Nuclear Operating Company South Texas Pro/ectElectric Generating Station P.. Box 289 Wadsworth, Texas 7748.?

March 24, 2014 NOC-AE-14003112 10 CFR 50.55(a)

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Unit 2 Docket No. STN 50-499 Inservice Insoection Summary Reoort - 2RE16 Attached are four copies of the South Texas Project Unit 2 summary report for inservice inspections performed prior to and during scheduled refueling outage 2RE16 completed in December 2013. This summary report satisfies the reporting requirements of ASME Code Section XI, Article IWA-6230.

There are no commitments in this letter.

If there are any questions regarding this report, please contact Wendy Brost at (361) 972-8516 or me at (361) 972-7030.

Michael Berg Manager, Design Engineering Testing & Programs Engineering web

Attachment:

Summary Report for 2RE16 Inservice Inspection of Unit 2 South Texas Project Electric Generating Station (4 copies) 4ocu STl" 338466,05

NOC-AE-14003112 Page 2 of 2 cc:

(paper copy) (electronic copy)

Regional Administrator, Region IV A. H. Gutterman, Esquire U. S. Nuclear Regulatory Commission Morgan, Lewis & Bockius LLP 1600 East Lamar Boulevard Arlington, TX 76011-4511 Balwant K. Singal U. S. Nuclear Regulatory Commission Balwant K. Singal John Ragan Senior Project Manager Chris O'Hara U.S. Nuclear Regulatory Commission Jim von Suskil One White Flint North (MS 8 B1) NRG South Texas LP 11555 Rockville Pike Rockville, MD 20852 Kevin Polio Senior Resident Inspector Richard Peha U. S. Nuclear Regulatory Commission L.D. Blaylock P.O. Box 289, Mail Code: MN116 City Public Service Wadsworth, TX 77483 Jim Collins Peter Nemeth City of Austin Crain Caton & James, P.C.

Electric Utility Department 721 Barton Springs Road C. Mele Austin, TX 78704 City of Austin Richard A. Ratliff Robert Free Texas Department of State Health Services

NOC-AE-14003112 Page 1 of 8

SUMMARY

REPORT For the INSERVICE INSPECTION of UNIT 2 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION OUTAGE: 2RE16 STP NUCLEAR OPERATING COMPANY December 2013

NOC-AE-14003112 Page 2 of 8 COVER SHEET OUTAGE: 2RE16 INSERVICE INSPECTION

SUMMARY

REPORT SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 2 P.O. BOX 289 WADSWORTH, TEXAS 77483 USNRC DOCKET NO: 50-499 OPERATING LICENSE NO: NPF-80 COMMERCIAL OPERATION DATE: JUNE 19, 1989 Prepared by:

O tauber, ISI Program Engineer 5(- '4A-Z Reviewed by:

It. Yo nger, Supervising Engineer

NOC-AE-14003112 Page 3 of 8 SCOPE COMPONENT SUPPORTS, REPAIR AND REPLACEMENT, STEAM GENERATOR TUBING, SYSTEM PRESSURE TESTS AND WELD INSPECTION PROGRAMS (ASME IWB, IWC, IWD, IWF)

The examinations summarized in this report were performed in accordance with the 2004 Edition with no Addenda of the ASME Code,Section XI that is applicable to the South Texas Project, Unit 2, third ten-year interval (10/19/2010-10/18/2020), first period (10/19/2010-12/31/2013). This report covers selected ASME Code Class 1, 2 & 3 Systems/Components. This report is documented in accordance with the requirements of ASME Section XI Code Case N-532-4.

Examinations and tests required by the Code are scheduled in accordance with "Inspection Program B" as defined in IWB-2412 for ASME Code Class 1 Systems/Components, IWC-2412 for ASME Code Class 2 Systems/Components and IWD-2412 for ASME Code Class 3 Systems/Components and IWF-2410 for Component Supports.

The ASME Code Class 1 components were examined as prescribed by Table IWB-2500-1, and the applicable Examination Categories, which established the examination frequency at each refueling outage. The ASME Code Class 2 Systems/Components were examined in accordance with Table IWC-2500-1, Examination Categories. The ASME Code Class 3 Systems/Components were examined in accordance with Table IWD-2500-1, Examination Categories. Component Supports were examined in accordance with Code Table IWF-2500- 1.

NOC-AE-14003112 Page 4 of 8 FORM OAR-1 OWNER'S ACTIVITY REPORT (Code Case N-532-4) Corrected Report Nunmber OAR-2RE 16 F11I'llf Q .11 fl, T ".. 0, ý ý ;11 f P1 " tA , t, '.- +; S Q1 . 1; -

Unit No. 2 Commercial service date JUNE 19, 1989 Refueling outage no. 2RE16 (If applicable)

Current inspection interval IWB, IWC. IWD. IWF - 3 rd (1g,2 A 3Id, 4"', other)

Current inspection period IWB, IWC, IWD. [WF - I" (Is, 2", 3tm)

Edition and Addenda of Section XI applicable to the inspection plans 2004 No Addenda Date and revision of Inspection plans Revision 7 Effective date: 10/8/2012, Supplement 1 Effective date: 7/18/2013 Edition and Addenda of Section XI applicable, to repairs/replacement activities, if different than the inspection plans N/A Code Cases used: N-460. N-512-4 N-57R-1I N-72 -N-770-1I CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 2RE 16 conform to the requirements of Section XI.

(Refueling outage number)

Signed7 FA 0"- 5 (Owner orOwesDsin, Z f"&J Testing/Programs.Engineer Date 3-,zI- e" )

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by rte National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by ABS Boiler & Marine Insurance Co. of Houston, Texas have inspected the Items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/

replacement activities and evaluation described this report. Furthemiore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Signature R AA ,,/NafonalsnnspectoVs Board, State, Province, and Endorsements Date A4 A j/;I)

NOC-AE-14003112 Page 5 of 8 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE 2RE16 December 2013 Item Examination Items Item Number Description Evaluation description Category See Note #1 NOTES:

I. No items found with flaws or relevant conditions that required evaluation for continued service.

2. Surveillance procedure OPSP1 I-RC-0015 Rev. 17 (ASME Section XI Inservice Inspection) documents Inservice Inspection activities during 2RE 16.

