - 1 RE182014-08-26026 August 2014 Inservice Inspection Summary Report - 1 RE18 NOC-AE-14003139, RE16 Inspection Summary Report for Steam Generator Tubing2014-05-22022 May 2014 RE16 Inspection Summary Report for Steam Generator Tubing NOC-AE-14003112, Inservice Inspection Summary Report - 2RE162014-03-24024 March 2014 Inservice Inspection Summary Report - 2RE16 NOC-AE-13002968, Inservice Inspection Summary Report - 1RE172013-02-21021 February 2013 Inservice Inspection Summary Report - 1RE17 NOC-AE-12002803, Inservice Inspection Summary Report - 2RE152012-02-20020 February 2012 Inservice Inspection Summary Report - 2RE15 NOC-AE-11002722, RE16 Inspection Summary Report for Steam Generator Tubing2011-09-21021 September 2011 RE16 Inspection Summary Report for Steam Generator Tubing NOC-AE-11002706, Inservice Inspection Summary Report - 1RE162011-07-28028 July 2011 Inservice Inspection Summary Report - 1RE16 NOC-AE-11002651, Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval2011-03-14014 March 2011 Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval NOC-AE-10002585, Inservice Inspection Summary Report - 2RE142010-08-0202 August 2010 Inservice Inspection Summary Report - 2RE14 NOC-AE-10002577, Notification of Upgrading of the Inservice Inspection Program for the Third Inspection Interval2010-07-29029 July 2010 Notification of Upgrading of the Inservice Inspection Program for the Third Inspection Interval NOC-AE-10002565, Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval2010-07-13013 July 2010 Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval NOC-AE-11002684, Categorization of Risk-Informed Piping2010-06-20020 June 2010 Categorization of Risk-Informed Piping ML1006401202010-02-22022 February 2010 Inservice Testing Program Description for the Third 10-Year Interval NOC-AE-10002522, Inservice Inspection Summary Report - 1RE152010-02-16016 February 2010 Inservice Inspection Summary Report - 1RE15 NOC-AE-09002408, Transmittal of 2RE13 Inspection Summary Report for Steam Generator Tubing2009-03-24024 March 2009 Transmittal of 2RE13 Inspection Summary Report for Steam Generator Tubing NOC-AE-09002381, Inservice Inspection Summary Report - 2RE132009-01-20020 January 2009 Inservice Inspection Summary Report - 2RE13 NOC-AE-08002318, Inservice Inspection Summary Report - 1RE142008-06-23023 June 2008 Inservice Inspection Summary Report - 1RE14 NOC-AE-07002195, Inservice Inspection Summary Report - 2RE122007-07-25025 July 2007 Inservice Inspection Summary Report - 2RE12 NOC-AE-07002143, 1RE13 Inservice Inspection Summary Report for Steam Generator Tubing2007-04-16016 April 2007 1RE13 Inservice Inspection Summary Report for Steam Generator Tubing ML0701602012007-01-0808 January 2007 Inservice Inspection Summary Report - IRE13 NOC-AE-06001960, Inservice Inspection Summary Report2006-01-19019 January 2006 Inservice Inspection Summary Report NOC-AE-05001938, Refueling Outage Inservice Inspection Results for Steam Generator Tubing2005-10-12012 October 2005 Refueling Outage Inservice Inspection Results for Steam Generator Tubing NOC-AE-05001910, Inservice Inspection Summary Report - 1RE122005-07-15015 July 2005 Inservice Inspection Summary Report - 1RE12 NOC-AE-05001853, Revised Steam Generator Tube Inservice Inspection Plan for the Second Inspection Interval at Plant2005-03-0303 March 2005 Revised Steam Generator Tube Inservice Inspection Plan for the Second Inspection Interval at Plant 2024-09-04
[Table view] Category:Letter
MONTHYEARML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function NOC-AE-240040, Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan IR 05000498/20243012024-10-0707 October 2024 NRC Examination Report 05000498/2024301 and 05000499/2024301 ML24255A0322024-09-30030 September 2024 the Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal ML24249A3372024-09-0404 September 2024 Inservice Inspection Summary Report - 2RE23 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24184C0832024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24183A1742024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump ML24179A3412024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24171A0112024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function IR 05000498/20244042024-06-0303 June 2024 Cyber Security Inspection Report 05000498/2024404 (Cover Letter) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report ML24116A3172024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 ML24092A1902024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 ML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation ML24050A0082024-02-19019 February 2024 Evidence of Financial Protection ML24045A0922024-02-16016 February 2024 Response to STP FOF Move Letter (2024) 2024-09-04
[Table view] |
Text
Nuclear Operating Company South Te.\as Pro/ecl Electric Cencratlnf Station P.O. Box 289 Wadstt'orlh. Te.\as 77-fSJ February 2, 2022 NOC-AE-22003866 10CFR50.55a STI:35275753 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 South Texas Project Unit 1 Docket No. STN 50-498 Inservice Inspection Summary Report-1RE23 Attached is the South Texas Project Electric Generating Station Unit 1 summary report for inservice inspections performed prior to and during scheduled refueling outage 1RE23 completed in November 2021. This summary report satisfies the reporting requirements of American Society of Mechanical Engineers ASME Code Section Xl, Article IWA-6230.
