ML23229A526 | 17 August 2023 | Inservice Inspection Summary Report - 1 RE24, | |
ML23221A300 | 9 August 2023 | RE22 Inspection Summary Report for Steam Generator Tubinq, Rev. 1 (Epld L-2023-LRO-0029) | |
ML23044A619 | 13 February 2023 | Summary Report for Inservice Inspection (2RE22) Completed in November 2022 | Moisture barrier |
ML22033A544 | 2 February 2022 | Inservice Inspection Summary Report -1RE23 | |
NOC-AE-21003819, Inservice Inspection Summary Report - 2RE21 | 15 July 2021 | Inservice Inspection Summary Report - 2RE21 | |
ML21196A492 | 15 July 2021 | Inservice Inspection Summary Report - 2RE21 | |
NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval | 20 May 2021 | Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval | Safe Shutdown Boric Acid Non-Destructive Examination Weld Overlay Coatings Nondestructive Examination VT-2 Incorporated by reference Aging Management Abnormal operational transient Surveillance Frequency Control Program Moisture barrier License Renewal Control of Heavy Loads EVT-1 Pressure Boundary Leakage Dissimilar Metal Weld Operability Assessment |
ML21144A109 | 20 May 2021 | Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval | Safe Shutdown Boric Acid Non-Destructive Examination Weld Overlay Coatings Nondestructive Examination VT-2 Incorporated by reference Aging Management Abnormal operational transient Surveillance Frequency Control Program Moisture barrier License Renewal Control of Heavy Loads EVT-1 Pressure Boundary Leakage Dissimilar Metal Weld Operability Assessment |
NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval | 28 October 2020 | Inservice Testing Program Description for the Fourth Ten-Year Interval | Safe Shutdown Boric Acid Ultimate heat sink Stroke time Water Inventory Control Incorporated by reference Abnormal operational transient Cold shutdown justification Power-Operated Valves Power Operated Valves |
ML20303A260 | 28 October 2020 | Inservice Testing Program Description for the Fourth Ten-Year Interval | Safe Shutdown Boric Acid Ultimate heat sink Stroke time Water Inventory Control Incorporated by reference Abnormal operational transient Cold shutdown justification Power-Operated Valves Power Operated Valves |
NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing | 7 October 2020 | 1 RE22 Inspection Summary Report for Steam Generator Tubing | |
ML20281A854 | 7 October 2020 | 1 RE22 Inspection Summary Report for Steam Generator Tubing | |
ML20191A270 | 9 July 2020 | Inservice Inspection Summary Report -1RE22 | |
NOC-AE-20003700, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01) | 22 January 2020 | Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01) | Safe Shutdown |
NOC-AE-20003703, Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-04) | 22 January 2020 | Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-04) | Safe Shutdown |
NOC-AE-19003696, Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096) | 26 November 2019 | Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096) | |
NOC-AE-19003620, Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23) | 28 February 2019 | Proposed Alternative for Extension of Volumetric Examination Interval for Reactor Vessel Closure Head with Alloy 690 Nozzles in Accordance with 10 CFR 50.55a(z)(1) (Relief Request RR-ENG-3-23) | Boric Acid Reactor Vessel Water Level VT-2 |
NOC-AE-19003624, Inservice Inspection Summary Report- 1RE21 | 7 February 2019 | Inservice Inspection Summary Report- 1RE21 | |
NOC-AE-18003603, Transmittal of 2RE19 Inspection Summary Report for Steam Generator Tubing | 18 October 2018 | Transmittal of 2RE19 Inspection Summary Report for Steam Generator Tubing | |
NOC-AE-18003587, Inservice Inspection Summary Report -2RE19 | 25 July 2018 | Inservice Inspection Summary Report -2RE19 | |
NOC-AE-17003503, Inservice Inspection Summary Report - 1 RE20 | 20 July 2017 | Inservice Inspection Summary Report - 1 RE20 | Boric Acid |
NOC-AE-17003440, Inservice Inspection Summary Report -2RE18 Completed in November 2016 | 8 February 2017 | Inservice Inspection Summary Report -2RE18 Completed in November 2016 | |
NOC-AE-16003364, 1RE19 Inspection Summary Report for Steam Generator Tubing | 25 April 2016 | 1RE19 Inspection Summary Report for Steam Generator Tubing | Non-Destructive Examination |
NOC-AE-16003355, Inservice Inspection Summary Report, 1RE19 | 24 March 2016 | Inservice Inspection Summary Report, 1RE19 | FLEX |
