Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20212K8671999-09-30030 September 1999 Summaries of 971111,980317,980505,980623,980707,980806, 980917,981023,981110,981217,990114,990205,990318,990325, 990416 & 990714 Meetings with Licensee Re Implementation of plan-for-excellence Restart Issues.With Minutes & Handouts ML20210P9511999-08-10010 August 1999 Summary of 990722 Meeting with Util in Rockville,Md Re Recently Signed Asset Purchase Agreement Between Licensee & Amergen Energy Co & Proposed Transfer of CPS License to Be Submitted to Nrc.List Meeting Attendees & Handout Encl ML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20203C2371999-02-0808 February 1999 Summary of 990121 Meeting with Illinois Power Company in Rockville,Maryland Re Proposed Changes to Degraded Voltage Relay Setpoints as Described in License Amend Submittal .List of Meeting Participants & Meeting Handouts Encl ML20196B0371998-11-19019 November 1998 Summary of 980917 Meeting with Util in Rockville,Md to Discuss Progress of Plant Toward Restart.List of Meeting Participants & Handouts Encl ML20195D8671998-11-0303 November 1998 Summary of 981027 Meeting with Illinois Power Co in Rockville,Md Re Proposed Feedwater Leakage Control Sys as Described in License Amend Submittal .List of Attendees & Meeting Handout Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20236R3661998-07-14014 July 1998 Summary of 980625 Meeting W/Util in Rockville,Md Re Proposed Testing Program for ECCS Suction Strainers,Recently Installed at Perry & Grand Gulf Facilities & Will Soon Be Installed at Clinton Facility.Attendees List Encl ML20217H3401998-03-31031 March 1998 Summary of 970717 Meeting W/Util in Rockville,Md Re Issue of Degraded Grid Voltage at Plant.List of Participants & Meeting Handouts Encl ML20217C8361998-03-24024 March 1998 Summary of 980319 Meeting W/Util in Rockville,Md Re Potential Fix for Issues of Degraded Voltage at Plant.List of Meeting Participants & Meeting Handout Encl ML20203B3001998-02-0505 February 1998 Summary of 971211 Meeting W/Illinois Power Co in Clinton, Illinois Re Findings of NRC Special Evaluation Team.List of Meeting Attendees & Copy of Meeting Handout Encl ML20203A2641998-02-0303 February 1998 Summary of 980127 Meeting W/Illinois Power Co in Rockville, Maryland Re Potential Fix for Issue of Degraded Voltage at Clinton Power Station.List of Meeting Attendees & Copy of Meeting Handout Encl ML20138G4821997-04-29029 April 1997 Summary of 970421 Meeting W/Util in Rockville,Md to Discuss Licensee long-term Plans for Resolution of Thermo-lag Related Issues.List of Participants & Copy of Meeting Handout Encl ML20147J2081997-04-0909 April 1997 Summary of 970403 Meeting W/Illinois Power Co in Rockville, MD Re Licensee Amend Application on Degraded Voltage Instrumentation for Clinton Power Station.List of Attendees & Copy of Handouts Encl ML20135C4781996-12-0404 December 1996 Summary of 961121 Meeting W/Util in Rockville,Md to Discuss Proposed Transfer of Minority Ownership Interest in Plant. W/List of Attendees ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20056E9731993-08-0909 August 1993 Summary of 930728 Meeting W/Util in Rockville,Md to Discuss Proposed Mods to Reactor Vessel Water Level Instrumentation, Per NRC Bulletin 93-03.List of Attendees Encl ML20206L9831988-11-25025 November 1988 Summary of Operating Reactors Events Meeting 88-45 on 881115.List of Attendees & Handouts Encl ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20153G5481988-05-0404 May 1988 Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items ML20236J2291987-10-30030 October 1987 Summary of 871007 Meeting W/Hydrogen Control Owners Group (Hcog) Re Hcog Submittals on Methods for Calculating Equipment Temp Based on Quarter Scale Test Data & Impact of Station Blackout Considerations on Hcog Programs.W/Encl ML20214J4991987-05-15015 May 1987 Summary of Operating Reactors Events Meeting 87-09 on 870330 Re Events Which Occurred Since 870316 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Events Presented Encl ML20211M9761987-02-24024 February 1987 Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl