ML20155F690

From kanterella
Revision as of 20:32, 9 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amends to Licenses DPR-77 & DPR-79, Consisting of Tech Specs 88-04,incoporating Provisions of Generic Ltr 84-15, Proposed Staff Actions to Improve & Maintain Diesel Generator Reliability. Fee Paid
ML20155F690
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/13/1988
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20155F692 List:
References
GL-84-15, TAC-R00367, TAC-R00368, TAC-R367, TAC-R368, NUDOCS 8806170016
Download: ML20155F690 (3)


Text

-____

TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 SN 157B Lookout Place

'JUN 131988 TVA-SQN-TS-88-04 10 CFR 50.90 U.S. Nuclear Regulatory Commission h ATTN: Document Control Desk Hashington, D.C. 20555 3 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION CHANGE 88-04 In accordance with 10 CFR 50.90, we are enclosing a requested amendment to licenses OPR-77 and DPR-79 to change the technical specifications of SON units 1 and 2. The proposed change implements a recommendation contained in Generic Letter (GL) 84-15, "Proposed Staff Actions to Improve and Maintain Diesel Generator Reliability." TVA requested an amendment to change SQN's units 1 and 2 technical specifications to incor.wrate the provisions of l GL 84-15 by letter dated February 1, 1985, folio sd by a supplemental I August 8, 1986 letter. NRC granted approval of TVA's proposed change to SQN's I technical specifications by a February 3, 1987 letter (Amendment No. 52 to

( Facility Operating License No. DPR-77 and Amendment No. 44 to Facility l Operating License No. OPR-79). Because of the complexity and nature of the l

changes involved in the February 1985 and August 1986 letters, TVA failed to

! include one of the provisions of GL 84-15 regarding the reduction of diesel generator fast starts. TVA requests that NRC review the proposed amendment to SQN's technical specifications to allow SQN to reflect the missed provision of the GL.

Tne proposed technical specification change is identif4d in enclosure 1. The justification for the proposed technic 01 specification change is provided in enclosure 2. A proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in enclosure 3.

Enclosed is a check for the $150 amendment application fee required by 10 CFR 170.12.

p/

'/

lckecl<W#

O'06170016 DR 880613 ADOCK 05000327 p

.DCD An Equal opportunity Employer h- C3M{

i

U.S. Nuclear Regulatory Commission 'Jl N f 31988 Please direct questions you may have concerning this issue to D. V. Goodin at (615) 870-7734.

Very truly yours, TEN SSEE LEY AUTHORITY R. Gridley, trector Nuclear Licensing and Regulatory Affairs Sworn'Apgsubscribedstobeforeme da of M , 1988 this /O m

n Expires -

Enclosures cc (Enclosures):

Mr. Michael H. Hobley, Director (w/o. enclosures)

Division of Radiological Health T.E.R.R.A. Building 150 9th Avenue, N '

Nashville, Tennessee 37203 Mr. K. P. Barr, Acting Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Cunmission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgea 30323 Ms. S. C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commissicn One White Filnt, North 11555 Rockville Pike Rockville, Maryland 20852 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379

-s , ,

3 i

ENCLOSURE 1

. PROPOSED. TECHNICAL SPECIFICATION CHANGE SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 DOCKET NOS. 50-327 AND 50-328 y (TVA-SQN-TS-88-04) d LIST OF AFFECTED PAGES Unit 1 3/4 8-1 3/4 8-2 Unit 2 3/4 8-1 3/4 8-2

-% .