MONTHYEARML23229A5262023-08-17017 August 2023 Inservice Inspection Summary Report - 1 RE24, ML23221A3002023-08-0909 August 2023 RE22 Inspection Summary Report for Steam Generator Tubinq, Rev. 1 (Epld L-2023-LRO-0029) ML23044A6192023-02-13013 February 2023 Summary Report for Inservice Inspection (2RE22) Completed in November 2022 ML22033A5442022-02-0202 February 2022 Inservice Inspection Summary Report -1RE23 NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 ML21196A4922021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval ML21144A1092021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval ML20303A2602020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing ML20281A8542020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing ML20191A2702020-07-0909 July 2020 Inservice Inspection Summary Report -1RE22 NOC-AE-20003700, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01)2020-01-22022 January 2020 Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01) NOC-AE-20003703, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-04)2020-01-22022 January 2020 Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-04) NOC-AE-19003696, Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096)2019-11-26026 November 2019 Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096) NOC-AE-19003620, Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23)2019-02-28028 February 2019 Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23) NOC-AE-19003624, Inservice Inspection Summary Report- 1RE212019-02-0707 February 2019 Inservice Inspection Summary Report- 1RE21 NOC-AE-18003603, Transmittal of 2RE19 Inspection Summary Report for Steam Generator Tubing2018-10-18018 October 2018 Transmittal of 2RE19 Inspection Summary Report for Steam Generator Tubing NOC-AE-18003587, Inservice Inspection Summary Report -2RE192018-07-25025 July 2018 Inservice Inspection Summary Report -2RE19 NOC-AE-17003503, Inservice Inspection Summary Report - 1 RE202017-07-20020 July 2017 Inservice Inspection Summary Report - 1 RE20 NOC-AE-17003440, Inservice Inspection Summary Report -2RE18 Completed in November 20162017-02-0808 February 2017 Inservice Inspection Summary Report -2RE18 Completed in November 2016 NOC-AE-16003364, 1RE19 Inspection Summary Report for Steam Generator Tubing2016-04-25025 April 2016 1RE19 Inspection Summary Report for Steam Generator Tubing NOC-AE-16003355, Inservice Inspection Summary Report, 1RE192016-03-24024 March 2016 Inservice Inspection Summary Report, 1RE19 NOC-AE-15003282, Inservice Inspection Summary Report -2E172015-08-0606 August 2015 Inservice Inspection Summary Report -2E17 NOC-AE-14003170, Inservice Inspection Summary Report - 1 RE182014-08-26026 August 2014 Inservice Inspection Summary Report - 1 RE18 NOC-AE-14003139, RE16 Inspection Summary Report for Steam Generator Tubing2014-05-22022 May 2014 RE16 Inspection Summary Report for Steam Generator Tubing NOC-AE-14003112, Inservice Inspection Summary Report - 2RE162014-03-24024 March 2014 Inservice Inspection Summary Report - 2RE16 NOC-AE-13002968, Inservice Inspection Summary Report - 1RE172013-02-21021 February 2013 Inservice Inspection Summary Report - 1RE17 NOC-AE-12002803, Inservice Inspection Summary Report - 2RE152012-02-20020 February 2012 Inservice Inspection Summary Report - 2RE15 NOC-AE-11002722, RE16 Inspection Summary Report for Steam Generator Tubing2011-09-21021 September 2011 RE16 Inspection Summary Report for Steam Generator Tubing NOC-AE-11002706, Inservice Inspection Summary Report - 1RE162011-07-28028 July 2011 Inservice Inspection Summary Report - 1RE16 NOC-AE-11002651, Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval2011-03-14014 March 2011 Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval NOC-AE-10002585, Inservice Inspection Summary Report - 2RE142010-08-0202 August 2010 Inservice Inspection Summary Report - 2RE14 NOC-AE-10002577, Notification of Upgrading of the Inservice Inspection Program for the Third Inspection Interval2010-07-29029 July 2010 Notification of Upgrading of the Inservice Inspection Program for the Third Inspection Interval NOC-AE-10002565, Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval2010-07-13013 July 2010 Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval NOC-AE-11002684, Categorization of Risk-Informed Piping2010-06-20020 June 2010 Categorization of Risk-Informed Piping ML1006401202010-02-22022 February 2010 