ML20213F0641986-11-10010 November 1986 Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl ML20207B0141986-10-31031 October 1986 Summary of 861022 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Generation Event & Validation of Methods for Calculating Heat Transfer.Viewgraphs Encl ML20203G6921986-07-25025 July 1986 Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl ML20203G4961986-07-24024 July 1986 Summary of 860715 Telcon W/Util Re Siumulator Exercise During NRR Mgt Assessment 860709 Meeting.Observation Made Re Difficulty in Determining Actions for Event Resulting in Loss of Hpis ML20202B1811986-07-0202 July 1986 Summary of Allegation Review Board 860625 Meeting at Region III Re Drug Use by Us Testing Personnel,Urine Sampling Program,Defective Relays & Inadequate Experience in Radwaste Dept ML20210R8471986-05-13013 May 1986 Summary of Operating Reactors Events Meeting 86-16 on 860512 Re Events Occurring Since Last Meeting.List of Attendees & Related Info Encl ML20141G2901986-04-0707 April 1986 Summary of 860313 Meeting W/Mark III Containment Hydrogen Control Owners Group in Bethesda,Md Re Heat Loss Analysis. List of Attendees,Handout & Viewgraphs Encl ML20154N8311986-03-11011 March 1986 Summary of 860128-29 Meetings W/Util,Sargent & Lundy & BNL in Chicago,Il Re Test Vs Analysis Concern for Active Valve Qualification Identified During Sqrt & Pvort Audits ML20137L1021986-01-17017 January 1986 Summary of 860113 Meeting W/Util & Region III in Bethesda,Md Re Fuel Load Readiness & Definition of Approach for Completing Remaining Tasks.List of Attendees & Supporting Documentation Encl ML20140B3501986-01-17017 January 1986 Summary of 851219 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Heat Sink Modeling.List of Attendees & Viewgraphs Encl ML20137K5471986-01-17017 January 1986 Summary of 851218 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Combustible Gas Control Emergency Procedure Guideline.Attendees List,Draft Emergency Procedure Guideline & Viewgraphs Encl ML20151M7101985-12-24024 December 1985 Summary of 851216 Meeting W/Util in Bethesda,Md Re Accelerated Power Ascension Program.List of Meeting Attendees & Handouts Encl ML20138N5521985-12-17017 December 1985 Summary of 851120 Meeting W/Hydrogen Control Owners Group Re Status & Results of Hydrogen Combustion Tests in quarter- Scale Test Facility (Mark Iii).Attendee List & Handouts Encl ML20138S1051985-11-13013 November 1985 Summary of 851106-07 Meetings W/Util & Sargent & Lundy in Bethesda,Md Re Fire Protection.List of Attendees,Meeting Agenda & Safe Shutdown Analysis Deviation Requests Encl ML20136E9771985-11-13013 November 1985 Summary of 851106 Meeting W/Util in Bethesda,Md Re Status of Hydrogen Control Program,Overview of Hydrogen Control Preliminary Analysis & Schedule for Staff Review of Analysis.Meeting Handouts & Attendees List Encl ML20138P7221985-10-30030 October 1985 Summary of 851021 Meeting W/Util,Sargent & Lundy,Bnl & S&W in Bethesda,Md to Demonstrate That Pump & Valve Operability Program in Compliance W/Nrc Reg Guide.Viewgraphs Encl ML20133H2441985-10-0909 October 1985 Summary of 850926 Meeting W/Util & BNL in Bethesda,Md Re Util Recovery Program Following Unsatisfactory Pvort Audit on 850826.List of Meeting Attendees & Viewgraphs Encl ML20134N0591985-08-27027 August 1985 Summary of Caseload Forecast Panel 850723-24 Meetings W/Util at Plant Re Const Progress Review & Estimation of Resource Needs for Licensing Activities.Fuel Load Date of Jan 1986 Appears Achievable.Viewgraphs Encl ML17276A1761981-11-0202 November 1981 Forwards Minutes from Mechanical Engineering Branch 810929-30 & 1001 Meetings in Woodbury,Ny & 811016 Preservice Insp Meeting in Washington,Dc.Agenda Items from Both Meetings & Subsequent Resolution Encl ML20214G8711978-01-11011 January 1978 Summary of 771202 Meeting W/Ge Re Rev 1 to NEDO-10466, Power Generation Control Complex Design Criteria & Safety Evaluation. List of Meeting Attendees Encl ML20198F5601974-01-22022 January 1974 Summary of 740115 Site Visit to Inspect Onsite Meteorological Monitoring Program 1999-09-30