There are no commitments in this letter.
^
If there are any questions regarding this report, please contact Zachary Dibbern at 361-972-4336 or me at 361-972-7806.
C. H. Georgesifn General Manager, Engineering
Enclosure:
Summary Report for the 1RE23 Inservice Inspection of Unit 1 South Texas Project Electric Generating Station ec:
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 E. Lamar Boulevard Arlington, TX 76011-4511 Chief Inspector Texas Department of Licensing and Regulation Boiler Program P.O. Box 12157 Austin, TX 78711
SUMMARY
REPORT for the 1RE23 INSERVICE INSPECTION of UNIT 1 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION STP NUCLEAR OPERATING COMPANY Fall 2021
COVER SHEET 1RE23 INSERVICE INSPECTION
SUMMARY
REPORT SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 1 P.O. BOX 289 WADSWORTH, TEXAS 77483 USNRC DOCKET NO: 50-498 OPERATING LICENSE NO: NPF-76 COMMERCIAL OPERATION DATE: AUGUST 25, 1988 r^l Prepared by: \AWA^-}^\^ ' _ Date l-Z~7~2o'Z2-James Williams, ISI Program Owner Reviewed by :Q^^^V DateJ^^^_U Coleton Teplicek, SupEsrvYsor, /Testing Programs (NOCNOC 22035889)
SCOPE COMPONENT SUPPORTS, WELDS, THERMAL FATIGUE, REPAIR/REPLACEMENT, AND SYSTEM PRESSSURE TESTING INSPECTION PROGRAMS (IWB, IWC, IWD, IWE, IWF)
The examinations summarized in this report were performed in accordance with the 2013 Edition of the ASME Code, Section Xl that is applicable to the South Texas Project, Unit 1, fourth ten-year interval (09/25/2020-09/08/2029), first period (09/25/2020-09/24/2023).
This report covers selected ASME Code Class 1, 2, and 3 Systems/Components. This report is documented in accordance with the requirements of ASME Section Xl Code Case N-532-5.
Examinations and tests required by the Code are scheduled in accordance with "Inspection Program B" as defined in IWB-2412 for ASME Code Class 1 Systems/Components, IWC-2412 forASME Code Class 2 Systems/Components, IWD-2412 forASME Code Class 3 Systems/Components, and IWF-2410 component supports.
ASME Code Class 1 components were examined as prescribed by Table IWB-2500-1 and the applicable Examination Categories, which established the examination frequency at each refueling outage. The ASME Code Class 2 Systems/Components were examined in accordance with Table IWC-2500-1, Examination Categories. The ASME Code Class 3 Systems/Components were examined in accordance with Table IWD-2500-1, Examination Categories. Component Supports were examined in accordance with IWF-Table 2500-1, Examination Categories.
FORM OAR-1 OWNER'S ACTIVITY REPORT (Code Case N-532-5)
Report Nunmber OAR-1 RE23_
Plant_ South Texas Project Electric Generating Station Unit No._1_Commercial service date_August 25, 1988 _Refueling outage no. 1RE23 (If applicable)
Current inspection interval IWB. IWC, IWD. IWF - 4tl)_; IWE -4th (li',2"d,3rd,4"l,other)
Current inspection period IWB. IWC, IWD. IWF -Is1; (la, 2nd, 3rd)
Edition of Section XI applicable to the inspection plan_2013 Edition Date and revision of inspection plan September 25.2020 / Revision 10 Edition and Addenda of Section XI applicable to repairs/replacement activities, if different than the inspection plan N/A Code Cases used: N-532-5. N-593-2. N-716-1, N-729-6, N-770-5, N-722- 1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 1RE23 conform to the requirements of Section XI.
(Refuel^g outage number)
Signed \?W^ ^ V_AJ-^'~>- _IS1 Program Engineer Date: January 13, 2022
>wner or Owner's Designee, Title)
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and pressure Vessel Inspectors and the State or Province of f\ond&____ and employed by^One CIS Insurance Co._ _ of_Lynn, Massachusetts_ have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed at] activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repairs/
replacements activities and evaluation described this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from the connected with this inspection.
