ML20214E701

From kanterella
Revision as of 04:40, 6 August 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Summary of OL Review Costs & Supporting Documentation for 840624-1222.Addl Fees Could Be Assessed If Ceiling for OL Review Costs Raised Prior to Plant Licensing
ML20214E701
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 04/04/1986
From: Holloway C
NRC OFFICE OF ADMINISTRATION (ADM)
To:
NRC OFFICE OF ADMINISTRATION (ADM)
Shared Package
ML20213F887 List:
References
FOIA-87-227 NUDOCS 8604080494
Download: ML20214E701 (3)


Text

E..

FOZ# Rm f any'o,,

+ UNITED STATES

[ [g NUCLEAR REGULATORY COMMISSION

E WASHINGTON. D. C. 20555 s
    1. j Q

g,

..... APR 0 41986 Docket No. 50-445 MEMORANDUM FOR: Files FROM: C. James Holloway, Jr., Acting Director License Fee Management Staff, ADM

SUBJECT:

COMANCHE PEAK 1 OPERATING LICENSE REVIEW COSTS 10 CFR 170 of the Commission's regulations for license fees was revised effective June 20, 1984. Section 170.12(b) of the revised rule provides that for applications for operating license (0L) review which have been pending with the Commission for six months or longer, billings would be made at six-month intervals until the review is completed, whichever is earlier.

In accordance with Section 170.12(b), we have reviewed the cost incurred by the various program offices directly involved in processing the operating license for the period June 24, 1984 through December 22, 1984. Attached is a summary of the review costs as well as the sup-porting documentation from the program offices. The attachment shows that a total of $1,523,367 was expended for the OL review. Cost adjust-ments of $194 for the previous billing period were made by NRR (see my memo to files dated 11/22/85), leaving net costs of $1,523,173 for the period. When the costs of $1,523,173 are added to the costs of $3,264,927 from the previous period the cumulative OL review costs through December 22, 1984 are $4,788,100. Accordingly,$3,077,400, which was billed to the licensee on February 11, 1985, is the maximum amount that may be assessed for the OL review under 10 CFR 170 as revised June 20, 1984.

However, in the event that the regulation is subsequently revised and the ceiling is raised to a higher number or eliminated before Comanche Peak 1 is licensed, then additional fees could be assessed up to any new ceiling or for the full cost if the ceiling were eliminated.

1

/

0l' m .. M'im C. James olloway, Jr.

Acting Director License Fee Management Staff Office of Administration

Enclosure:

Summary of Costs and Supporting Documentation s

y me- w gu &

\.-.

,.. Texas Utilities Generating Company

. Orerating License Review Costs From 6/24/84 Through 12/22/84 FACILITY: Comanche Peak 1 DOCKET NO.: 50-445 Costs Per Professional Program Office Professional S taf f-Hours S taff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs

1. NRR $62 9 ,31 0. 0 $577,220 $625,179 $1,202,399
2. IE-HQ 53 896.0 47,488 9.900 57,388
3. REGIONS 53 4,956.1 262,673 --

262,673

4. ACRS 62 2.0 124 --

124

5. NMSS 58 13.5 783 --

783 TOTAL COST: $1,523,367 NRR Cost Adjustment From Previous Billing Period -194

$1,523,173 0'

1 l

l

L..

  • j SUMARY Adjustments To Be Made To First Power
  • Reactor Fee Billin9s Under 6/20/84 Revised Schedules Based on 8/15/85 and 10/22/85 Memo From NRR to LFMS NRR Contractual Services Costs Delete Costs Add Costs Total Adjust.

Unit From Prev. Billings To Prev. Billings To Bills Beaver Valley 2 -$ 1,000 -$ 539 -$ 461 Bellefonte 1 - 12,988 -- - 12,988 Braidwood 1 -

150 -- - 150 Byron 1 -

208 -- - 208 Comanche Peak 1 -

194 -- - 194 Comanche Peak 2 - 47 -- - 47 Catawba 1 -

3.120 -- -

3.120 Harris 1 - 26,300 -- - 26,300 Hope Creek 1 - 1,518 -- - 1,518 Lim: rick 1 - 60,600 -- - 60,600 Lirarick 2 -- + 99 + 99 Marble Hill 1 - 17,958 -- - 17,958 Marble Hill 2 -

539 -- - 539 Midland 1 - 45,700 -- - 45,700 Millstone 3 - 6,400 -- - 6,400 Perry 1 -- + 2,300 + 2,300 River Bend 1 - 7,500 -- - 7,500 Seabrook 1 - 4,800 -- - 4,800 Vogtle 1 -- + 5,000 + 5,000 WNP-3 -

800 -- -

800 Totals $-189,822 $+ 7,938 $-181,884 3  !

i i

2

q

Q* : e, 1

UNITED $TATES V

P OLEAR REGULATCRY COMMISSION I

~

c=.smwovow. e. c. msss }

i., /

f'J #

DEC 2 01985 MEMORANDUM FOR: William 0. Miller, Chief License fee Management Branch Office of Administration FROM: R. S. Brown, Jr. , Director Planning and Program Analysis Staff Office of Nuclear Material Safety and Safeguards

SUBJECT:

LICENSE FEE MEMOS The enclosed license fee memos and backup materials are for the 6 month period 12/23/84 - 6/22/85.

