ML21111A283

From kanterella
Revision as of 15:45, 19 January 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Correction: Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action Re Proposed ISFSI-Only Security, Training and Qualification, Safeguards Contingency Plan
ML21111A283
Person / Time
Site: Pilgrim
Issue date: 04/21/2021
From: Amy Snyder
Reactor Decommissioning Branch
To: Sterdis A
Holtec Decommissioning International
Snyder A
References
EPID L-2021-LLL-0008
Download: ML21111A283 (3)


Text

April 21, 2021 Andrea L. Sterdis Vice President Regulatory and Environmental Affairs Holtec Decommissioning International, LLC Krishna P. Singh Technology Campus 1 Holtec Blvd.

Camden, NJ 08104

SUBJECT:

CORRECTION: PILGRIM NUCLEAR POWER STATION - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: PROPOSED INDEPENDENT SPENT FUEL STORAGE INSTALLATION - ONLY SECURITY, TRAINING AND QUALIFICATION, SAFEGUARDS CONTINGENCY PLAN (EPID L-2021-LLL-0008)

Dear Ms. Sterdis:

By letter dated April 20, 2021 (Agencywide Documents Access and Management System Accession [ADAMS] No. ML21104A160), the U.S. Nuclear Regulatory Commission (NRC) accepted the Holtec Decommissioning International, LLC license amendment request for review and approval of proposed changes to the Pilgrim Independent Spent Fuel Storage Installation (ISFSI)-Only Security, Training and Qualification, and Safeguards Contingency Plan, Rev. 0. In our acceptance review letter, the publication date for the Federal Register Notice and the closing date for the opportunity for hearing was incorrectly stated. In our April 20, 2021 letter, it was stated that:

The acceptance of the application for detailed technical review and the draft no significant hazards determination is scheduled to be published in the Federal Register on May 18, 2021, with a 60-day hearing request period ending July 19, 2021.

Because the application contains Sensitive Unclassified Non-Classified Information, the Federal Register Noticing process is different. The information that applies to this application is as follows:

The acceptance of the application for detailed technical review and the draft no significant hazards determination is scheduled to be published in the Federal Register on June 1, 2021, with a 60-day hearing period ending August 2, 2021.

In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure,"

a copy of this letter will be available electronically for public inspection in the NRC Public

A. Sterdis 2 Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

If you have any questions, please contact me at (301) 415-6822.

Sincerely, Signed by Snyder, Amy on 04/21/21 Amy M. Snyder, Senior Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards Docket Nos. 50-293 and 72-1044 cc: Pilgrim Listserv Pierre Paul Oneid Senior Vice President and Chief Nuclear Officer Holtec International Krishna P. Singh Technology Campus 1 Holtec Blvd.

Camden, NJ 08104 Ms. Pamela B. Cowan Senior Vice President and Chief Operating Officer Holtec Decommissioning International, LLC Krishna P. Singh Technology Campus 1 Holtec Blvd.

Camden, NJ 08104

Ltr ML21111A283 OFFICE NMSS/DUWP/RDB NMSS/DUWP/RDB NMSS/DUWP/RDB NAME ASnyder AS BWatson BW ASnyder AS DATE Apr 21, 2021 Apr 21, 2021 Apr 21, 2021