Inservice Testing Program Description for the Third 10-Year Interval NOC-AE-10002522, Inservice Inspection Summary Report - 1RE152010-02-16016 February 2010 Inservice Inspection Summary Report - 1RE15 NOC-AE-09002408, Transmittal of 2RE13 Inspection Summary Report for Steam Generator Tubing2009-03-24024 March 2009 Transmittal of 2RE13 Inspection Summary Report for Steam Generator Tubing NOC-AE-09002381, Inservice Inspection Summary Report - 2RE132009-01-20020 January 2009 Inservice Inspection Summary Report - 2RE13 NOC-AE-08002318, Inservice Inspection Summary Report - 1RE142008-06-23023 June 2008 Inservice Inspection Summary Report - 1RE14 NOC-AE-07002195, Inservice Inspection Summary Report - 2RE122007-07-25025 July 2007 Inservice Inspection Summary Report - 2RE12 NOC-AE-07002143, 1RE13 Inservice Inspection Summary Report for Steam Generator Tubing2007-04-16016 April 2007 1RE13 Inservice Inspection Summary Report for Steam Generator Tubing ML0701602012007-01-0808 January 2007 Inservice Inspection Summary Report - IRE13 NOC-AE-06001960, Inservice Inspection Summary Report2006-01-19019 January 2006 Inservice Inspection Summary Report NOC-AE-05001938, Refueling Outage Inservice Inspection Results for Steam Generator Tubing2005-10-12012 October 2005 Refueling Outage Inservice Inspection Results for Steam Generator Tubing NOC-AE-05001910, Inservice Inspection Summary Report - 1RE122005-07-15015 July 2005 Inservice Inspection Summary Report - 1RE12 NOC-AE-05001853, Revised Steam Generator Tube Inservice Inspection Plan for the Second Inspection Interval at Plant2005-03-0303 March 2005 Revised Steam Generator Tube Inservice Inspection Plan for the Second Inspection Interval at Plant NOC-AE-04001763, Inservice Inspection Summary Report for Welds and Component Supports - 2RE102004-07-22022 July 2004 Inservice Inspection Summary Report for Welds and Component Supports - 2RE10 2023-08-09
[Table view] Category:Letter type:NOC
MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003761, Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic2020-09-10010 September 2020 Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic NOC-AE-20003760, Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal2020-09-0808 September 2020 Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal 2023-07-11
[Table view] |
Text
Nuclear Operating Company South Texas Pmlcct Electric Generating Station P.O. Bos 289 Wadsnvrlh. Texas 77483 July 15,2021 NOC-AE-21003819 10CFR50.55a STI:35187483 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 South Texas Project Unit 2 Docket No. STN 50-499 Inservice Inspection Summary Report - 2RE21 Attached is the South Texas Project Electric Generating Station Unit 2 summary report for inservice inspections performed prior to and during scheduled refueling outage 2RE21 completed in April 2021. This summary report satisfies the reporting requirements of American Society of Mechanical Engineers ASME Code Section Xl, Article IWA-6230.
There are no commitments in this letter.
If there are any questions regarding this report, please contact All Albaaj at (361) 972-8949 or me at (361) 972-7806.
'*H^
Chris Georgesor General Manager, Engineering aa
Enclosure:
Summary Report for the 2RE21 Inservice Inspection of Unit 2 South Texas Project Electric Generating Station ec:
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Chief Inspector Texas Department of Licensing and Regulation Boiler Program P.O. Box 12157 Austin, TX 78711
SUMMARY
REPORT for the 2RE21 INSERVICE INSPECTION of UNIT 2 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Nuclear Operating Company STP NUCLEAR OPERATING COMPANY Spring 2021
COVER SHEET 2RE21 INSERVICE INSPECTION
SUMMARY
REPORT SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 2 P.O. BOX 289 WADSWORTH, TEXAS 77483 USNRC DOCKET NO: 50-499 OPERATING LICENSE NO: NPF-80 COMMERCIAL OPERATION DATE: JUNE 19, 1989 Prepared by: Date5<S3w^31 Eric Lahtz^lSl^fbgram Owne Reviewed by: Date ^1^^\2\
Clay1'bn^B6nno(,Supe esting Programs
SCOPE COMPONENT SUPPORTS, WELDS, THERMAL FATIGUE, REPAIR/REPLACEMENT, AND SYSTEM PRESSSURE TESTING INSPECTION PROGRAMS (IWB, IWC, IWD, IWE, IWF)
The examinations summarized in this report were performed in accordance with the 2013 Edition of the ASME Code, Section Xl that is applicable to the South Texas Project, Unit 2, fourth ten-year interval (09/25/2020-09/08/2029), first period (09/25/2020-09/24/2023).