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20212K8671999-09-30030 September 1999 Summaries of 971111,980317,980505,980623,980707,980806, 980917,981023,981110,981217,990114,990205,990318,990325, 990416 & 990714 Meetings with Licensee Re Implementation of plan-for-excellence Restart Issues.With Minutes & Handouts ML20210P9511999-08-10010 August 1999 Summary of 990722 Meeting with Util in Rockville,Md Re Recently Signed Asset Purchase Agreement Between Licensee & Amergen Energy Co & Proposed Transfer of CPS License to Be Submitted to Nrc.List Meeting Attendees & Handout Encl ML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20203C2371999-02-0808 February 1999 Summary of 990121 Meeting with Illinois Power Company in Rockville,Maryland Re Proposed Changes to Degraded Voltage Relay Setpoints as Described in License Amend Submittal .List of Meeting Participants & Meeting Handouts Encl ML20196B0371998-11-19019 November 1998 Summary of 980917 Meeting with Util in Rockville,Md to Discuss Progress of Plant Toward Restart.List of Meeting Participants & Handouts Encl ML20195D8671998-11-0303 November 1998 Summary of 981027 Meeting with Illinois Power Co in Rockville,Md Re Proposed Feedwater Leakage Control Sys as Described in License Amend Submittal .List of Attendees & Meeting Handout Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20236R3661998-07-14014 July 1998 Summary of 980625 Meeting W/Util in Rockville,Md Re Proposed Testing Program for ECCS Suction Strainers,Recently Installed at Perry & Grand Gulf Facilities & Will Soon Be Installed at Clinton Facility.Attendees List Encl ML20217H3401998-03-31031 March 1998 Summary of 970717 Meeting W/Util in Rockville,Md Re Issue of Degraded Grid Voltage at Plant.List of Participants & Meeting Handouts Encl ML20217C8361998-03-24024 March 1998 Summary of 980319 Meeting W/Util in Rockville,Md Re Potential Fix for Issues of Degraded Voltage at Plant.List of Meeting Participants & Meeting Handout Encl ML20203B3001998-02-0505 February 1998 Summary of 971211 Meeting W/Illinois Power Co in Clinton, Illinois Re Findings of NRC Special Evaluation Team.List of Meeting Attendees & Copy of Meeting Handout Encl ML20203A2641998-02-0303 February 1998 Summary of 980127 Meeting W/Illinois Power Co in Rockville, Maryland Re Potential Fix for Issue of Degraded Voltage at Clinton Power Station.List of Meeting Attendees & Copy of Meeting Handout Encl ML20138G4821997-04-29029 April 1997 Summary of 970421 Meeting W/Util in Rockville,Md to Discuss Licensee long-term Plans for Resolution of Thermo-lag Related Issues.List of Participants & Copy of Meeting Handout Encl ML20147J2081997-04-0909 April 1997 Summary of 970403 Meeting W/Illinois Power Co in Rockville, MD Re Licensee Amend Application on Degraded Voltage Instrumentation for Clinton Power Station.List of Attendees & Copy of Handouts Encl ML20135C4781996-12-0404 December 1996 Summary of 961121 Meeting W/Util in Rockville,Md to Discuss Proposed Transfer of Minority Ownership Interest in Plant. W/List of Attendees ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20056E9731993-08-0909 August 1993 Summary of 930728 Meeting W/Util in Rockville,Md to Discuss Proposed Mods to Reactor Vessel Water Level Instrumentation, Per NRC Bulletin 93-03.List of Attendees Encl ML20206L9831988-11-25025 November 1988 Summary of Operating Reactors Events Meeting 88-45 on 881115.List of Attendees & Handouts Encl ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20153G5481988-05-0404 May 1988 Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items ML20236J2291987-10-30030 October 1987 Summary of 871007 Meeting W/Hydrogen Control Owners Group (Hcog) Re Hcog Submittals on Methods for Calculating Equipment Temp Based on Quarter Scale Test Data & Impact of Station Blackout Considerations on Hcog Programs.W/Encl ML20214J4991987-05-15015 May 1987 Summary of Operating Reactors Events Meeting 87-09 on 870330 Re Events Which Occurred Since 870316 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Events Presented Encl ML20211M9761987-02-24024 February 1987 Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl ML20213F0641986-11-10010 November 1986 Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl ML20207B0141986-10-31031 October 1986 Summary of 861022 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Generation Event & Validation of Methods for Calculating Heat Transfer.Viewgraphs Encl ML20203G6921986-07-25025 July 1986 Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl ML20203G4961986-07-24024 July 1986 Summary of 860715 Telcon W/Util Re Siumulator Exercise During NRR Mgt Assessment 860709 Meeting.Observation Made Re Difficulty in Determining Actions for Event Resulting in Loss of Hpis ML20202B1811986-07-0202 July 1986 Summary of Allegation Review Board 860625 Meeting at Region III Re Drug Use by Us Testing Personnel,Urine Sampling Program,Defective Relays & Inadequate Experience in Radwaste Dept ML20210R8471986-05-13013 May 1986 Summary of Operating Reactors Events Meeting 86-16 on 860512 Re Events Occurring Since Last Meeting.List of Attendees & Related Info Encl ML20141G2901986-04-0707 April 1986 Summary of 860313 Meeting W/Mark III Containment Hydrogen Control Owners Group in Bethesda,Md Re Heat Loss Analysis. List of Attendees,Handout & Viewgraphs Encl ML20154N8311986-03-11011 March 1986 Summary of 860128-29 Meetings W/Util,Sargent & Lundy & BNL in Chicago,Il Re Test Vs Analysis Concern for Active Valve Qualification Identified During Sqrt & Pvort Audits ML20137L1021986-01-17017 January 1986 Summary of 860113 Meeting W/Util & Region III in Bethesda,Md Re Fuel Load Readiness & Definition of Approach for Completing Remaining Tasks.List of Attendees & Supporting Documentation Encl ML20140B3501986-01-17017 January 1986 Summary of 851219 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Heat Sink Modeling.List of Attendees & Viewgraphs Encl ML20137K5471986-01-17017 January 1986 Summary of 851218 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Combustible Gas Control Emergency Procedure Guideline.Attendees List,Draft Emergency Procedure Guideline & Viewgraphs Encl ML20151M7101985-12-24024 December 1985 Summary of 851216 Meeting W/Util in Bethesda,Md Re Accelerated Power Ascension Program.List of Meeting Attendees & Handouts Encl ML20138N5521985-12-17017 December 1985 Summary of 851120 Meeting W/Hydrogen Control Owners Group Re Status & Results of Hydrogen Combustion Tests in quarter- Scale Test Facility (Mark Iii).Attendee List & Handouts Encl ML20138S1051985-11-13013 November 1985 Summary of 851106-07 Meetings W/Util & Sargent & Lundy in Bethesda,Md Re Fire Protection.List of Attendees,Meeting Agenda & Safe Shutdown Analysis Deviation Requests Encl ML20136E9771985-11-13013 November 1985 Summary of 851106 Meeting W/Util in Bethesda,Md Re Status of Hydrogen Control Program,Overview of Hydrogen Control Preliminary Analysis & Schedule for Staff Review of Analysis.Meeting Handouts & Attendees List Encl ML20138P7221985-10-30030 October 1985 Summary of 851021 Meeting W/Util,Sargent & Lundy,Bnl & S&W in Bethesda,Md to Demonstrate That Pump & Valve Operability Program in Compliance W/Nrc Reg Guide.Viewgraphs Encl ML20133H2441985-10-0909 October 1985 Summary of 850926 Meeting W/Util & BNL in Bethesda,Md Re Util Recovery Program Following Unsatisfactory Pvort Audit on 850826.List of Meeting Attendees & Viewgraphs Encl ML20134N0591985-08-27027 August 1985 Summary of Caseload Forecast Panel 850723-24 Meetings W/Util at Plant Re Const Progress Review & Estimation of Resource Needs for Licensing Activities.Fuel Load Date of Jan 1986 Appears Achievable.Viewgraphs Encl ML17276A1761981-11-0202 November 1981 Forwards Minutes from Mechanical Engineering Branch 810929-30 & 1001 Meetings in Woodbury,Ny & 811016 Preservice Insp Meeting in Washington,Dc.Agenda Items from Both Meetings & Subsequent Resolution Encl ML20214G8711978-01-11011 January 1978 Summary of 771202 Meeting W/Ge Re Rev 1 to NEDO-10466, Power Generation Control Complex Design Criteria & Safety Evaluation. List of Meeting Attendees Encl ML20198F5601974-01-22022 January 1974 Summary of 740115 Site Visit to Inspect Onsite Meteorological Monitoring Program 1999-09-30
[Table view] |
Text
.