TABLE 2 ABSTRACT OF REPAIRS/REPLACEMENT ACTIVTIES REQUIRED FOR CONTINUED SERVICE 2RE16 December 2013 Code Repair/Replacement Class Item Description Description of Work Date completed Plan Number 2 Valve Temp Mod restoration of SB Valve 4/30/2010 2-10-28 2 Valve Replaced SB Valve 12/09/2013 2-11-05 3 Valve Replaced EW Valve 01/17/2012 2-11-10 2 U-Strap Replaced U-Strap Support 03/01/2012 2-11-14 2 Pipe Replaced 2" CV Piping 02/17/2012 2-11-19 3 Valve Replaced EW Valve 08/13/2012 2-11-39 3 Pipe Installed EW Pipe Plugs 01/19/2012 2-11-42 3 PuMp Replaced EW Pump with Product Lubricated Pump 01/24/2012 2-11-48 3 Seismic Support Modification of Seismic Support 01/24/2012 2-11-49 3 Valve Replaced EW Valve 01/27/2012 2-11-51 3 Pipe Replaced CH Flange Bolting 01/20/2012 2-12-05 3 Pipe Replaced EW Flange Bolting 01/26/2012 2-12-06 3 Pipe Machined spacer plate - EW Flange 01/24/2012 2-12-07 3 Pipe Replaced EW Flange & Piping 01/26/2012 2-12-08 3 Valve Replaced CH Valve Disk 01/20/2012 2-12-09 3 Pipe Replaced EW Pipe Spool 05/17/2012 2-12-11 3 Valve Replaced EW Valve Disk 05/31/2012 2-12-12 3 Pump Replaced CC Pump Gland Plate 06/08/2012 2-12-13 3 Valve Replaced EW Valve 05/1.7/2012 2-12-15 1 Valve Repaired SI Valve Seal Cap 04/18/2012 2-12-22 3 Pipe Replaced EW Flange and Bolting 03/01/2012 2-12-23 3 Pipe Repaired EW Flange and Replaced Piping 11/25/2012 2-12-24 3 Strainer Replaced EW Strainer Bolting 05/18/2012 2-12-26 2 Valve Replaced EW Valve and Bolting 04/18/2012 2-12-28 z 2 Valve Replaced EW Valve and Bolting 10/02/2012 2-12-31 0 2 Valve Replaced EW Valve Plug 06/11/2013 2-12-32 3 Valve Replaced EW Valve 08/14/2012 2-12-33 C)

I Valve Replaced RC PSV Valve 12/14/2013 2-12-39 (D 1 Valve Replaced RC PSV Valve 12/14/2013 2-12-40 ,M 0') C-I Valve Replaced RC PSV Valve 12/14/2013 2-12-41 0 3 Pump Replaced RC Pump Motor Oil Coolers 12/12/22013 2-12-42 00

TABLE 2 ABSTRACT OF REPAIRS/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 2RE16 December 2013

  • = Corrected Code Repair/Replacement Class Item Description Description of Work Date completed Plan Number I Valve Replaced RC Valve Parts and Bolting 04/13/2013 2-12-45 3 Filter Replaced EW Filter Outlet Column End Cap 03/20/2013 2-12-46 2 Pipe Strap Removed and Reinstalled CV Pipe Strap 12/16/2013 2-12-48 2 Valve Replaced MS Valve Plug 12/15/2013 2-12-52 3 Cooling Coil Repaired EW Cooling Coil Leak 11/27/2012 2-12-54 1 Steam Generator Removed and Installed Steam Generator Diaphragms 12/04/2013 2-12-57 3 Pump Replaced RCP Motor Cooler Bolting 12/15/2013 2-12-62 3 Pump Replaced RCP Motor Cooler Bolting 12/14/2013 2-12-63 2 Valve Replaced FW Valve Hinge Pins 12/04/2013 2-13-04 1 Valve Seal Welded RC Valve Body to Bonnet 04/1/2013 2-13-09 3 Pipe Replaced EW Sockolet and Piping 02/21/2013 2-13-10 3 Pipe Replaced CH Flange Bolting 05/09/2013 2-13-14 1 Pump Replaced RC Pump Seal Housing Bolting 12/14/2013 2-13-15 1 Valve Replaced RC Valve 04/04/2013 2-13-17 3 Pipe Replaced EW Flange and Piping 03/01/2013 2-13-18 3 Valve Replaced EW Valve 05/06/2013 2-13-19 3 Pipe Replaced EW Flange and Piping 03/22/2013 2-13-20 1 Valve Repaired EW Valve Body 03/22/2013 2-13-21 1 Valve Repaired RC Valve 3/11/2013 2-13-22 3 Pipe Replaced EW Flange and Piping 03/21/2013 2-13-24 3 Pipe Replaced EW Flange and Piping 10/30/2013 2-13-25 1 Pipe Support Replaced RC Pipe Support 03/29/2013 2-13-26 2 Pipe Replaced EW Flange and Piping 05/07/2013 2-13-27 3

z Valve Repaired EW Valve 05/13/2013 2-13-28 0 3 Pipe Replaced EW Flange and Piping 05/09/2013 2-13-30 3 Chiller Replaced CH Chiller Bolting 05/09/2013 2-13-32 1 Valve Replaced SI Valve Bonnet Bolting and Sealed Welded Bonnet 12/03/2013 2-13-34 0 1 Valve Replaced CV Valve Bonnet Bolting and Sealed Welded Bonnet 12/03/2013 2-12-35 1 Valve Replaced CV Valve Bonnet Bolting and Sealed Welded Bonnet 12/03/2013 2-12-36 I Valve Replaced CV Valve Bonnet Bolting and Sealed Welded Bonnet 12/02/2013 2-12-37 co Ili