This report covers selected ASME Code Class 1, 2, and 3 Systems/Components. This report is documented in accordance with the requirements of ASME Section Xl Code Case N-532-5.
Examinations and tests required by the Code are scheduled in accordance with "Inspection Program B" as defined in IWB-2412 for ASME Code Class 1 Systems/Components, IWC-2412 forASME Code Class 2 Systems/Components, IWD-2412 for ASME Code Class 3 Systems/Components, and IWF-2410 component supports.
ASME Code Class 1 components were examined as prescribed by Table IWB-2500-1 and the applicable Examination Categories, which established the examination frequency at each refueling outage. The ASME Code Class 2 Systems/Components were examined in accordance with Table IWC-2500-1, Examination Categories. The ASME Code Class 3 Systems/Components were examined in accordance with Table IWD-2500-1, Examination Categories. Component Supports were examined in accordance with IWF-Table 2500-1, Examination Categories.
TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE 2RE21 SPRING 2021 ASME Item Item Evaluation Description Category Number Description F-A F1.20C MS-2001-HL5014:Main Inservice Inspection identified Spring Hangar MS-Steam Spring Hangar 2001-HL5014 setpoint out of tolerance per
[2-CS-224000] procedure.
[VTC-2021-016]
Corrective Action to perform Evaluation perASME Xl IWF-3122.3. Results determined Acceptable for Service at current setpoint.
[21-3514-2]
Work Order adjusted Spring Hangar back to original design setpoint.
[21-3514-1]
B-D B3.110 Safety Nozzle to Shell weld Historical: 2RE20 - Inservice Inspection identified an PRZ-2-N4C area of interest, requiring evaluation.
[Summary 2-WD-011000] [UT-2019-031]
Analytical Evaluation performed by Westinghouse determined indication is acceptable in accordance with IWB-3132.3 and IWB-3600. (applicable until 2RE22)
[LTR-SDA-19-095-P Rev 0] - [STI 34937975]
Re-examination scheduled for 2RE21 in accordance with IWB-2420(b) and (c).
Current: 2RE21 Examination found flaw did not increase in size.
[UT-2021-025]
Westinghouse Analytical Evaluation to accept condition for Life of Plant scheduled prior to 2RE22.
[CR-19-11865-8]
TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE CORRECTIVE ITEM DATE REPAIR / REPLACMENT CLASS SYSTEM DESCRIPTION OF WORK MEASURE DESCRIPTION COMPLETED PLAN AUXILIARY 3 REPLACEMENT VALVE Installed new by-pass body. 10/12/2020 2-18-019 FEEDWATER COMPONENT 2 REPAIR VALVE Reworked Spare valve. 11/1/2019 2-19-034 COOLING ESSENTIAL 3 REPLACEMENT VALVE COOLING Valve internals replaced. 2/12/2020 2-19-043 WATER ESSENTIAL Replaced packing fasteners, 3 REPLACEMENT STRAINER COOLING cover fasteners, back wash 1/24/2020 2-20-003 WATER arm/shat assembly.
ESSENTIAL 3 REPLACEMENT VALVE COOLING Replaced valve. 1/22/2020 2-20-004 WATER ESSENTIAL 3 REPLACEMENT FLANGE COOLING Replaced flange. 2/26/2020 2-20-005 WATER ESSENTIAL 3 REPLACEMENT VALVE COOLING Replace valve. 10/20/2020 2-20-007 WATER REACTOR 1 REPLACEMENT SEAL PACKAGE Replaced Seal Pkg 04/09/2021 2-20-009 COOLANT CHEMICAL 2 REPLACEMENT VALVE VOLUME Plug replaced. 4/4/2021 2-20-012 CONTROL 2 REPLACEMENT VALVE MAIN STEAM Plug replaced. 4/8/2021 2-20-017 ESSENTIAL 3 REPLACEMENT VALVE COOLING Replace valve. 2/27/2021 2-20-019 WATER CONTAINMENT Refurbished valve and return to 2 REPAIR VALVE 04/12/2021 2-20-021 HVAC warehouse.
REACTOR 1 REPLACEMENT VALVE Removed Old Valve. 4/3/2021 2-20-026 COOLANT
TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE CORRECTIVE ITEM DATE REPAIR / REPLACMENT CLASS SYSTEM DESCRIPTION OF WORK MEASURE DESCRIPTION COMPLETED PLAN REACTOR 1 REPLACEMENT VALVE Installed New Valve. 4/4/2021 2-20-027 COOLANT ESSENTIAL Thermowell not replaced.
