Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes
ML20211C365
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/17/1999
From: Gordon Peterson
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20211C370 List:
References
TAC-MA6285, TAC-MA6286, NUDOCS 9908250224
Download: ML20211C365 (8)


Text

--

.<  !~N' Duke Power i,

Catawba Nudrar Station U, "

4800 Concord Road i York, SC 29745

,

  • Gary R. Peterson # # # "

g , (803) 831-3426 Mx

(

I August 17, 1999

{

U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk '

Washington, D.C. 20555

Subject:

Duke Energy Corporation Catawba Nuclear Station Unit 1 and 2 Docket No.: 50-413, 414 Inservice Testing (IST) Program for Pumps and Valves - Manual Update TAC MA6285 and MA6286 Per the requirement of 10 CFR 50.55a(f) (5) (i) , Revision 25 of the Catawba Nuclear Station Inservice Testing (IST)

Program Manual is enclosed. The changes include a reformatting of the manual and additional changes as noted I in-the attached Summary of Changes. The enclosed manual  ;

will replace any previously transmitted revisions of the IST l Program. The following attachments are provided for this revision:

1. Summary of Changes  !
2. CNS ASME IST Program Revision 25  !

Please direct any questions concerning this change to Martha Purser at (803 31-4015.

Sinc re ,

iI l 4

G. R. Peterson )1 k(()k Attachment 99082b0$24'990817 PDR ADOCK 05000413 P PDR

[- -

L o U. S. Nuclcar Regulatory Commission August 17, 1999 Page 2 xc w/att: L. A. Reyes, Regional, Administrator

'USNRC,- Region II' P. S. Tam, Project Manager USNRC, ONRR D. J.. Roberts Senior Resident Inspector(CNS) l i

i i l l

L L. ..

\

SUMMARY

OF CHANGES l Catawba Nuclear Station l

l Unit 1 and Unit 2 I

/

Unit I and Unit 2 Pump and Valve Data Sheets have been refined and reformatted. These changes are reflected as Revision 25 and are listed below. The effective date for the changes as provided by this submittal is May 31,1999 j The general arrangement of the submittal has been changed to align with McGuire and Oconee Nuclear Stations.

GENERAL CHANGES SECTION ARRANGEMENT

=o Unit I and 2 of Pump Program and Unit I and 2 of Valve Program have been consolidated. New Section assignments are as follows:

SECTION CURRENT NEW Pump Inservice Testing Program - Unit 1 Section 3.1 Section 3.1 Pump Inservice Testing Program - Unit 2 Section 4.1 Section 3.1 Valve Inservice Testing Program - Unit 1 Section 3.2 Section 4.1 Valve Inservice Testing Program - Unit 2 Section 4.2 Section 4.1 All other section remain the same as follows:

Catawba Nuclear Station Program Document Section 1.0 Table of Abbreviations Section 2.0 Relief Reauest Section 5.0 Pumps - Generic Relief Request Section 5.1 Pumps - Specific Relief Request Section 5.2 Valses - Generic Relief Request Section 5.3 Valves - Specific Relief Request Section 5.4 Justification For Deferral Section 6.0 Valves - Justification for Deferral Section 6.1 Correspondence Section 7.0 PROGRAM DOCUMENT

=o New section has been added-Thermal Expansion Check Valves, Section 4.5.

=* All Technical Specification Numbers will be changed; therefore numbers have been deleted.

VALVE INSERVICE TESTING TABl.E

=o Several format changes have been made to align with " Guidelines for Inservice Testing at Nuclear Power Plant, NUREG 1482." Included is the addition of valve stroke time, test direction, abbreviation changes, and position indication.

=o Some additional stroke requirements with different test frequencies have been added for some valves. These were added to facilitate the use of other available procedures to stroke valves during other periods such as cold shutdown or refueling.

=o Valves previously listed as Test Requirement 'LJ' which receive NW injection, will be listed as 'LTNW' l

JUSTIFICATION FOR DEFERRAL l =o All Technical Specification Numbers will be changed; therefore numbers have been deleted.

