ML17090A511
From kanterella
Revision as of 16:13, 24 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Letter Sequence Request | |
---|---|
MONTHYEARNRC 2017-0017, License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances2017-03-31031 March 2017
[Table View]License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances Project stage: Request ML17202G5912017-07-25025 July 2017 Audit Plan and Setup of Online Reference Portal for License Amendment Request - Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances Project stage: Other NRC 2017-0039, Construction Truss License Amendment Request Audit Plan2017-08-10010 August 2017 Construction Truss License Amendment Request Audit Plan Project stage: Request ML17307A0402017-10-30030 October 2017 E-mail Draft Request for Additional Information for Containment Dome Truss LAR - Point Beach Nuclear Plant, Units 1 and 2 (CAC Nos. MF9532 and MF9533; EPID L-2017-LLA-0209) Project stage: Draft RAI ML17319A2272017-11-17017 November 2017 Audit Plan for License Amendment Request to Resolve Non-Conformances Relating to Containment Dome Truss Project stage: Other ML17346A9122017-12-22022 December 2017 Summary of November 14, 2017 Public Teleconference with NextEra Energy Point Beach, LLC, to Discuss Containment Dome Truss License Amendment Request for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (CAC Nos. MF9532 and MF9533; EPID L-2017-L Project stage: Meeting ML18025C0432018-01-31031 January 2018 Request for Additional Information Regarding License Amendment Request to Resolve Nonconformances Relating to Containment Dome Truss Project stage: RAI ML18038A7852018-03-0606 March 2018 Summary Report for NRC Audit for Point Beach Nuclear Plant, Units 1 and 2, License Amendment Request to Resolve Nonconformance Relating to Containment Dome Truss Project stage: Other NRC 2018-0014, NextEra Energy Point Beach, LLC, Construction Truss License Amendment Request 278, Response to Request for Additional Information2018-04-12012 April 2018 NextEra Energy Point Beach, LLC, Construction Truss License Amendment Request 278, Response to Request for Additional Information Project stage: Response to RAI NRC 2018-0001, Transmittal of Construction Truss License Amendment Request Document2018-04-12012 April 2018 Transmittal of Construction Truss License Amendment Request Document Project stage: Request NRC 2018-0030, Construction Truss License Amendment Request 278 Draft Updated Final Safety Analysis Report (UFSAR) Revision2018-05-29029 May 2018 Construction Truss License Amendment Request 278 Draft Updated Final Safety Analysis Report (UFSAR) Revision Project stage: Draft Request ML18179A4032018-06-29029 June 2018 Public Meeting Discussion Points Project stage: Meeting ML18213A3912018-07-12012 July 2018 Public Meeting Project stage: Request ML18214A1532018-08-0101 August 2018 NRR E-mail Capture - Final - Second Round RAIs - Point Beach Nuclear Plant, Units 1 and 2 - License Amendment Request to Resolve Non-conformances Relating to Containment Dome Truss - EPID L-2017-LLA-0209 Project stage: RAI ML18220B0192018-08-13013 August 2018 7/12/2018 Summary of Meeting with NextEra Energy Point Beach, Llc. to Discuss Supplemental Response to the RAI for Containment Dome Truss License Amendment Request for Point Beach Nuclear Plant, Unit 1 and 2 (CAC Nos. MF9532 & MF9533; ... Project stage: RAI NRC 2019-0007, License Conditions and Implementation Items Required to Resolve Construction Truss Design Code Nonconformances2019-03-13013 March 2019 License Conditions and Implementation Items Required to Resolve Construction Truss Design Code Nonconformances Project stage: Request ML18345A1102019-03-26026 March 2019 Redacted Version, Issuance of Amendment Nos. 263 and 266 for Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances Project stage: Approval 2018-03-06 |
ML17090A511 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 03/31/2017 |
Revision: | 0 |
From: | Coffey R Point Beach |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
NRC 2017-0017, PBN-BFJR-17-019 | |
Download: ML17090A511 (151) | |
Similar Documents at Point Beach | |
---|---|
Category:Letter
MONTHYEARML24295A1142024-10-31031 October 2024