, q March 31, 1998-
. LICENSEE: filinois Power Company -
1
. FACILITY:. Clinton Power Station j
SUBJECT:
SUMMARY
OF JULY 17,- 1997, MEETING ON DEGRADED VOLTAGE On July 17,1997, NRC management and staff met in Rockville, Maryland, with representatives of Illinois Power Companyi The purpose of the meeting was to discuss the issue of degraded grid voltage at the Clinton Power Station.- A list of the meeting participants is included as
- Enclosure 1, and a copy of the meeting handout is provided as Enclosure 2.
The licensee presented information that they found signified compliance with their
- design / licensing basis. The NRC staff did not agree. The licensee stated that they would '
review this issue for the next step. ,
Original signed by:
Jon B;;Hopkins, Senior Project Manager -
Project Directorate lil-3 .
Division of Reactor Projects lil/IV !
Office of Nuclear Reactor Regulation j Docket No. 50-461 >
Enclosures:
- 1. List of Meeting Participants
- 2. Meeting Handout -
\
cc w/encis: See next page e, O\
. DISTRIDUTION -
Y Hard Coov w/encla E-mail w/Enct 1 _
Docket File SCollins (SJC1), GKelly PD lll-3 Reading FMiraglia (FJM) JRoe PUBLIC ' THiltz GMarcus GGrant, Rlli . BBoger DSkeen JHopkins - . EAdensam DButler RSavio DThatcher Hard Conv w/Enci 1 Dross (SAM 3) NTrehan OGC JHopkins '. CMiller i ACRS JCalvo -
DOCUMENT NAMEi G:\CLINTON\071797.MTS' OFFICE - PD3-3:PM - i R PD3-3:LA F n: TE 3) > 313l -
OFFICIAL RLECORD COPY 9904030274 980331 PDR ADOCK 05000461 P ,
PDR gdgMIU in
- March 31, 1998 LICENSEE: lilinois Power Company FACILITY: Clinton Power Station
SUBJECT:
SUMMARY
OF JULY 17,1997, MEETING ON DEGRADED VOLTAGE On July 17,1997 NRC management and staff met in Rockville, Maryland, with representatives of Illinois Power Company. The purpose of the meeting was to discuss the issue of degraded grid voltage at the Clinton Power Station. A list of the meeting participants is included as Enclosure 1, and a copy of the meeting handout is provided us Enclosure 2.
The licensee presented information that they found signified compliance with their design / licensing basis. The NRC staff did not agree. The licensee stated that they would review this issue for the next step.