=* All Valve Numbers have been modified to align with Valve Numbers on redesigned data sheets.

=o Additional test requirement information has been added to every Justification For Deferral.

I Page 1 of 6

SUMMARY

OF CHANGES Catawba Nuclear Station Unit 1 and Unit 2 SPECIFIC REVISIONS PUMPS- ADDED TO CATAWBA INSERVICE TESTING PROGRAM INVPU0001C Standby Makeup  ;

2NVPU0001C Standby Makeup

{

l l

PUMPS - CIIANGES TO PUMP DATA Change in Equipment ID - renumbered lYCPU0001 to OYCPU0001 Change in Equipment ID - renumbered lYCPU0002 to OYCPU0002 i

VALVES-DELETED FROM INSERVICE TESTING PROGRAM System Valves CA - Auxiliary Feedwater System 1(2)CA0171,1(2)CA0172 NW - Containment Penetration I NWOO53, INWOO83, INW0122, I NW0134, INWO146B RN - Nuclear Service Water 1(2)RN0430 VALVES- ADDED TO INSERVICE TESTING PROGRAM System Valves BB - Steam Generator Blowdown Recycle System 1 ( 2 ) B B 0052, 1 ( 2 )B B0053, 1(2 )B B 0054, 1 ( 2 )B B0055 CA - Auxiliary Feedwater System 1(2)CA0255,1(2)CA0256,1(2)CA0257,1(2)CA0291,1(2)CA0292 CF- Feedwater System 1 (2 )CF0028, 1 (2)CF0030, 1 (2 )CF0037, 1 ( 2 )CF0039, 1 (2 )CF0046, 1(2)CF0048,1(2)CF0055,1(2)CF0057 KC- Component Cooling System 1(2)KC0281,1(2)KC0322 ND - Residual lleat Removal System 1(2)ND0116,1(2)ND0117 NI- Safety injection System 1(2)N10052,1(2)N10063,1(2)N10074,1(2)N10086,1(2)N10485 NM -Nuclear Sampling System 1 (2 )N M 0426, 1 (2 )N M 0427, 1 ( 2 )NM0428, 1 (2 )N M 0429 NS - Containment Spray System 1(2)NS0002,1(2)NS0019 NV -Chemical & Volume Control System 1(2)NV0022,1(2)NV0033,1(2)NV0034,1(2)NV0046,1(2)NV0049, 1 ( 2 )N V0057, 1 (2 )NV0060, 1 ( 2 )N V0068, 1 (2 )N V0071, 1 ( 2 )N V0079, 1(2)NV0082,1(2)NV0492,1(2)NV0493,1(2)NV0494,1(2)NV0495,  !

1(2)NV0861,1(2)NV0878,1(2)NV0879,1(2)NV0880,1(2)NV0881 RN - Nuclear Service Water System 1(2)RN0030A,1(2)RN0040B SA-Main Steam to Aux Equipment 1(2)SA0001,1(2)SA0004  ;

VI-Instrument Air System 1(2)V10373,1(2)VIO374 8 I WL - Liquid Waste Recycle System 1(2)WLO894,1(2)WLA021,1(2)WLA024 1

i Page 2 of 6

SUMMARY

OF CHANGES Catawba Nuclear Station l Unit 1 and Unit 2 l

l VALVES - GENERIC RELIEF REOUEST - ADDED TO INSERVICE TESTING PROGRAM CN-GRV-01 Safety / Relief Valves Tested Under Ambient Conditions (remove 10 minute hold time)

CN-GRV-02 Safety / Relief Valves Tested At Other Than Ambient Conditions (reduce 10 minute hold to 5 minute hold)