[Table view]Suppl Env Audit Summary Letter W/Enclosure 1 ML24295A0862024-10-21021 October 2024 Notification of NRC Baseline Inspection and Request for Information Inspection Report 0500026/2025002 L-2024-160, Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41)2024-10-21021 October 2024 Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41) L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-120, LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization2024-10-0808 October 2024 LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000266/2024011 and 05000301/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-145, Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency2024-09-0909 September 2024 Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency ML24207A0202024-08-28028 August 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Point Beach Nuclear Plant, Units 1 and 2 (Docket Numbers: 50-0266 and 50-0301) IR 05000266/20240052024-08-21021 August 2024 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2024005 and 05000301/2024005) IR 05000266/20240022024-08-13013 August 2024 Integrated Inspection Report 05000266/2024002 and 05000301/2024002 L-2024-131, Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-08-0909 August 2024 Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24214A3092024-08-0202 August 2024 Confirmation of Initial License Examination L-2024-113, License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections2024-07-24024 July 2024 License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections ML24194A1802024-07-24024 July 2024 – Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20244012024-07-23023 July 2024 Public - Point Beach Nuclear Plant Cyber Security Inspection Report 05000266/2024401 and 05000301/2024401 ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal IR 05000266/20240102024-07-10010 July 2024 Age-Related Degradation Inspection Report 05000266/2024010 and 05000301/2024010 L-2024-105, License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-06-26026 June 2024 License Amendment Request 300, Modify Containment Average Air Temperature Requirements L-2024-107, Schedule for Subsequent License Renewal Environmental Review2024-06-25025 June 2024 Schedule for Subsequent License Renewal Environmental Review ML24176A2242024-06-24024 June 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-093, Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision2024-06-10010 June 2024 Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision IR 05000266/20244202024-06-0505 June 2024 Security Baseline Inspection Report 05000266/2024420 and 05000301/2024420 ML24149A1922024-05-28028 May 2024 Notification of NRC Baseline Inspection and Request for Information ML24141A1382024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection.Docx ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000266/2024301; 05000301/2024301 L-2024-067, Annual Monitoring Report2024-04-26026 April 2024 Annual Monitoring Report ML24116A0402024-04-23023 April 2024 Periodic Update of the Updated Final Safety Analysis Report ML24071A0912024-04-22022 April 2024 Issuance of Relief Request I6-RR-03 - Extension of the Unit 2 Steam Generator Primary Nozzle Dissimilar Metal Welds Sixth 10-Year Inservice Inspection Program Interval IR 05000266/20240012024-04-11011 April 2024 Integrated Inspection Report 05000266/2024001 and 05000301/2024001 L-2024-030, Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-03-27027 March 2024 Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-043, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-03-25025 March 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications IR 05000266/20230062024-02-28028 February 2024 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2023006 and 05000301/2023006) L-2024-020, Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections2024-02-22022 February 2024 Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 ML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24005A3242024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0040 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 2024-09-09 Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50 MONTHYEARL-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024
[Table view]Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-113, License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections2024-07-24024 July 2024 License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections L-2024-105, License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-06-26026 June 2024 License Amendment Request 300, Modify Containment Average Air Temperature Requirements L-2024-093, Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision2024-06-10010 June 2024 Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program2023-09-19019 September 2023 License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program L-2022-177, Subsequent License Renewal Application - Second Annual Update2022-11-28028 November 2022 Subsequent License Renewal Application - Second Annual Update L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System2022-09-26026 September 2022 License Amendment Request 295, Beacon Power Distribution Monitoring System ML22193A1142022-09-12012 September 2022 Issuance of Amendment Nos. 270 and 272 Elimination of the Requirements to Maintain