As stated in my July 23, 1984 memorandum to you on procedures for administra-tion of the revised fee rule, NMSS expects LFMB to retain backup materials (computer listing of hours and copies of contract correspondence) to be released to licensees upon request. Please note that the monthly letter status reports should not be released without a prescreening by NMSS because they often contain information considered to be sensitive about competitors. As specified in the referenced memorandum, also note that unreconciled monthly letter status reports received from DOE and private contractors are the source of contract costs.

Please note that a few fee memos are still being processed for this time frame and will be forwarded to you as soon as possible.

The following reactors had no casework associated to them during the 6 month period 12/23/84 - 6/22/85, thus no hours have been charged.

1 1

i J

2 Name of Unit Docket Belleionte 2 05000439 Grand Gulf 2 05000417 Washington Nuclear 2 05000397 Washington Nuclear 3 05000508 Commanche Peak 2 05000446 Diablo Canyon 2 05000323 Harris 2 05000401 Limerick 1 05000352

. Limerick 2 05000353 ,

Perry 2 ~ 05000441 Sea Brook 2 05000444 i Vogtle 2 05000425 Marble Hill 2 n 05000547 1 \

Y R. S. rown, J f

~

Planning andogram P"7 !"Analysis DirectorStaff 1

Office of Nucidar Material Safety and Safeguards

Enclosure:

License Fee Memos and Backup i

l 4

'1 2

l l

l

12/07/85

  • ib ~ '" .
  • 1

("' ' , i *

y ,

DOCKET NO.: 05000445 ,

MEMORANDUM FOR: WILLIAM 0. MILLER, CHIEF LICENSE FEE MANAGEMENT BRANCH OFFICE OF ADMINISTRATION FROM: C. GASKIN SG REACTOR S TRANSPORTATION LICENSING BRANCH DIVISION OF SAFEGUARDS OFFICE OF NUCLEAR MATERIALS SAFETY AND SAFEGUARDS

SUBJECT:

COSTS AND MANHOURS FOR LICENSING ACTION THE CONTRACT COSTS INCURRED AND MANHOURS USED IN REVIEWING THE'APPLI-CATION DATED 05/08/85 ARE TABULATED BELOW FOR LICENSE NO. 1 l

1. NAME: COMANCHE PEAK 1YA 2001 BRYAN TOWER l DALLAS, TX. 75201 j
2. A) CASEWORK CONTROL NO. 05000445080Q B) MAIL CONTROL NO. 40227 C) TAC NO.
3. A) PERIOD COVERED (STAFF HOURS) 12/23/84 - 06/22/85 B) COMPLETION DATE: 08/06/85 C) AMENDMENT NO.
4. CONTRACT COSTS ASSOCIATED WITH THIS APPLICATION: $0 0 1 PERIOD COVERED (CONTRACT COSTS)
5. TAC WORK BY OTHER OFFICES: 0.0 HOURS 8M l
6. HOURS DURING REPORTING PERIOD: 0.0 fAA W 1
7. FEE CHARGEABLE : $0
8. TOTAL COST TO PROCESS APPLICATION $

APPROVED:

G.41CCORKLE b AA C. GASKIN BRANCH CHIEF PROJECT MANAGER SG REACTOR & TRANSPORTATION LICENSING BRANCH k Nh AW

RUi6 DATE REGULATORY INFORMATION TRACKING SYSTEM PAGE 12/07/85 DETAIL LISTING OF HOURS REPORTED ON CASEWORK 86 PERIOD COVERED: 12/23/84-06/22/85 PROJECT MANAGER: CE GASKIN CASEWORK NUMBER: 05000445080Q FACILITY NAME: COMANCHE PEAK 1 DATE CLOSED: 08/06/85 NATURE OF ACTIVITY:

a COMMANCHE PEAK REV 4 SECURITY PLAN REGULAR REVIEWER WEEK ENDING HOURS NO MANPOWER RECORDS EXIST FOR THIS CASE!

4 1

I s

l

[

1 l

(I 1

1

- - -- - . -. . - . - . . . _ _ . . . _ - _ . . . , _ _ _ , _ _ _ - . _ _ _ . . _ _ _ _ _ _ _ _ _ _ , . , _ , _ , _