CN-GRV-03 Safety / Relief Valves Tested Under Ambient Conditions (Thermal Equilibrium) l l

l VALVES -SPECIFIC RELIEF REOUEST - ADDED TO INSERVICE TESTING PROGR AM CN-SRV-FD-01 1(2) FD0034,1(2)FD0074 - Diesel Generator Fuel Oil Regulating Valve 1(2)VG0005,1(2)VG0006,1(2)VG0007,1(2)VG0008,1(2)VG0049, CN-SRV-VG-01 1(2)VG0050,1(2)VG0051,1(2)VG0052 - Diesel Generator Starting Air System JUSTIFICATION FOR I'EFERRAL - ADDED TO INSERVICE TESTING PROGRAM The following numbers have been added to the Catawba Inservice Testing Program:

JFD Number Valves CN-CA4)6 1(2)CA0291,1(2)CA0292 CN-CF4)2 1(2)CF0031, 1(2)CF0040, 1(2)CF0(M9, 1(2)CF0058 CN-CF4)3 2CF0166,2CFO167,2CFO168,2CF0169 CN-CF4)4 1(2)CF0028,1(2)CF0037,1(2)CF0046,1(2)CF0055 CN-CF4)5 1(2)CF0030, 1(2)CF0039,1(2)CF0048,1(2)CF0057 CN-FW4)2 1(2)FW0005 CN-NI-24 1(2)N10103 CN-NI-25 1(2)N10125,1(2)N10129 CN-NM4)1 1(2)NM0424,1(2)NM0425 CN-VG-03 1(2)VG0133,1(2)VG0134,1(2)VG0135,1(2)VG0136 CN-WL-01 1(2)WLA022,1(2)WLO321,1(2)WLOS06,1(2)WLO868 Page 3 of 6

1

SUMMARY

OF CHANGES Catawba Nuclear Station 1

Unit 1 and Unit 2

  • JOSTIFICATION FOR DEFERRAL -SPECIFIC CIIANGES

=> All Technical Specification Numbers will be changes; therefore numbers have been deleted.

=o All Valve Numbers have been modified to align with Valve Numbers on data sheets.

=o Additional information on test requirements have been added to all Justification For Deferrals.

Ji@ Number Valve Number (s) Change CN-CA-01 1(2)CA0037,1(2)CA0N1, Additional comments on Function to clarify position.

1(2)CA0045,1(2)CA0(M9, 1(2)CA0053,1(2)CA0057, 1(2)CA0061,1(2)CA0065 CN-CA-02 2CA0171,2CA0172 Deleted from system.

CN-FW-01 1(2)FW0028,1(2)FW0056 Additional comments on Basis for Deferral to clarify position.

CN-KC-03 1(2)KC0(M7,1(2)KC00279 Valves added to Justification for Deferral.

CN-KC-03 1(2)KC0280 Removed from JFD CN-ND-03 1(2)ND0010,1(2)ND0044 Additional comments on Basis for Deferral to clarify position.

CN-ND-04 1(2)ND0032A,1(2)ND0065B Additional comments on Basis for Deferral to clarify position.

CN-NF-01 1(2)NF0235 Valves added to Justification for Deferral.

CN-N1-(M 1(2)N10060,1(2)N10071 Additional comments on Function to clarify position.

1(2)N10082,(2)N10094 CN-NI-05 1(2)N10471,1(2)N10485 Valves added to Justification for Deferral.

CN-NI-l1 1 (2 )N10124, 1 (2)N10126, 1 (2 )N10128, Additional comments on Function to clarify position.

l(2)N10134,1(2)N10156,1(2)N10157, 1(2)N10159,1(2)N10160 CN-NI-13 1(2)N10165,1(2)N10167, Additional comments on Function to clarify position.

1(2)N10169,1(2)N10171 CN-NI-15 1(2)N10173A,1(2)N10178B Additional comments on Basis for Deferral to clarify position.

CN-N1-16 1(2)N10183B Additional comments on Basis for Deferral to clarify position.

CN-N1-18 1(2)N10332A,1(2)N10333B Additional comments on Function to clarify position.