TABLE 2 ABSTRACT OF REPAIRS/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 2RE16 December 2013 Code Repair/Replacement Class Item Description Description of Work Date completed Plan Number 1 Valve Replaced CV Valve Bonnet Bolting and Sealed Welded Bonnet 12/02/2013 2-12-38 1 Valve Replaced RC Valve Bonnet Bolting and Sealed Welded Bonnet 12/06/2013 2-12-40 3 Pump Replaced EW Pump Lubrication Piping 10/12/2013 2-13-41 3 Pipe Replaced EW Flange and Piping 10/10/2013 2-13-42 3 Pipe Replaced EW Flange and Piping 10/08/2013 2-13-43 1 Valve Replaced RH Valve Disc 12/02/2013 2-13-45 3 Pipe Replaced EW Piping 10/19/2013 2-13-47 3 Pipe Replaced EW Piping 10/30/2013 2-13-48 3 Pipe Replaced EW Piping 10/31/2013 2-13-49 3 Pipe Replaced EW Piping 11/1/2013 2-13-51 3 Pump Replaced EW Pump 10/11/2013 2-13-52 3 Pipe Support Repaired EW Pipe Support 10/11/2013 2-13-53 3 Valve Replaced EW Valve 10/30/2013 2-13-54 2 Valve Replaced HC Valve 12/14/2013 2-13-55 3 Pump Fabricated new FC Pump Gland 10-07-2013 2-13-56 3 Pump Replaced FC Pump Gland 10/07/2013 2-13-57 3 Strainer Replaced EW Strainer Bolting 10/11/2013 2-13-58 3 Strainer Replaced EW Strainer Bolting 10/11/2013 2-13-59 3 Valve Replaced EW Valve 10/11/2013 2-13-60 2 Valve Replaced CV Valve Plug 12/12/2013 2-13-61 2 Pump Replaced RH Pump Seal Housing 11/21/2013 2-13-63 1 Valve Replaced RC Valve Bonnet 12/18/2013 2-13-64 2 Valve Replaced CV Valve 12/03/2013 2-13-65 1 Steam Generator Replaced Steam Generator Manway Bolting 12/12/2013 2-13-69 z 1 Valve Seal weld RH Valve Bonnet 12/02/2013 2-13-70 0 1 Snubber Replaced RC Snubber 12/10/2013 2-13-71 GC-)

CD0 co N)

NOC-AE-14003112 Page 1 of 8

SUMMARY

REPORT For the INSERVICE INSPECTION of UNIT 2 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION OUTAGE: 2RE16 STP NUCLEAR OPERATING COMPANY December 2013

NOC-AE-14003112 Page 2 of 8 COVER SHEET OUTAGE: 2RE16 INSERVICE INSPECTION

SUMMARY

REPORT SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 2 P.O. BOX 289 WADSWORTH, TEXAS 77483 USNRC DOCKET NO: 50-499 OPERATING LICENSE NO: NPF-80 COMMERCIAL OPERATION DATE: JUNE 19, 1989 Prepared by: _ 3 Ifz,(II4--

Otauber, ISI Progran Engineer Reviewed by:

IC.Y*onger, Supervising Engineer

NOC-AE-14003112 Page 3 of 8 SCOPE COMPONENT SUPPORTS, REPAIR AND REPLACEMENT, STEAM GENERATOR TUBING, SYSTEM PRESSURE TESTS AND WELD INSPECTION PROGRAMS (ASME IWB, IWC, IWD, IWF)

The examinations summarized in this report were performed in accordance with the 2004 Edition with no Addenda of the ASME Code,Section XI that is applicable to the South Texas Project, Unit 2, third ten-year interval (10/19/2010-10/18/2020), first period (10/19/2010-12/31/2013). This report covers selected ASME Code Class 1, 2 & 3 Systems/Components. This report is documented in accordance with the requirements of ASME Section XI Code Case N-532-4.

Examinations and tests required by the Code are scheduled in accordance with "Inspection Program B" as defined in IWB-2412 for ASME Code Class 1 Systems/Components, IWC-2412 for ASME Code Class 2 Systems/Components and IWD-2412 for ASME Code Class 3 Systems/Components and IWF-2410 for Component Supports.

The ASME Code Class 1 components were examined as prescribed by Table IWB-2500-1, and the applicable Examination Categories, which established the examination frequency at each refueling outage. The ASME Code Class 2 Systems/Components were examined in accordance with Table IWC-2500-1, Examination Categories. The ASME Code Class 3 Systems/Components were examined in accordance with Table IWD-2500-1, Examination Categories. Component Supports were examined in accordance with Code Table IWF-2500-1.

NOC-AE-14003112 Page 4 of 8 FORM OAR-I OWNER'S ACTIVITY REPORT (Code Case N-532-4) Corrected Report Nunmber OAR-2RE 16 Plant South Texas Proiect Electric Generating Station Unit No. 2 Commercial service date JUNE 19. 1989 Refueling outage no. 2RE16 (If applicable)

Current inspection interval IWR3 IW( IWD. IWF - 3 (Is', 2 d, 3td, 01, other)

Current inspection perio.d IWB. IWC. IWD. IWF - 1 d (I't, 2", 3ý1)

Edition and Addenda of Section XI applicable to the inspection plans 2004 No Addenda Date and revision of Inspection plans Revision 7 Effective date: 10/8/2012, Supplement I Effective date: 7/18/2013 Edition and Addenda of Section XI applicable, to repairs/replacement activities, if different than the inspection plans N/A Code Cases used N-460. N-532-4. N-578-1. N-722-1. N-770-1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 2RE16 conform to the requirements of Section XI.

(Refueling outage number)

Signed- AIF 01-.*

(Owner orlhOwersDein, Testing/Programs.Engineer Date-3 21-4 I4 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by ABS Boiler & Marine Insurance Co. of Houston, Texas have inspected the Items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/

replacement activities and evaluation described this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Inspecto{s Sijnature g, Ali SM0.1/ Nafonal Board, State, Province, and Endorsements Date 1"AA,

NOC-AE-14003112 Page 5 of 8 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE 2REI6 December 2013 Examination Items Item Evaluation description Category Number Description See Note #1 NOTES:

I. No items found with flaws or relevant conditions that required evaluation for continued service.

2. Surveillance procedure OPSP11-RC-0015 Rev. 17 (ASME Section XI Inservice Inspection) documents Inservice Inspection activities during 2RE 16.