NOC-AE-15003282, Inservice Inspection Summary Report -2E17 | 6 August 2015 | Inservice Inspection Summary Report -2E17 | Boric Acid FLEX |
NOC-AE-14003170, Inservice Inspection Summary Report - 1 RE18 | 26 August 2014 | Inservice Inspection Summary Report - 1 RE18 | |
NOC-AE-14003139, RE16 Inspection Summary Report for Steam Generator Tubing | 22 May 2014 | RE16 Inspection Summary Report for Steam Generator Tubing | Non-Destructive Examination |
NOC-AE-14003112, Inservice Inspection Summary Report - 2RE16 | 24 March 2014 | Inservice Inspection Summary Report - 2RE16 | |
NOC-AE-13002968, Inservice Inspection Summary Report - 1RE17 | 21 February 2013 | Inservice Inspection Summary Report - 1RE17 | Boric Acid |
NOC-AE-12002803, Inservice Inspection Summary Report - 2RE15 | 20 February 2012 | Inservice Inspection Summary Report - 2RE15 | |
NOC-AE-11002722, RE16 Inspection Summary Report for Steam Generator Tubing | 21 September 2011 | RE16 Inspection Summary Report for Steam Generator Tubing | Nondestructive Examination |
NOC-AE-11002706, Inservice Inspection Summary Report - 1RE16 | 28 July 2011 | Inservice Inspection Summary Report - 1RE16 | Through Wall Leak |
NOC-AE-11002651, Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval | 14 March 2011 | Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval | Safe Shutdown Incorporated by reference Abnormal operational transient |
NOC-AE-10002585, Inservice Inspection Summary Report - 2RE14 | 2 August 2010 | Inservice Inspection Summary Report - 2RE14 | |
NOC-AE-10002577, Notification of Upgrading of the Inservice Inspection Program for the Third Inspection Interval | 29 July 2010 | Notification of Upgrading of the Inservice Inspection Program for the Third Inspection Interval | Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference |
NOC-AE-10002565, Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval | 13 July 2010 | Inservice Testing Program Description: Safety-Related Seismic Restraints (Snubbers) for the Third 10-Year Interval | |
NOC-AE-11002684, Categorization of Risk-Informed Piping | 20 June 2010 | Categorization of Risk-Informed Piping | |
ML100640120 | 22 February 2010 | Inservice Testing Program Description for the Third 10-Year Interval | Safe Shutdown Boric Acid Ultimate heat sink Stroke time Water Inventory Control Abnormal operational transient Large early release frequency Cold shutdown justification Power-Operated Valves Power Operated Valves |
NOC-AE-10002522, Inservice Inspection Summary Report - 1RE15 | 16 February 2010 | Inservice Inspection Summary Report - 1RE15 | |
NOC-AE-09002408, Transmittal of 2RE13 Inspection Summary Report for Steam Generator Tubing | 24 March 2009 | Transmittal of 2RE13 Inspection Summary Report for Steam Generator Tubing | |
NOC-AE-09002381, Inservice Inspection Summary Report - 2RE13 | 20 January 2009 | Inservice Inspection Summary Report - 2RE13 | |
NOC-AE-08002318, Inservice Inspection Summary Report - 1RE14 | 23 June 2008 | Inservice Inspection Summary Report - 1RE14 | Weld Overlay |
NOC-AE-07002195, Inservice Inspection Summary Report - 2RE12 | 25 July 2007 | Inservice Inspection Summary Report - 2RE12 | Weld Overlay |
NOC-AE-07002143, 1RE13 Inservice Inspection Summary Report for Steam Generator Tubing | 16 April 2007 | 1RE13 Inservice Inspection Summary Report for Steam Generator Tubing | |
ML070160201 | 8 January 2007 | Inservice Inspection Summary Report - IRE13 | Weld Overlay |
NOC-AE-06001960, Inservice Inspection Summary Report | 19 January 2006 | Inservice Inspection Summary Report | |
NOC-AE-05001938, Refueling Outage Inservice Inspection Results for Steam Generator Tubing | 12 October 2005 | Refueling Outage Inservice Inspection Results for Steam Generator Tubing | |
NOC-AE-05001910, Inservice Inspection Summary Report - 1RE12 | 15 July 2005 | Inservice Inspection Summary Report - 1RE12 | |
NOC-AE-05001853, Revised Steam Generator Tube Inservice Inspection Plan for the Second Inspection Interval at Plant | 3 March 2005 | Revised Steam Generator Tube Inservice Inspection Plan for the Second Inspection Interval at Plant | Incorporated by reference |
NOC-AE-04001763, Inservice Inspection Summary Report for Welds and Component Supports - 2RE10 | 22 July 2004 | Inservice Inspection Summary Report for Welds and Component Supports - 2RE10 | |