the Post-Accident Sampling System L-2021-221, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 10 Responses Supplement 12021-11-19019 November 2021 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 10 Responses Supplement 1 L-2021-147, Subsequent License Renewal Application - Aging Management Supplement 3 Revision 12021-07-26026 July 2021 Subsequent License Renewal Application - Aging Management Supplement 3 Revision 1 L-2021-129, Ssubsequent License Renewal Application: Aging Management Requests for Confirmation Of/Additional Information (Rci/Rai) Set 1 Responses2021-07-0808 July 2021 Ssubsequent License Renewal Application: Aging Management Requests for Confirmation Of/Additional Information (Rci/Rai) Set 1 Responses L-2021-113, Subsequent License Renewal Application - Aging Management Supplement 32021-05-27027 May 2021 Subsequent License Renewal Application - Aging Management Supplement 3 NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary ML20329A2642020-11-16016 November 2020 Enclosure 4, Non-proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version) ML20329A2142020-11-16016 November 2020 Enclosure 1, Point Beach Nuclear Plant Units 1 and 2 Subsequent License Renewal Application Enclosures Summary ML20329A2192020-11-16016 November 2020 Enclosure 2, Affidavits Supporting Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 ML20329A2482020-11-16016 November 2020 Enclosure 3, Attachment 2, Appendix E Applicant'S Environmental Report Subsequent Operating License Renewal Point Beach Nuclear Plant Units 1 and 2 NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses2020-11-16016 November 2020 Application for Subsequent Renewed Facility Operating Licenses NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-08-13013 August 2020 License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis2020-02-0606 February 2020 License Amendment Request 289: Tornado Missile Protection Licensing Basis NRC 2018-0028, NextEra Energy Point Beach, LLC (NextEra) - License Amendment Request 290, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2018-07-30030 July 2018 NextEra Energy Point Beach, LLC (NextEra) - License Amendment Request 290, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements NRC 2018-0001, Transmittal of Construction Truss License Amendment Request Document2018-04-12012 April 2018 Transmittal of Construction Truss License Amendment Request Document NRC 2018-0018, License Amendment Request 288, Request to Extend Containment Leakage Rate Test Frequency2018-03-30030 March 2018 License Amendment Request 288, Request to Extend Containment Leakage Rate Test Frequency NRC 2017-0043, License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear Power Plants2017-08-31031 August 2017 License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear Power Plants NRC 2017-0028, License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.2017-06-23023 June 2017 License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. NRC 2017-0017, License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances2017-03-31031 March 2017 License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances NRC 2016-0030, License Amendment Request for H: Alternate Repair Criteria for Steam Generator Tube Sheet Expansion Region2016-07-29029 July 2016 License Amendment Request for H: Alternate Repair Criteria for Steam Generator Tube Sheet Expansion Region NRC-2016-0009, License Amendment Request 2821 Modify the Wording of Surveillance Requirement 3.4.12.7 Associated with the Power-operated Relief Valves2016-03-10010 March 2016 License Amendment Request 2821 Modify the Wording of Surveillance Requirement 3.4.12.7 Associated with the Power-operated Relief Valves NRC 2016-0002, License Amendment Request 280, Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program2016-02-12012 February 2016 License Amendment Request 280, Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program NRC 2015-0075, License Amendment Request 279, Elimination of Technical Specification 3.7.14, Primary Auxiliary Building Ventilation2016-01-15015 January 2016 License Amendment Request 279, Elimination of Technical Specification 3.7.14, Primary Auxiliary Building Ventilation NRC 2015-0004, LAR 266 to Revise Technical Specifications to Adopt TSTF-51 0, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process2015-03-27027 March 2015 LAR 266 to Revise Technical Specifications to Adopt TSTF-51 0, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process NRC 2014-0075, Supplement to License Amendment Request 273 Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Prog2014-12-0808 December 2014 Supplement to License Amendment Request 273 Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Prog NRC 2014-0003, License Amendment Request 273 