TABLE 2 ABSTRACT OF REPAIRS/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 2RE16 December 2013 Code Repair/Replacement Class Item Description Description of Work Date completed Plan Number 2 Valve Temp Mod restoration of SB Valve 4/30/2010 2-10-28 2 Valve Replaced SB Valve 12/09/2013 2-11-05 3 Valve Replaced EW Valve 01117/2012 2-11-10 2 U-Strap Replaced U-Strap Support 03/01/2012 2-11-14 2 Pipe Replaced 2" CV Piping 02/17/2012 2-11-19 3 Valve Replaced EW Valve 08/13/2012 2-11-39 3 Pipe Installed EW Pipe Plugs 01/19/2012 2-11-42 3 Pump Replaced EW Pump with Product Lubricated Pump 01/24/2012 2-11-48 3 Seismic Support Modification of Seismic Support 01/24/2012 2-11-49 3 Valve Replaced EW Valve 01/227/2012 2-11-51 3 Pipe Replaced CH Flange Bolting 01/20/2012 2-12-05 3 Pipe Replaced EW Flange Bolting 01/26/2012 2-12-06 3 Pipe Machined spacer plate - EW Flange 01/24/2012 2-12-07 3 Pipe Replaced EW Flange & Piping 01/26/2012 2-12-08 3 Valve Replaced CH Valve Disk 01/20/2012 2-12-09 3 Pipe Replaced EW Pipe Spool 05/17/2012 2-12-11 3 Valve Replaced EW Valve Disk 05/31/2012 2-12-12 3 Pump Replaced CC Pump Gland Plate 06/08/2012 2-12-13 3 Valve Replaced EW Valve 05/17/2012 2-12-15 I Valve Repaired SI Valve Seal Cap 04/18/2012 2-12-22 3 Pipe Replaced EW Flange and Bolting 03/01/2012 2-12-23 3 Pipe Repaired EW Flange and Replaced Piping 11/25/2012 2-12-24 3 Strainer Replaced EW Strainer Bolting 05/18/2012 2-12-26 2 Valve Replaced EW Valve and Bolting 04/18/2012 2-12-28 z 2 Valve Replaced EW Valve and Bolting 10/02/2012 2-12-31 0 2 Valve Replaced EW Valve Plug 06/11/2013 2-12-32 3 Valve Replaced EW Valve 08/14/2012 2-12-33 ,m 1 Valve Replaced RC PSV Valve 12/14/2013 2-12-39 1 Valve Replaced RC PSV Valve 12/14/2013 2-12-40 (D

0) 0 1 Valve Replaced RC PSV Valve 12/14/2013 2-12-41 0 3 Pump Replaced RC Pump Motor Oil Coolers 12/12/2013 2-12-42 00

TABLE 2 ABSTRACT OF REPAIRS/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 2RE16 December 2013

  • = Corrected Code Repair/Replacement Class Item Description Description of Work Date completed Plan Number I Valve Replaced RC Valve Parts and Bolting 04/13/2013 2-12-45 3 Filter Replaced EW Filter Outlet Column End Cap 03/20/2013 2-12-46 2 Pipe Strap Removed and Reinstalled CV Pipe Strap 12/16P-013 2-12-48 2 Valve Replaced MS Valve Plug 12/15/2013 2-12-52 3 Cooling Coil Repaired EW Cooling Coil Leak 11/27/2012 2-12-54 1 Steam Generator Removed and Installed Steam Generator Diaphragms 12/04/2013 2-12-57 3 Pump Replaced RCP Motor Cooler Bolting 12/15/2013 2-12-62 3 Pump Replaced RCP Motor Cooler Bolting 12/14/2013 2-12-63 2 Valve Replaced FW Valve Hinge Pins 12/04/2-013 2-13-04 1 Valve Seal Welded RC Valve Body to Bonnet 04/1/2013 2-13-09 3 Pipe Replaced EW Sockolet and Piping 02/21/2013 2-13-10 3 Pipe Replaced CH Flange Bolting 05/09/2013 2-13-14 1 Pump Replaced RC Pump Seal Housing Bolting 12/14/2013 2-13-15 1 Valve Replaced RC Valve 04/04/2013 2-13-17 3 Pipe Replaced EW Flange and Piping 03/01/2013 2-13-18 3 Valve Replaced EW Valve 05/06/2013 2-13-19 3 Pipe Replaced EW Flange and Piping 03/22/2013 2-13-20 1 Valve Repaired EW Valve Body 03/22/2013 2-13-21 1 Valve Repaired RC Valve 3/11/2013 2-13-22 3 Pipe Replaced EW Flange and Piping 03/21/2013 2-13-24 3 Pipe Replaced EW Flange and Piping 10/30/2013 2-13-25 1 Pipe Support Replaced RC Pipe Support 03/29/2013 2-13-26 2 Pipe Replaced EW Flange and Piping 05/07/2013 2-13-27 3 Valve z

Repaired EW Valve 05/13/2013 2-13-28 0 3 Pipe Replaced EW Flange and Piping 05/09/2013 2-13-30 3 Chiller Replaced CH Chiller Bolting 05/09/2013 2-13-32 1 Valve Replaced SI Valve Bonnet Bolting and Sealed Welded Bonnet C-)

12/03/2013 2-13-34 1 Valve Replaced CV Valve Bonnet Bolting and Sealed Welded Bonnet 12/03/2013 2-12-35 (b0 1 Valve Replaced CV Valve Bonnet Bolting and Sealed Welded Bonnet 12/03/2013 2-12-36 00 r) 1 Valve Replaced CV Valve Bonnet.Bolting and Sealed Welded Bonnet 12/02/2013 2-12-37

TABLE 2

'ABSTRACT OF REPAIRS/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 2RE16 December 2013 Code Repair/Replacement Class Item Description Description of Work Date completed Plan Number 1 Valve Replaced CV Valve Bonnet Bolting and Sealed Welded Bonnet 12/02/2013 2-12-38 I Valve Replaced RC Valve Bonnet Bolting and Sealed Welded Bonnet 12/06/2013 2-12-40 3 Pump Replaced EW Pump Lubrication Piping 10/12/2013 2-13-41 3 Pipe Replaced EW Flange and Piping 10110/2013 2-13-42 3 Pipe Replaced EW Flange and Piping 10/08/2013 2-13-43 1 Valve Replaced RH Valve Disc 12/02/2013 2-13-45 3 Pipe Replaced EW Piping 10/19/2013 2-13-47 3 Pipe Replaced EW Piping 10/30/2013 2-13-48 3 Pipe Replaced EW Piping 10/31/2013 2-13-49 3 Pipe Replaced EW Piping 11/1/2013 2-13-51 3 Pump Replaced EW Pump 10/11/2013 2-13-52 3 Pipe Support Repaired EW Pipe Support 10/11/2013 2-13-53 3 Valve Replaced EW Valve 10/30/2013 2-13-54 2 Valve Replaced HC Valve 12/14/2013 2-13-55 3 Pump Fabricated new FC Pump Gland 10-07-2013 2-13-56 3 Pump Replaced FC Pump Gland 10/07/2013 2-13-57 3 Strainer Replaced EW Strainer Bolting 10/11/2013 2-13-58 3 Strainer Replaced EW Strainer Bolting 10/11/2013 2-13-59 3 Valve Replaced EW Valve 10/11/2013 2-13-60 2 Valve Replaced CV Valve Plug 12/12/2013 2-13-61 2 Pump Replaced RH Pump Seal Housing 11/21/2013 2-13-63 1 Valve Replaced RC Valve Bonnet 12/18/2013 2-13-64 2 Valve Replaced CV Valve 12/03/2013 2-13-65 1 Steam Generator Replaced Steam Generator Manway Bolting 12/12/2013 2-13-69 z 1 Valve Seal weld RH Valve Bonnet 12/02/2013 2-13-70 0 1 Snubber Replaced RC Snubber 12/10/2013 2-13-71 (D0 CD0 co K)

