Forwards SE of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs
ML20196J359
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/30/1999
From: Padovan L
NRC (Affiliation Not Assigned)
To: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20196J366 List:
References
TAC-M97325, TAC-M97326, NUDOCS 9907070248
Download: ML20196J359 (3)


Text

.q- -

June 30, 1999 Mr. D. N. Mor:y Vics Pr Ident - F:rlsy Projtet Southern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 35201-1295

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 - RE: APPROVAL TO USE WCAP-14750 AT FARLEY (TAC NOS. M97325 AND M97326)

Dear Mr. Morey:

Your November 26,1996, letter submitted Westinghouse Topical Report WCAP-14750, "RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop PWRs," for our review and approval. The report discusses using reactor coolant system (RCS) cold-leg elbow taps to measure RCS flow as an alternative to using precision heat balance measurements for this purpose.

Based on our review of the Westinghouse report and your responses to our requests for

. additional information, we conclude that WCAP-14750 is acceptable for you to reference in Farley, Units 1 and 2, licensing actions. Our Safety Evaluation is enclosed. We will address approving WCAP-14750 for all 3-loop pressurized water reactors in a separate correspondence to the Westinghouse Owner's Group. Please contact me if you have any questions.

Sincerely, Original signed by:

L. Mark Padovan, Profect Manager, Section 1 Project Directorate 11 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364

Enclosure:

Safety Evaluation I$- J cc w/ encl: See next page DISTRIBUTION:

  1. Oocket File a JZwolinski/SBlack PSkinner, Ril GHill(4)

PUBLIC ACRS HBerkow YHsii PDil-1 R/F OGC RScholl (e-mail SE only)

C' 99b7070248 990630 PDR P

ADOCK 05000348 f PDR DOCUMENT NAME: G:\PDii-1\Farley\M97325ltr.wpd To receive a copy of this document, Indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy *No ma or changes to SE OFFICE PDil-1/PM E PDil-1/LA h SRXB/BC / PDil-1/SC ,

gg NAME' MPadovan: CHawee [']M *SE REmch I DATE- 6/ M/99 6/M/99 4/99 6/2 4 /99 OFFICIAL RECORD COPY 070010'

,p3 K'0 09

[- . k UMTED STAT'S i g j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20551MX01 June 30, 1999

\*****/ 1 Mr. D. N. Morey Vice President - Farley Project Southern Nuclear Operating Company, Inc.

Post Office Box 1295 _

Birmingham, Alabama 35201-1295- l

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 RE: APPROVAL TO USE WCAP-14750 AT FARLEY (TAC NOS M97325 AND M97326)

Dear Mr. Morey:

Your November 26,1996, letter submitted Westinghouse Topical Report WCAP-14750, "RCS j Flow Verification Using Elbow Taps at Westinghouse 3-Loop PWRs," for our review and l

approval. The report discusses using reactor coolant system (RCS) cold-leg elbow taps to  ;

measure RCS flow as an alternative to using precision heat balance measurements for this '

purpose.

Based on our review of the Westinghouse report and your responses to our requests for  !

additional information, we conclude that WCAP-14750 is acceptable for you to reference in j Farley, Units 1 and 2, licensing actions. Our Safety Evaluation is enclosed. We will address approving WCAP-14750 for all 3-loop pressurized water reactors in a separate correspondence to the Westinghouse Owner's Group. Please contact me if you have any questions.

Sincerely, L. Mark Padovan, Project Manager, Section 1 Project Directorate ll Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364

Enclosure:

Safety Evaluation cc w/ encl: See next page -

l l

1 L

Joseph M. Farley Nuclear Plant '

cc:

- Mr. L. M. Stinson Rebecca V. Badham General Manager - SAER Supervisor Southern Nuclear Operating Company Southern Nuclear Operating Company l

Post Office Box 470 P. O. Box 470

' Ashford, Alabama 36312 - Ashford, Alabama 36312 Mr. Mark Ajiuni, Licensing Manager Southern Nuclear Operating Company Post Office Box 1295 Birmingham, Alabama 35201-1295 Mr. M. Stanford Blanton Balch and Bingham Law Firm

- Post Office Box 306 1710 Sixth Avenue North Birmingham, Alabama 35201 Mr. J. D. Woodard

- Executive Vice President

. Southern Nuclear Operating Company Post Office Box 1295

, Birmingham, Alabama 35201 State Health Officer Alabama Department of Public Health 434 Monroe Street Montgomery, Alabama 36130-1701 Chairman Houston County Commission Post Office Box 6406 Dothan, Alabama 36302 Resident inspector

._U.S. Nuclear Regulatory Commission >

7388 N. State Highway 95

- Columbia, Alabama 36319 I

L '