Re Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program2014-07-0303 July 2014 License Amendment Request 273 Re Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program NRC-2014-0035, License Amendment Request (LAR) 275, Application to Revise Technical Specifications Task Force (TSTF) Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2014-07-0202 July 2014 License Amendment Request (LAR) 275, Application to Revise Technical Specifications Task Force (TSTF) Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process NRC 2013-0092, License Amendment Request 271 Supplement 1 Transition to 10 CFR 50.48(c)- NFPA 8052013-09-16016 September 2013 License Amendment Request 271 Supplement 1 Transition to 10 CFR 50.48(c)- NFPA 805 NRC 2013-0028, Point Beach Nuclear Plant, Units 1 and 2: License Amendment Request 271 - Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 22013-06-26026 June 2013 Point Beach Nuclear Plant, Units 1 and 2: License Amendment Request 271 - Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 2 of 3 ML13182A3502013-06-26026 June 2013 License Amendment Request 271 - Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 2 of 3 NRC 2013-0028, License Amendment Request 271 - Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 1 of 32013-06-26026 June 2013 License Amendment Request 271 - Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 1 of 3 NRC 2013-0051, License Amendment Request 272, Exemption Request - Optimized Zirlo Fuel Rod Cladding2013-06-0404 June 2013 License Amendment Request 272, Exemption Request - Optimized Zirlo Fuel Rod Cladding NRC 2013-0022, Supplement to License Amendment Request 252 Technical Specification 5.6.5, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2013-03-0101 March 2013 Supplement to License Amendment Request 252 Technical Specification 5.6.5, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) NRC 2013-0005, License Amendment Request 252, Technical Specification 5.6.5, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2013-01-15015 January 2013 License Amendment Request 252, Technical Specification 5.6.5, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) NRC 2012-0073, License Amendment Request 269, Revised License Pages Cyber Security Plan Implementation Schedule Milestone Change2012-09-17017 September 2012 License Amendment Request 269, Revised License Pages Cyber Security Plan Implementation Schedule Milestone Change NRC 2012-0065, License Amendment Request 270, Operations Manager Qualification Requirements2012-08-16016 August 2012 License Amendment Request 270, Operations Manager Qualification Requirements NRC 2012-0040, License Amendment Request 269, Cyber Security Plan Implementation Schedule Milestone Change2012-06-18018 June 2012 License Amendment Request 269, Cyber Security Plan Implementation Schedule Milestone Change NRC 2011-0066, License Amendment Request 254, Removal of the Table of Contents from Technical Specifications2011-06-23023 June 2011 License Amendment Request 254, Removal of the Table of Contents from Technical Specifications NRC 2010-0189, License Amendment Request 261, Extended Power Uprate Response to Request for Clarification2010-12-21021 December 2010 License Amendment Request 261, Extended Power Uprate Response to Request for Clarification NRC 2010-0154, License Amendment Request 261 - Extended Power Uprate - Response to Request for Additional Information2010-09-28028 September 2010 License Amendment Request 261 - Extended Power Uprate - Response to Request for Additional Information NRC 2010-0146, License Amendment Request 261, Extended Power Uprate, Withdrawal of Proposed Technical Specifications for Reactor Protection System and Engineered Safety Features Setpoints Not Associated with Extended Power Uprate2010-09-28028 September 2010 License Amendment Request 261, Extended Power Uprate, Withdrawal of Proposed Technical Specifications for Reactor Protection System and Engineered Safety Features Setpoints Not Associated with Extended Power Uprate 2024-09-25 Category:Probabilistic Risk Assessment MONTHYEARNRC 2017-0017, License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances2017-03-31031 March 2017
[Table view]License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances NRC 2013-0021, Request for Approval of Risk-Informed/Safety Based Inservice Inspection Alternative for Class 1 and 2 Piping in Accordance with 10 CFR 50.55a(a)(3)(i)2013-03-19019 March 2013 Request for Approval of Risk-Informed/Safety Based Inservice Inspection Alternative for Class 1 and 2 Piping in Accordance with 10 CFR 50.55a(a)(3)(i) ML0308707372002-09-10010 September 2002 PRA Update Project - Phase 2, Project Work Plan, Revision 0 2017-03-31 |
Retrieved from "https://kanterella.com/w/index.php?title=ML17090A511&oldid=334668"