NOC-AE-14003112 Page 1 of 8

SUMMARY

REPORT For the INSERVICE INSPECTION of UNIT 2 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION OUTAGE: 2RE16 STP NUCLEAR OPERATING COMPANY December 2013

NOC-AE-14003112 Page 2 of 8 COVER SHEET OUTAGE: 2RE16 INSERVICE INSPECTION

SUMMARY

REPORT SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 2 P.O. BOX 289 WADSWORTH, TEXAS 77483 USNRC DOCKET NO: 50-499 OPERATING LICENSE NO: NPF-80 COMMERCIAL OPERATION DATE: JUNE 19, 1989 Prepared by: -t ,47

. tauber, ISI Program Engineer Reviewed by:

(t. Yo ngZer, Supervising Engineer

NOC-AE-14003112 Page 3 of 8 SCOPE COMPONENT SUPPORTS, REPAIR AND REPLACEMENT, STEAM GENERATOR TUBING, SYSTEM PRESSURE TESTS AND WELD INSPECTION PROGRAMS (ASME IWB, IWC, IWD, IWF)

The examinations summarized in this report were performed in accordance with the 2004 Edition with no Addenda of the ASME Code,Section XI that is applicable to the South Texas Project, Unit 2, third ten-year interval (10/19/2010-10/18/2020), first period (10/19/2010-12/31/2013). This report covers selected ASME Code Class 1, 2 & 3 Systems/Components. This report is documented in accordance with the requirements of ASME Section XI Code Case N-532-4.

Examinations and tests required by the Code are scheduled in accordance with "Inspection Program B" as defined in IWB-2412 for ASME Code Class 1 Systems/Components, IWC-2412 for ASME Code Class 2 Systems/Components and IWD-2412 for ASME Code Class 3 Systems/Components and IWF-2410 for Component Supports.

The ASME Code Class 1 components were examined as prescribed by Table IWB-2500-1, and the applicable Examination Categories, which established the examination frequency at each refueling outage. The ASME Code Class 2 Systems/Components were examined in accordance with Table IWC-2500-1, Examination Categories. The ASME Code Class 3 Systems/Components were examined in accordance with Table IWD-2500-1, Examination Categories. Component Supports were examined in accordance with Code Table IWF-2500- 1.

NOC-AE-14003112 Page 4 of 8 FORM OAR-I OWNER'S ACTIVITY REPORT (Code Case N-532-4) Corrected Report Nunmber OAR-9.R ft. 1(*

OAR-2 R F IA Plant Q-thk~ Tnvoe P-nh;t Pl-fi,4,.

r.

Q1.fnan,

-~rr UnitNo. 2 Commercial service date_ JUNE 191989 Refueling outage no. 2RE16 (If applicable)

Current inspection interval IWB., IWC, IWD, IWF -3d (Is', 2 1d, 3rd, 4"', other)

Current inspection period IWB, IWC. [IWD, IWF - I"t (Is,2ld 3"r)

Edition and Addenda of Section XI applicable to the inspection plans 2004 No Addenda Date and revision of Inspection plans Revision 7 Effective date: 10/8/2012, Supplement 1 Effective date: 7/18/2013 Edition and Addenda of Section XI applicable to repairs/replacement activities, if different than the inspection plans N/A Code Cases used: N-460, N-532-4, N-578- 1,N-722-1, N-770-1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 2RE16 conform to the requirements of Section X1.

(Refueling outage number)

Signed- A aA-(Owner orOwe'Dsin,

'""' Testing/Programs Engineer Date 3 "ZI " Q 14 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by ABS Boiler & Marine Insurance Co. of Houston, Texas have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/

replacement activities and evaluation described this report. Furthermore, neither the inspector nor his employer shiall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

ýý' Signatire A, ,

o-mm Hionsnhspectov's / 5-X Na.ional Board, State, Province, and Endorsements Date /4 4 ý-O/A

NOC-AE-14003112 Page 5 of 8 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE 2REI6 December 2013 Examination Items Item Evaluation description Category Number Description See Note #1 NOTES:

I. No items found with flaws or relevant conditions that required evaluation for continued service.

2. Surveillance procedure OPSPl I-RC-0015 Rev. 17 (ASME Section XI Inservice Inspection) documents Inservice Inspection activities during 2RE 16.

