IR 05000250/2021002

From kanterella
Revision as of 01:28, 8 September 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Integrated Inspection Report 05000250/2021002 and 05000251/2021002
ML21216A065
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/04/2021
From: David Dumbacher
NRC/RGN-II, Division Reactor Projects II, NRC/RGN-II/DRP/RPB3
To: Coffey B
Florida Power & Light Co
References
IR 2021002
Download: ML21216A065 (19)


Text