)

CN-NI-19 1(2)N10136B Additional comments on Basis for Deferral to clarify position. '

CN-N1-20 1(2)N10342B Additional comments on Function and Test Alternative to j clarify position.  ;

CN-NS-03 1(2)NS0038B,1(2)NSOCM3A Additional comments on Test Alternative to clarify position.

CN-NV-02 1(2)NV0089A,1(2)NV0091B Additional comments on Basis for Deferral to clarify position.

CN-NV-05 1(2)NV0254 Additional comments on Function to clarify position.

CN-NV-06 1(2)NV0270,1(2)NV0290 Additional comments on Function to clarify position.

CN-NV-08 1(2)NV0813 Additional comments on Function to clarify position.

CN-NV-09 1(2)NV0090 Valves added to Justification for Deferral.

CN-NV-12 1(2)NV000! A,1(2)NV0002A Additional comments on Basis for Deferral to clarify position.

CN-NW-02 INWOO53, INWOO83, Reraoved from IST Program INW0122, INW0134 CN-NW-02 All valves listed Removed closing function CN-RN-01 1(2)RN0485 Valves added to Justification for Deferral.

CN VG-02 1(2)VG0025-1(2)VG0028, Corrected procedure number 1(2)VG0069-1(2)VG0072 CN-VI-02 1(2)V10077B Additional comments on Test Alternative to clarify position.

Page 4 of 6

i

SUMMARY

OF CHANGES l Catawba Nuclear Station Unit 1 and Unit 2

)

VALVES - CHANGES TO INSERVICE TESTING VALVE DATA SilEETS l Valve Number Change l 1(2)CA0023 Test Type from "FSO/C-Q" to *FSO-Q*

1(2)CA0028 Test Type from "FSO/C-Q" to "FSO-Q" ,

1(2)CA0033 Test Type from "FSO/C-Q" to "FSO-Q"

!(2)KC0280 Deleted "FSC-Q" Test i

1(2)FW0005 From " PAS" to "ACT" and Test Type to FSC-Q 1(2)FW0011 From "ACT" to " PAS"  ;

I 1(2)FW0013 From "ACT" to " PAS" 1(2)LD0017 Test Type from "FSO/C-Q" to "FSO-Q" 1(2)LD0018 Test Type from "FSO/C-Q" to "FSO-Q"

!(2)LD0047 Test Type from "FSOiC-Q" to "FSO-Q" 1(2)LD0048 Test Type from "FSO/C-Q" to "FSO-Q" 1(2)LD0071 Test Type from "FSO/C-Q" to "FSO-Q" 1(2)LD0072 Test Type from "FSO/CmQ" to "FSO-Q" 1(2)LD0078 Test Type from "FSO/C-Q" to "FSO-Q" 1(2)LD0079 Test Type from "FSO/C-Q" to "FSO-Q"

!(2)NB0262 Test Type from "FSO/C-Q" to "FSC-Q" 1(2)NC0056B Valve Category from "A" to "B" 1(2)NC0057 From % AS" to "ACT" and Test Type to "FSC-Q" 1(2)ND0003 From " PAS" to "ACT" 1(2)ND0031 From " PAS" to "ACT" 1(2)ND0035 From " PAS" to "ACT" 1(2)ND0038 From " PAS" to "ACT" 1(2)ND0064 From " PAS" to "ACT" 1(2)NF0235 Test Type from "FSO/C-Q" to "FSC-Q" 1(2)N10012 Test Type from "FSO/C-Q" to "FSO-Q" 1(2)N10015 Test Type from "FSO/C-Q" to "FSO-Q" 1(2)N10017 Test Type from "FSO/C.Q" to "FSO-Q" 1(2)N10019 Test Type from "FSO/C-Q" to "FSO-Q" 1(2)N10021 Test Type from "FSO/C-Q" to "FSO-Q" j 1(2)N10048 Test Type from "FSO/C-Q" to "FSC-Q"  !