TABLE 2 ABSTRACT OF REPAIRS/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 2RE16 December 2013 Code Repair/Replacement Class Item Description Description of Work Date completed Plan Number 2 Valve Temp Mod restoration of SB Valve 4/30/2010 2-10-28 2 Valve Replaced SB Valve 12/09/2013 2-11-05 3 Valve Replaced EW Valve 01/17/2012 2-11-10 2 U-Strap Replaced U-Strap Support 03/01/2012 2-11-14 2 Pipe Replaced 2" CV Piping 02/17/2012 2-11-19 3 Valve Replaced EW Valve 08/13/2012 2-11-39 3 Pipe Installed EW Pipe Plugs 01/19/2012 2-11-42 3 Pump Replaced EW Pump with Product Lubricated Pump 01/24/2012 2-11-48 3 Seismic Support Modification of Seismic Support 01/24/2012 2-11-49 3 Valve Replaced EW Valve 01/27/2012 2-11-51 3 Pipe Replaced CH Flange Bolting 01/20/2012 2-12-05 3 Pipe Replaced EW Flange Bolting 01/26/2012 2-12-06 3 Pipe Machined spacer plate - EW Flange 01/24/2012 2-12-07 3 Pipe Replaced EW Flange & Piping 01/26/2012 2-12-08 3 Valve. Replaced CH Valve Disk 01/20/2012 2-12-09 3 Pipe Replaced EW Pipe Spool 05/17/2012 2-12-11 3 Valve Replaced EW Valve Disk 05/31/2012 2-12-12 3 Pump Replaced CC Pump Gland Plate 06/08/2012 2-12-13 3 Valve Replaced EW Valve 05/17/2012 2-12-15 1 Valve Repaired SI Valve Seal Cap 04/18/2012 2-12-22 3 Pipe Replaced EW Flange and Bolting 03/01/2012 2-12-23 3 Pipe Repaired EW Flange and Replaced Piping 11/25/2012 2-12-24 3 Strainer Replaced EW Strainer Bolting 05/18/2012 2-12-26 2 Valve Replaced EW Valve and Bolting 04/18/2012 2-12-28 z 2 Valve Replaced EW Valve and Bolting 10/02/2012 2-12-31 0 2 Valve Replaced EW Valve Plug 06/11/2013 2-12-32O 3 Valve Replaced EW Valve 08/14/2012 2-12-33 3 Valve Replaced RC PSV Valve 12/14/2013 2-12-393 11-I Valve Replaced RC PSV Valve 12/14/2013 39 2-12-40 o 1 Valve Replaced RC PSV Valve 12/14/2013 2-12-41 0ow 3_ Pump Replaced RC Pump Motor Oil Coolers 12/12/2013 2-12-42 oo

TABLE 2 ABSTRACT OF REPAIRS/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 2RE16 December 2013

  • = Corrected Code Repair/Replacement Class Item Description Description of Work Date completed Plan Number 1 Valve Replaced RC Valve Parts and Bolting 04/13/2013 2-12-45 3 Filter Replaced EW Filter Outlet Column End Cap 03/20/2013 2-12-46 2 Pipe Strap Removed and Reinstalled CV Pipe Strap 12/16/2013 2-12-48 2 Valve Replaced MS Valve Plug 12/15/2013 2-12-52 3 Cooling Coil Repaired EW Cooling Coil Leak 11/27/2012 2-12-54 1 Steam Generator Removed and Installed Steam Generator Diaphragms 12/04/2013 2-12-57 3 Pump Replaced RCP Motor Cooler Bolting 12/15/2013 2-12-62 3 Pump Replaced RCP Motor Cooler Bolting 12/14/2013 2-12-63 2 Valve Replaced FW Valve Hinge Pins 12/04/2013 2-13-04 1 Valve Seal Welded RC Valve Body to Bonnet 04/1/2013 2-13-09 3 Pipe Replaced EW Sockolet and Piping 02/21/2013 2-13-10 3 Pipe Replaced CH Flange Bolting 05/09/2013 2-13-14 1 Pump Replaced RC Pump Seal Housing Bolting 12/14/2013 2-13-15
  • I Valve Replaced RC Valve 04/04/2013 2-13-17 3 Pipe Replaced EW Flange and Piping 03/01/2013 2-13-18 3 Valve Replaced EW Valve 05/06/2013 2-13-19 3 Pipe Replaced EW Flange and Piping 03/22/2013 2-13-20 I Valve Repaired EW Valve Body 03/22/2013 2-13-21 1 Valve Repaired RC Valve 3/11/2013 2-13-22 3 Pipe Replaced EW Flange and Piping 03/21/2013 2-13-24 3 Pipe Replaced EW Flange and Piping 10/30/2013 2-13-25 1 Pipe Support Replaced RC Pipe Support 03/29/2013 2-13-26 2 Pipe Replaced EW Flange and Piping 05/07/2013 2-13-27 z 3 Valve Repaired EW Valve 05/13/2013 2-13-28 0 3 Pipe Replaced EW Flange and Piping 05/09/2013 2-13-30 3 Chiller Replaced CH Chiller Bolting 05/09/22013 2-13-32 ,m 1 Valve Replaced SI Valve Bonnet Bolting and Sealed Welded Bonnet 12/03/2013 2-13-34 ca I Valve Replaced CV Valve Bonnet Bolting and Sealed Welded Bonnet 12/03/2013 2-12-35 (D 0 N) 1 Valve Replaced CV Valve Bonnet Bolting and Sealed Welded Bonnet 12/03/2013 2-12-36 0 1 Valve Replaced CV Valve BonnetBolting and Sealed Welded Bonnet 12/02/2013 2-12-37 OD

TABLE 2 ABSTRACT OF REPAIRS/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 2RE16 December 2013 Code Repair/Replacement Class Item Description Description of Work Date completed Plan Number 1 Valve Replaced CV Valve Bonnet Bolting and Sealed Welded Bonnet 12/02/2013 2-12-38 1 Valve Replaced RC Valve Bonnet Bolting and Sealed Welded Bonnet 12/06/2013 2-12-40 3 Pump Replaced EW Pump Lubrication Piping 10/12/2013 2-13-41 3 Pipe Replaced EW Flange and Piping 10/10/2013 2-13-42 3 Pipe Replaced EW Flange and Piping 10/08/2013 2-13-43 1 Valve Replaced RH Valve Disc 12/02/2013 2-13-45 3 Pipe Replaced EW Piping 10/19/2013 2-13-47 3 Pipe Replaced EW Piping 10/30/2013 2-13-48 3 Pipe Replaced EW Piping 10/31/2013 2-13-49 3 Pipe Replaced EW Piping 11/1/2013 2-13-51 3 Pump Replaced EW Pump 10/11/2013 2-13-52 3 Pipe Support Repaired EW Pipe Support 10/11/2013 2-13-53 3 Valve Replaced EW Valve 10/30/2013 2-13-54 2 Valve Replaced HC Valve 12/14/2013 2-13-55 3 Pump Fabricated new FC Pump Gland 10-07-2013 2-13-56 3 Pump Replaced FC Pump Gland 10/07/2013 2-13-57 3 Strainer Replaced EW Strainer Bolting 10/11/2013 2-13-58 3 Strainer Replaced EW Strainer Bolting 10/11/2013 2-13-59 3 Valve Replaced EW Valve 10/11/2013 2-13-60 2 Valve Replaced CV Valve Plug 12/12/2013 2-13-61 2 Pump Replaced RH Pump Seal Housing 11/21/2013 2-13-63 1 Valve Replaced RC Valve Bonnet 12/18/2013 2-13-64 2 Valve Replaced CV Valve 12/03/2013 2-13-65 1 Steam Generator Replaced Steam Generator Manway Bolting 12/12/2013 2-13-69 z 1 Valve Seal weld RH Valve Bonnet 12/02/2013 2-13-70 0 1 Snubber Replaced RC Snubber 12/10/2013 2-13-71 (D 5, co 0:

00

NOC-AE-14003112 Page 1 of 8

SUMMARY

REPORT For the INSERVICE INSPECTION of UNIT 2 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION OUTAGE: 2RE16 STP NUCLEAR OPERATING COMPANY December 2013

NOC-AE-14003112 Page 2 of 8 COVER SHEET OUTAGE: 2RE16 INSERVICE INSPECTION

SUMMARY

REPORT SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 2 P.O. BOX 289 WADSWORTH, TEXAS 77483 USNRC DOCKET NO: 50-499 OPERATING LICENSE NO: NPF-80 COMMERCIAL OPERATION DATE: JUNE 19, 1989 Prepared by: _ 3(z, J 14-Otauber, ISI Program Engineer Reviewed by:

(c. YvoV j pervising Engineer

NOC-AE-14003112 Page 3 of 8 SCOPE COMPONENT SUPPORTS, REPAIR AND REPLACEMENT, STEAM GENERATOR TUBING, SYSTEM PRESSURE TESTS AND WELD INSPECTION PROGRAMS (ASME IWB, IWC, IWD, IWF)

The examinations summarized in this report were performed in accordance with the 2004 Edition with no Addenda of the ASME Code,Section XI that is applicable to the South Texas Project, Unit 2, third ten-year interval (10/19/2010-10/18/2020), first period (10/19/2010-12/31/2013). This report covers selected ASME Code Class 1, 2 & 3 Systems/Components. This report is documented in accordance with the requirements of ASME Section XI Code Case N-532-4.

Examinations and tests required by the Code are scheduled in accordance with "Inspection Program B" as defined in IWB-2412 for ASME Code Class 1 Systems/Components, IWC-2412 for ASME Code Class 2 Systems/Components and IWD-2412 for ASME Code Class 3 Systems/Components and IWF-2410 for Component Supports.

The ASME Code Class 1 components were examined as prescribed by Table IWB-2500-1, and the applicable Examination Categories, which established the examination frequency at each refueling outage. The ASME Code Class 2 Systems/Components were examined in accordance with Table IWC-2500-1, Examination Categories. The ASME Code Class 3 Systems/Components were examined in accordance with Table IWD-2500-1, Examination Categories. Component Supports were examined in accordance with Code Table IWF-2500-1.

NOC-AE-14003112 Page 4 of 8 FORM OAR-1 OWNER'S ACTIVITY REPORT (Code Case N-532-4) Corrected Report Nunmber OAR-2RE16 Plant South Texas Proiect Electric Generatin 1ý Station Unit No. 2 Commercial service date JUNE 19- 1989 Refueling outage no. 2RE16 (If applicable)

Current inspection interval IWB IWC. IWD. IWF - 3id (Is, 2 ,,d,3 ,d4 th,other)

TWP~ TWO- IWI"h IWF -Is Current inspection period (1 ' 2 ,1d,3d)

Edition and Addenda of Section Xt applicable to the inspection plans 2004 No Addenda Date and revision of Inspection plans Revision 7 Effective date: 10/8/2012, Supplement I Effective date: 7/18/2013 Edition and Addenda of Section XI applicable, to repairs/replacement activities, if different than the inspection plans N/A Code Cases used:. N-460. N-532-4. N-578-1. N-722-1. N-770-1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 2RE16 conform to the requirements of Section XI.

(Refueling outage number)

Signed, IA 6-

  • QS-5 , ."", . Testing/Programs.Engineer Date 3 Z - I 'f (Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Texas and employed by ABS Boiler & Marine Insurance Co. of Houston. Texas have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/

replacement activities and evaluation described this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

c hwspeto uSig-atdre .,i..s Nafional Board, State, Province, and Endorsements Date

NOC-AE-14003112 Page 5 of 8 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE 2RE16 December 2013 Examination Items Item Evaluation description Category Number Description See Note #1 NOTES:

1. No items found with flaws or relevant conditions that required evaluation for continued service.
2. Surveillance procedure OPSP11-RC-0015 Rev,17 (ASME Section XI Inservice Inspection) documents Inservice Inspection activities during 2RE 16.

TABLE 2 ABSTRACT OF REPAIRS/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 2RE16 December 2013 Code Repair/Replacement Class Item Description Description of Work Date completed Plan Number 2 Valve Temp Mod restoration of SB Valve 4/30/2010 2-10-28 2 Valve Replaced SB Valve 12/09/2013 2-11-05 3 Valve Replaced EW Valve 01/17/2012 2-11-10 2 U-Striap Replaced U-Strap Support 03/01/2012 2-11-14 2 Pipe Replaced 2" CV Piping 02/17/2012 2-11-19 3 Valve Replaced EW Valve 08/13/2012 2-11-39 3 Pipe Installed EW Pipe Plugs 01/19/2012 2-11-42 3 Pump Replaced EW Pump with Product Lubricated Pump 01/24/2012 2-11-48 3 Seismic Support Modification of Seismic Support 01/24/2012 2-11-49 3 Valve Replaced EW Valve 01/27/2012 2-11-51 3 Pipe Replaced CH Flange Bolting 01/20/2012 2-12-05 3 Pipe Replaced EW Flange Bolting 01/26/2012 2-12-06 Pipe Machined spacer plate - EW Flange 01/24/2012 2-12-07 3 Pipe Replaced EW Flange & Piping 01/26/2012 2-12-08 3 Valve Replaced CH Valve Disk 01/20/2012 2-12-09 3 Pipe Replaced EW Pipe Spool 05/17/2012 2-12-11 3 Valve Replaced EW Valve Disk 05/31/2012 2-12-12 3 Pump Replaced CC Pump Gland Plate 06/08/2012 2-12-13 3 Valve Replaced EW Valve 05/17/2012 2-12-15 1 Valve Repaired SI Valve Seal Cap 04/18/2012 2-12-22 3 Pipe Replaced EW Flange and Bolting 03/01/2012 2-12-23 3 Pipe Repaired EW Flange and Replaced Piping 11/25/2012 2-12-24 3 Strainer Replaced EW Strainer Bolting 05/18/2012 2-12-26 2 Valve Replaced EW Valve and Bolting 04/18/2012 2-12-28 z 2 Valve Replaced EW Valve and Bolting 10/02/2012 2-12-31 0 2 Valve Replaced EW Valve Plug 06/11/2013 2-12-32 3 Valve Replaced EW Valve 08/14/2012 2-12-33 Cm C~)

