MONTHYEARRS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report ML22019A2602022-01-11011 January 2022 Transmittal of 2021 Owner'S Activity Report for the R. E. Ginna Nuclear Power Plant ML21055A0202021-02-19019 February 2021 Transmittal of 2020 Owner'S Activity Report ML20036C5932020-02-0505 February 2020 R. E. Ginna Nuclear Power Plant - Submittal of the Program Plan for the Lnservice Testing (IST) Program for the Sixth 10-Year Interval ML19178A0132019-06-27027 June 2019 R. E. Ginna Nuclear Power Plant - Submittal of Relief Requests Associated with the Sixth Lnservice Inspection (ISI) Interval ML19025A0802019-01-18018 January 2019 Transmittal of 2018 Owner'S Activity Report ML18347B0362018-12-13013 December 2018 Relief Requests Associated with Sixth Ten-Year Lnservice Testing Interval ML16015A4352016-01-14014 January 2016 Transmittal of 2015 Owner'S Activity Report ML14232A2812014-08-12012 August 2014 Transmittal of 2014 Owner'S Activity Report for the R. E. Ginna Nuclear Power Plant ML13070A0512013-03-0606 March 2013 R. E. Ginna - Report of Facility Changes, Test, and Experiments Conducted Without Prior Commission Approval ML12285A3592012-10-0505 October 2012 R. E. Ginna Nuclear Power Plant - Response to Request for Additional Information Regarding Relief Request ISI-08 Examination of Reactor Pressure Vessel Upper Head Penetration Nozzles ML1211704812012-04-24024 April 2012 Plant, Fifth Interval Inservice Inspection Program Submittal of 10 CFR 50.55a Relief Request Number ISI-06 ML11255A1272011-08-30030 August 2011 Transmittal of 2011 Owner'S Activity Report for the R. E. Ginna Nuclear Power Plant ML11215A0122011-07-29029 July 2011 Response to Request for Additional Information Fourth Interval Inservice Inspection Program Relief Requests Nos. ISI-02 and ISI-03 ML1036201052010-12-16016 December 2010 CFR 50.55a Request ISI-02 and ISI-03: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR50.55a(g)(5)(iii) for the Fourth Interval Inservice Inspection (ISI) Program ML1000500342009-12-30030 December 2009 Fifth Ten-Year Inservice Inspection Plan and Request for Approval of Alternative (Relief Request) to American Society of Mechanical Engineers Code, Section XI ML0934910012009-12-10010 December 2009 R. E. Ginna - Transmittal of 2009 Owner'S Activity Report for the Refueling Outage Conducted ML0931400912009-11-0505 November 2009 R. E. Ginna Nuclear Power Plant, Withdrawal of Relief Request VR-03 from the Fifth Ten-Year Inservice Test Program for Safety-Related Pumps and Valves ML0927500852009-09-28028 September 2009 R. E. Ginna Nuclear Power Plant - Withdrawal of License Amendment Request: Reporting of Reactor Vessel In-Service Inspection Information and Analysis in Support of Code Relief Request for Extension of Reactor Vessel In-Service Inspection In ML0926104352009-09-11011 September 2009 R. E. Ginna - Fifth Ten-Year Inservice Test Program for Safety-Related Pumps and Valves ML0915302482009-05-22022 May 2009 Submittal of Fourth Interval Inservice Inspection Program, 10 CFR 50.55a Request Number 24 ML0822702092008-08-0606 August 2008 Transmittal of 2008 Owners Activity Report for the Refueling Outage Conducted in 2008 ML0814007222008-05-10010 May 2008 Fourth Ten-Year Interval Inservice Inspection Program, Submittal of Relief Request Numbers 18, 19, 20, and 21 ML0920907892008-01-0404 January 2008 Fourth Interval Inservice Inspection (ISI) Program, Rev. 7 ML0703802612007-01-30030 January 2007 R. E. Ginna Nuclear - Transmittal of Inservice Inspection Report for the Fourth Interval (2000-2009), Second Period, Third Outage (2006) - ISI and First Interval (1997-2008), Third Period, First Outage (2006) - Iwe/Iwl ML0519301152005-07-0101 July 2005 Transmittal of Inservice Inspection Report for the Fourth Interval (2000-2009), Second Period, Second Outage (2005) - ISI and First Interval (1997-2008), Second Period, Third Outage (2005) - Iwe/Iwl ML0510902552005-04-14014 April 2005 Supplemental Information Regarding Outage 2003 Inservice Inspection Report R.E. Ginna Nuclear Power Plant ML0402201852004-01-13013 January 2004 Transmittal of Inservice Inspection Report for the Fourth Interval (2000-2009), Second Period, First Outage (2003) - ISI and First Interval (1997-2008), Second Period, Second Outage (2003) - Iwe/Iwl R.E. Ginna Nuclear Power Plant ML0322603382003-08-0808 August 2003 Submittal of Relief Request VR-8 Related to Requirements of 10CFR50.55a(f), Inservice Testing Requirements. ML0301404022003-01-0909 January 2003 Inservice Testing Program Relief Request PR-2 ML0219602572002-07-0909 July 2002 Inservice Inspection Report for Fourth Interval (2000-2009), First Period, Second Outage (2002) - ISI & First Interval (1997-2008), Second Period, First Outage (2002) Iwe/Iwl 2023-08-23
[Table view] Category:Letter
MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] |
Text
Paul M. Swift Site Vice President R E. Ginna Nuclear Power Exelon Generation ~ Plant 1503 Lake Rd Ontario. NY 14519 315 7915200 Office www exeloncorp.com paul.sw1ft<aexeloncorp.com January 11 , 2022 U.S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington , DC 20555-0001 RE. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244
Subject:
Transmittal of 2021 Owner's Activity Report for the R. E. Ginna Nuclear Power Plant Enclosed is a copy of the R. E. Ginna Nuclear Power Plant Owner's Activity Report for the refueling outage conducted in 2021 . This report is submitted as specified by ASME Code Section XI .