3 REPAIR THERMOWELL 10/23/2020 2-20-030 COOLING WATER Welding repair performed.
ESSENTIAL 3 REPLACEMENT PIPE & FLANGE Spool replaced. 10/21/2020 2-20-031 COOLING WATER ESSENTIAL 3 REPLACEMENT THERMOWELL Thermowell replaced. 10/21/2020 2-20-032 COOLING WATER ESSENTIAL Removed flange from 3 REPAIR FLANGE 2/9/2021 2-20-035 COOLING WATER damaged spool.
ESSENTIAL Replaced valve with blind 3 REPLACEMENT VALVE 2/27/2021 2-20-036 COOLING WATER flange.
ESSENTIAL Replaced valve with blind 3 REPLACEMENT VALVE 2/27/2021 2-20-037 COOLING WATER flange.
ESSENTIAL Replaced valve with pipe 3 REPLACEMENT VALVE 2/27/2021 2-20-038 COOLING WATER spool.
ESSENTIAL 3 REPLACEMENT PIPE Replaced piping spool. 2/27/2021 2-20-039 COOLING WATER ESSENTIAL Replaced tee with straight 3 REPLACEMENT PIPE 2/27/2021 2-20-040 COOLING WATER piping.
ESSENTIAL 3 REPLACEMENT PIPE Piping Spool Replaced. 1/29/2021 2-20-041 COOLING WATER ESSENTIAL 3 REPLACEMENT FLANGE Replaced Flange. 2/27/2021 2-20-042 COOLING WATER CHEMICAL 3 REPLACEMENT TRANSMITTER Replaced transmitter. 12/6/2020 2-20-043 VOLUME CONTROL 3 REPLACEMENT VALVE DIESEL OIL Replaced valve. 1/29/2021 2-20-044 ESSENTIAL 3 REPLACEMENT VALVE Replaced valve. 2/22/2021 2-20-045 COOLING WATER ESSENTIAL 3 REPLACEMENT VALVE Replaced valve. 2/27/2021 2-20-046 COOLING WATER
TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE CORRECTIVE ITEM DATE REPAIR / REPLACMENT CLASS SYSTEM DESCRIPTION OF WORK MEASURE DESCRIPTION COMPLETED PLAN ESSENTIAL 3 REPLACEMENT VALVE Replaced valve. 2/27/2021 2-20-047 COOLING WATER ESSENTIAL Replaced spools, flanges, 3 REPLACEMENT PIPE & FLANGE 2/27/2021 2-21-002 COOLING WATER and fasteners.
ESSENTIAL Valve replaced with piping 3 REPLACEMENT VALVE 2/27/2021 2-21-003 COOLING WATER spool.
ESSENTIAL 3 REPLACEMENT VALVE Replace valve. 2/27/2021 2-21-005 COOLING WATER ESSENTIAL 3 REPLACEMENT PIPE Replaced piping spool. 2/27/2021 2-21-006 COOLING WATER ESSENTIAL 3 REPLACEMENT PIPE Replaced piping spool. 2/27/2021 2-21-007 COOLING WATER ESSENTIAL Replaced Valve Seat.
3 REPLACEMENT VALVE 2/11/2021 2-21-010 COOLING WATER Machined Valve Plates.
ESSENTIAL 3 REPLACEMENT VALVE Replaced valve. 01/27/2021. 2-21-011 COOLING WATER Spring Can Support 3 REPAIR SPRING CAN FEEDWATER 4/9/2021 2-21-014 adjustment.
Feed Water 3 REPAIR SNUBBER FEEDWATER 4/9/2021 2-21-015 Support/Snubber removed.
TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE CORRECTIVE ITEM DATE REPAIR/REPLACMENT CLASS SYSTEM DESCRIPTION OF WORK MEASURE DESCRIPTION COMPLETED PLAN COMPONENT Replaced valve with new 2 REPLACEMENT VALVE 3/11/2021 2-21-017 COOLING one.
REACTOR 1 REPLACEMENT SNUBBER Replaced Snubber. 4/7/2021 2-21-022 COOLANT 2 REPLACEMENT SNUBBER MAIN STEAM Replaced Snubber. 4/10/2021 2-21-023 2 REPLACEMENT CONTAINMENT VALVE Replaced valve seat. 4/11/2021 2-21-024 HVAC