^-^*£L Commissions ^G> f- *^ *Z ^ ^ /
Inspector's'Signature
's' (National Board Number and Endorsements)
Date c>1 / l-j/-Z-e>^-Z-
TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE 1RE23 FALL 2021 ASME Item Item Evaluation Description Category Number Description E-A E1-32 LEAK CHASE CHANNEL CR 21-10813 ISI inspection summary No. 1-CISI-SYSTEM 930000 of the Containment Leak Chase Channel System identified standing water present inside test area junction boxes 2, 4, 6, 36 and 88. Leak chase test locations located at RCB (-)11' in the Odeg-90deg quadrant.
w
.IP.f'U TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES Nuclear Operating Company Nuclear Operating Company REQUIRED FOR CONTINUED SERVICE DATE CLASS CORRECTION MEASURE ITEM DESCRIPTION SYSTEWI DESCRIPTION OF WORK REPAIR / REPLACEMENT PLAN COMPLETED 3 REPLACEMENT VALVE ESSENTIAL COOLING WATER REPLACED VALVE. 10/21/2021 1-14-026 3 REPLACEMENT VALVE FC REPLACED BONET STUDS. 11/1/2021 1-16-039 3 REPLACEMENT PIPE ESSENTIAL COOLING WATER REPLACED PIPE SPOOL. 12/8/2021 1-17-027 ECW SCREEN WASH PUMP 1A 3 REPLACEMENT ESSENTIAL COOLING WATER REPLACED PLUG. 10/21/2021 1-17-040 DISCHARGE VALVE 3 REPLACEMENT VALVE ESSENTIAL COOLING WATER REPLACED VALVE. 10/21/2021 1-18-008 3 REPLACEMENT VALVE ec REPLACED DISC. 11/9/2021 1-19-047 REPLACED THERMOWELL AND 3 REPLACEMENT THERMOWELL ESSENTIAL COOLING WATER 10/21/2021 1-20-015 SOL.
1 REPLACEMENT VALVE RESIDUAL HEAT REMOVAL REPLACED VALVE. 11/9/2021 1-20-016 3 REPLACEMENT VALVE COMPONENT COOLING REPLACED CAPSCREW. 11/1/2021 1-20-017
^'
Nuclear Operating Company
'I I TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE wir Nuclear Operating Company DATE CLASS CORRECTION MEASURE ITEM DESCRIPTION SYSTEM DESCRIPTION OF WORK REPAIR / REPLACEMENT PLAN COMPLETED 3 REPAIR PIPE & FLANGE ESSENTIAL COOLING WATER REMOVED PIPE FROM FLANGE. 11/1/2021 1-20-019 3 REPLACEMENT VALVE ESSENTIAL COOLING WATER REPLACED VALVE. 10/21/2021 1-20-020 REPLACED PLUG AND BONNET 2 REPLACEMENT VALVE MAIN STEAM 12/8/2021 1-20-024 STUDS.
3 REPLACEMENT PUMP ESSENTIAL COOLING WATER REPLACED PUMP. 11/1/2021 1-21-012 REPLACED MOTOR AIR COOLERS 2 REPLACEMENT MOTOR REACTOR COOLANT 11/10/2021 1-21-017 AND BEARING OIL COOLER.
1 REPLACEMENT VALVE REACTOR COOLANT REPLACED VALVE. 11/9/2021 1-21-018 1 REPAIR VALVE REACTOR COOLANT REMOVED VALVE. 11/1/2021 1-21-019 2 REPLACEMENT VALVE MAIN STEAM REPLACED PLUG. 11/9/2021 1-21-021 REMOVED SNUBBER and PIPE 3 REPAIR SNUBBER & PIPE STRUT FEEDWATER STRUT.
11/1/2021 1-21-024 3 REPAIR SPRING CAN FEEDWATER ADJUST SPRING CAN. 11/1/2021 1-21-026
TABLE 2 "n
Wi ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES uir Nuclear Operating Company Nuclear Operating Company REQUIRED FOR CONTINUED SERVICE DATE CLASS CORRECTION MEASURE ITEM DESCRIPTION SYSTEM DESCRIPTION OF WORK REPAIR / REPLACEMENT PLAN COMPLETED 3 REPLACEMENT VALVE COMPONENT COOLING REPLACED VALVE. 11/1/2021 1-21-028 2 REPLACEMENT HEAT EXCHANGER COMPONENT COOLING REPLACED FASTENERS. 10/21/2021 1-21-033 2 REPLACEMENT VALVE FEEDWATER REPLACED VALVE STEM. 11/9/2021 1-21-036 2 REPLACEMENT SNUBBER FEEDWATER REPLACED SNUBBER. 11/1/2021 1-21-037