There are no regulatory commitments contained in this letter.
If you have any questions, please contact Chris Bradshaw at (315) 791-3246.
Respectfully,
~*~~~
Paul M. Swift Attachment 1: SIXTH INSERVICE INSPECTION (ISi) INTERVAL and THIRD CONTAINMENT INSPECTION INTERVAL (CISI), FIRST INSPECTION PERIOD (ISi AND CISI); 2021 OWNER'S ACTIVITY REPORT FOR RF0-43 INSERVICE EXAMINATIONS (October 4, 2021 through October 23, 2021) cc: NRC Regional Administrator, Region 1 NRC Project Manager, Ginna NRC Resident Inspector, Ginna
ATTACHMENT 1 SIXTH INSERVICE INSPECTION (ISi) INTERVAL AND THIRD CONTAINMENT INSPECTION INTERVAL (CISI),
FIRST INSPECTION PERIOD (ISi AND CISI );
2021 OWNER'S ACTIVITY REPORT FOR RF0-43 INSERVICE EXAMINATIONS (October 4, 2021 through October 23, 2021)
R.E. Ginna Nuclear Power Plant, LLC January 11 , 202 1
FORM OAR-1 OWNER'S ACTIVITY REPORT Plant R.E. Ginna Nuclear Power Plant, 1503 Lake Road , Ontario New York 14519 Unit No. N/A Commercial Service Date June 1, 1970 Refueling Outage Number G1R43 (if applicable)
Current Inspection Interval Sixth Inspection Interval (ISi), Third Inspection Interval (CISI), [Starting January 1, 2020]
(1", 2°*, 3**, 4'", other)
Current Inspection Period _F_ ir..:..
st.:..l;....n..:..
s"'-pe.:..c:..:t....:io'-n-'p'"-'e:.;.r....:io....:d;....:(..:..IS=-l'--'a:.c.n. . :dc.. .C.=-.:. .S:..;.
- 1 1,_)""'[S:. . :t;:.;.art:. . :i"'n.,_g.. .:J. . :a"'n. :. u. :.:.a:. .1.r_
y 1"'-'....:2:..:0:..::2:..::0..._
]- - - - - - - - -- - - - --
(1" , 2"'. 3)
Edition and Addenda of Section XI app licable to the inspection plans ASME Section XI 2013 Edition {61h Interval)
Date and Revision of inspection plans August 11 , 2021 , Rev. 1 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Same as above Code Cases used for inspection and eva luation : N-532-5, N-706, N-716-1, N-722-1, N-729-6, N-731 , N-770-2 (if applicable, including cases modified by Case N-532 and later revisions)
CERTIFICATE OF CONFO RMANCE I certify that (a) the statements made in this report are correct; (b) the exam inations and tests meet the Inspection Plan as required by the ASME Code ,Section X I; and (c) the repair/replacement activities and eval uations supporting the completion of G1R43 conform to the requirements of Section X I. (refueling outage number)
Signed Kayla lazzetta, GIN ISi Program Owner Date (Owner or Owner's designee. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a va lid commission issued by the National Board of Boiler and Pressure Vessel In spectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evalua ion described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any perso nal/jury or prop y damage or a loss of any kind arising from or connected ~ith this inspection.
Bruce Sawyer ~ ~ Commissions &;{J /0 496 /(,) 1 (Inspector's Signal ) (National Board Number and Endorsement)
Date I //9 I ~e>Z- 'Z....
Page 1 of 3
TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Examination Item Item Description Evaluation Description Category Number IR 04451724 UT indications identified on Was evaluated and found acceptable by 8-8 82.11 Pressurizer Lower Shell-to-Lower ESR-21-0200 . Evaluated and found to Head Circ Weld , C-3. require no additional ASME Section XI examinations by ESR-21-0216.
Degradation of RHE-8-PR1 and IR 04451306 F-A F1 .40 RHE-2-PR1 identified during NOE Was evaluated and found acceptable by VT-3 examinations of supports. ESR-21-0193 Page 2 of 3
TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Date Repair/Replacement Class Description Of Work Completed Plan Number Temporary leak repair via like for like EAC02B , Residual replacement and installation of studs and Heat Removal GORR 43-024 2 leak injection washers. Contingency 05/04/2021 Heat Exchanger WO# C93783989 sealant injection mentioned in R/R plan
'B' not used.
Page 3 of 3