1 Valve Replaced RC PSV Valve 12/14/2013 2-12-39 0I 1 Valve Replaced RC PSV Valve 12/14/2013 2-1240 o0, CD 0 0')

1 Valve Replaced RC PSV Valve 12/14/2_013 2-12-41 0 3 Pump Replaced RC Pump Motor Oil Coolers 12/12/2013 2-12-42

TABLE 2 ABSTRACT OF REPAIRS/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 2RE16 December 2013

  • = Corrected Code Repair/Replacement Class Item Description Description of Work Date completed Plan Number I Valve Replaced RC Valve Parts and Bolting 04/13/2013 2-12-45 3 Filter Replaced EW Filter Outlet Column End Cap 03/20/2013 2-12-46 2 Pipe Strap Removed and Reinstalled CV Pipe Strap 12/16/2013 2-12-48 2 Valve Replaced MS Valve Plug 12/15/2013 2-12-52 3 Cooling Coil Repaired EW Cooling Coil Leak 11/27/2012 2-12-54 I Steam Generator Removed and Installed Steam Generator Diaphragms 12/04/2013 2-12-57 3 Pump Replaced RCP Motor Cooler Bolting 12/15/2013 2-12-62 3 Pump Replaced RCP Motor Cooler Bolting 12/14/2013 2-12-63 2 Valve Replaced FW Valve Hinge Pins 12/04/2013 2-13-04 1 Valve Seal Welded RC Valve Body to Bonnet 04/1/2013 2-13-09 3 Pipe Replaced EW Sockolet and Piping 02/21/2013 2-13-10 3 Pipe Replaced CH Flange Bolting 05/09/2013 2-13-14 1 Pump Replaced RC Pump Seal Housing Bolting 12/14/2013 2-13-15 1 Valve Replaced RC Valve 04/04/2013 2-13-17 3 Pipe Replaced EW Flange and Piping 03/01/2013 2-13-18 3 Valve Replaced EW Valve 05/06/2013 2-13-19 3 Pipe Replaced EW Flange and Piping 03/22/2013 2-13-20 1 Valve Repaired EW Valve Body 03/22/2013 2-13-21 1 Valve Repaired RC Valve 3/11/2013 2-13-22 3 Pipe Replaced EW Flange and Piping 03/21/2013 2-13-24 3 Pipe Replaced EW Flange and Piping 10/30/2013 2-13-25 I Pipe Support Replaced RC Pipe Support 03/29/2013 2-13-26 2 Pipe Replaced EW Flange and Piping 05/07/2013 2-13-27 -

Valve Repaired EW Valve 05/13/2013 2-13-28 0 3 Pipe Replaced EW Flange and Piping 05/09/2013 2-13-30 3 Chiller Replaced CH Chiller Bolting 05/09/2013 2-13-32 -u ,m I Valve Replaced SI Valve Bonnet Bolting and Sealed Welded Bonnet 12/03/2013 2-13-34 c, 1 Valve Replaced CV Valve Bonnet Bolting and Sealed Welded Bonnet 12/03/2013 2-12-35 (D C 1 Valve Replaced CV Valve Bonnet Bolting and Sealed Welded Bonnet 12/03/2013 2-12-36 0%

I Valve Replaced CV Valve Bonnet Bolting and Sealed Welded Bonnet 12/02/2013 2-12-37

TABLE 2 ABSTRACT OF REPAIRS/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE 2RE16 December 2013 Code Repair/Replacement Class Item Description Description of Work Date completed Plan Number 1 Valve Replaced CV Valve Bonnet Bolting and Sealed Welded Bonnet 12/02/2013 2-12-38 I Valve Replaced RC Valve Bonnet Bolting and Sealed Welded Bonnet 12/06/2013 2-12-40 3 Pump Replaced EW Pump Lubrication Piping 10/12/2013 2-13-41 3 Pipe Replaced EW Flange and Piping 10/10/2013 2-13-42 3 Pipe Replaced EW Flange and Piping 10/08/2013 2-13-43 1 Valve Replaced RH Valve Disc 12/02/2013 2-13-45 3 Pipe Replaced EW Piping 10/1912013 2-13-47 3 Pipe Replaced EW Piping 10/30/2013 2-13-48 3 Pipe Replaced EW Piping 10/31/2013 2-13-49 3 Pipe Replaced EW Piping 11/1/2013 2-13-51 3 Pump Replaced EW Pump 10/11/2013 2-13-52 3 Pipe Support Repaired EW Pipe Support 10/11/2013 2-13-53 3 Valve Replaced EW Valve 10/30/2013 2-13-54 2 Valve Replaced HC Valve 12/14/2013 2-13-55 3 Pump Fabricated new FC Pump Gland 10-07-2013 2-13-56 3 Pump Replaced FC Pump Gland 10/07/2013 2-13-57 3 Strainer Replaced EW Strainer Bolting 10/11/2013 2-13-58 3 Strainer Replaced EW Strainer Bolting 10/11/2013 2-13-59 3 Valve Replaced EW Valve 10/11/2013 2-13-60 2 Valve Replaced CV Valve Plug 12/12/2013 2-13-61 2 Pump Replaced RH Pump Seal Housing 11/21/2013 2-13-63 1 Valve Replaced RC Valve Bonnet 12/18/2013 2-13-64 2 Valve Replaced CV Valve 12/03/2013 2-13-65 1 Steam Generator Replaced Steam Generator Manway Bolting 12/12/2013 2-13-69 z 1 Valve Seal weld RH Valve Bonnet 12/02/2013 2-13-70 0 1 Snubber Replaced RC Snubber 12/10/2013 2-13-71 CD 0D

-o 0 cor%

-