2N10101 Removed "LT" Test Requirement 1(2)N10102 From " PAS" to "ACT" 1(2)N10119 From " PAS" to "ACT" 1(2)N10125 From " PAS" to "ACT" 1(2)N10129 From " PAS" to "ACT" i 1(2)NIO151 From " PAS" to "ACT" 1(2)N10161 From " PAS" to "ACT" 1(2)N10351 Test Type from "FSO/C-Q" to "FSO-Q" 1(2)N10352 Test Type from "FSO/C-Q" to "FSO-Q" 1(2)N10353 Test Type from "FSO/C-Q" to "FSO-Q" 1(2)N10354 Test Type from "FSO/C-Q" to "FSO-Q" 1(2)N10471 Valve Category from " A" to "AC" and Test Type to "FSC-Q" 1(2)NM0069 Valve Category from "A" to "AC" l 1(2)NV02% From "ACT" to " PAS" 1(2)NV0218 From "ACT" to " PAS" 1(2)RF0389B Valve Category from "A" to "B" 1(2)RF0392 Test Type from "FSO/C-Q" to "FSC-Q" I

1(2)RF0447B Valve Category from"A" to "B" 1(2)RF0448 Test Type from "FSO/C-Q" to "FSC-Q" 1(2)RN0405 Test Type from "FSO/C-Q" to "FSC-Q" 1(2)RN0438 Test Type from "FSO/C-Q" to "FSC-Q" Page 5 of 6

SUMMARY

OF CIIANGES Catawba Nuclear Station Unit 1 and Unit 2

< Yhive Number Change 1(2)VB0085 Test Type from "FSO/C-Q" to "FSC-Q" 1(2)VG0005 Type Frequency from "Q" to "M" 1(2)VG0006 Type Frequency from "Q" to "M"  ;

1(2)VG0007 Type Frequency from "Q" to "M" l 1(2)VG0008 Type Frequency from "Q" to "M" I 1(2)VG0049 Type Frequency from "Q" to "M" 1(2)VG0050 Type Frequency from "Q" to "M" 1(2)VG0051 Type Frequency from "Q" to "M" i 1(2)VG0052 Type Frequency from "Q" to "M" 1(2)V10079 Test Type from "FSO/C-Q" to "FSC-Q" 1(2)V10367 Test Type from "FSO/C-Q" to "FSC-Q" l 1(2)V10368 Test Type from "FSO/C-Q" to "FSC-Q" l 2VS0054 Change Test Requirement "LT" to "LJ" 1(2)VS0056 Test Type from "FSO/C-Q" to "FSC-Q" 1(2)VY0016 Test Type from "FSO/C-Q" to "FSC-Q" 1(2)WLO321 Test Type from "FSO/C-Q" to "FSC-Q" 1(2)WLO805A Valve Category from "A" to "B" 1(2)WL0806 Test Type from "FSO/C-Q" to "FSC-Q" 1(2)WLO807B Valve Category from "A" to "B" 1(2)WL0825A Valve Category from "A" to "B" 1(2)WLOS27B Valve Category from "A" to "B" 1(2)WLO867A Valve Category from "A" to "B" 1(2)WLOS68 Test Type from "FSO/C-Q" to "FSC-Q" 1(2)WLOS69B Valve Category from "A" to "B" 1(2)WLA0022 Test Type from "FSO/C-Q" to "FSC-Q" 1(2)YM0121 Test Type from "FSO/C-Q" to "FSC-Q" 1SV0009 Act. Type from "AO" to "S A" ISV0010 Act. Type from "MO" to "SA" ISV0011 Act. Type from "AO" to "S A" 1SV0012 Act. Type from "AO" to "SA" 2SV0009 Act. Type from "AO" to "S A" 2SV0010 Act. Type from "AO" to "SA" 2SV00ll Act. Type from "AO" to "S A" 2SV0012 Act. Type from "AO" to "S A" lYC0065 Test Type from "FSC-Q" to "FSO-Q" IYC0108 Test Type from "FSC-Q" to "FSO-Q" i