Original signed by:
Jon B. Hopkins, Senior Project Manager Project D! rectorate ill-3 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation Docket No. 50-461
Enclosures:
- 1. List of Meeting Participants
- 2. Meeting Handout cc w/cncis: See next page DISTRIBUTION Hard Conv w/encls E-mail w/Enct 1 Docket File SCollins (SJC1) GKelly PD lil-3 Reading FMiraglia (FJM) JRoe PUBLIC - THiltz GMarcus GGrant, Rlli BBoger DSkeen JHopkins EAdensam DButler j RSavio DThatcher Hard Coov w/Enct 1 Dross (SAM 3) NTrehan OGC JHopkins CMiller ACRS JCaNo DOCUMENT NAMEi G:\CLINTON\071797.MTS OFFICE PD3-3:PM ,
S_ PD3-3:LA F j NAME JHopkins I f EBamhill @/P l DATE 3 8//98 7 (H//98 OFFICIAL RECORD COPY-
p "%
. p+ t UNITED STATES i , g g NUCLEAR REEULATORY COMMISSION i f CASHi~;CTcN, D.C. 20665-0001 s*****/ March 31, 1998 LICENSEE: Illinois Power Company FACILITY: Clinton Power Station
SUBJECT:
SUMMARY
OF JULY 17,1997, MEETING ON DEGRADED VOLTAGE On July 17,1997, NRC management and staff met in Rockville, Maryland, with representatives of Illinois Power Company. The purpose of the meeting was to discuss the issue of degraded grid voltage at the Clinton Power Station. A list of the meeting participants is included as Enclosure 1, and a copy of the meeting handout is provided as Enclosure 2.
The licensee presented information that they found signified compliance with their design / licensing basis. The NRC staff did not agree. The licensee stated that they would review this issue for the next step.
I 0 /
Jon B. Hopkins, enior' Project Manager Project Directorate lil-3 Division of Reactor Projects Ill/IV l Office of Nuclear Reactor Regulation i 8 l Docket No. 50-461 1
Enclosures:
- 1. List of Meeting Participants
- 2. Meeting Handout cc w/encls: See next page
E Clinton Power Station, Unit 1-tilinois Power Company
~
cc:
i John G. Cook lilinois Department of Nuclear Safety Senior Vice President Office of Nuclear Facility Safety Clinton Power Station 1035 Outer Park Drive P.O. Box 678 Springfield, IL- 62704 Clinton,IL 61727 )
Joseph V. Sipek Larry Wigley Director- Licensing Manager Nuclear Station Clinton Power Station a Engineering Department P.O. Box 678 ' 3 Clinton Power Station Mail Code V920 -)
P.O. Box 678 Clinton,IL 61727 l Clinton,IL 61727 Resident inspector U.S. Nuclear Regulatory Commission RR#3, Box 229 A Clinton,IL 61727 R. T. Hill Licensing Services Manager General Electric Company 175 Cunner Avenue, M/C 481 San Jose, CA 95125 l Regional Administrator, Region ill U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Chairman of DeWitt County clo County Clerk's Office DeWitt County Courthouse Clinton,IL 61727 .
J. W. Blattner Project Manager _ !
Sargent & Lundy Engineers 55 East Monroe Street '
Chicago,IL 60603 :
s-
MEETING ATTENDEES 1
NRC AND ILLINOIS POWER COMPANY DISCUSSION OF DEGRADED GRID VOLTAGE JULY 17,1997 .
g I J. Hopkins G. Kelly J. Calvo J. Roe D. Thatcher G. Marcus N. Trehan D. Skeen ,
C. Miller
- 1 lilinois Power Comoany J. Sipek D. Thompson T. Elwood W. Romberg J. Collins M. Lyon T. Wiggins P. Walberg
'by teleconference
' j 1
l Enclosure 1 '
lilinois Power (IP)
Meeting with NRC on Degraded Voltage l
July 17,1997 l
l I
i i
IP Representatives:
W. D. Rornberg Asst. Vice President D.P. Thompson Manager-Nuclear Station Engineering M. W. Lyon Asst. Plant Manager Operations J. R. Collins Director-Transmission Services J. V. Sipek Director-Licensing T. B. Elwood - Supervisor-Licensing Operations T. O. Wiggins Engineer til P. E. Walberg Engineering Group Leader-Nuclear /PRA Attachment 2
Agenda Introduction Wayne Romberg Background Jim Collins Dan Thompson Mike Lyon Design / Licensing Basis Joe Sipek Dan Thompson Issue Resolution Joe Sipek i
. 1 m
1 Background !
e Development of Issue
. Configuration ,
l
. Electrical System Operations (Normal Operations) !
I i
j
_ e re as
. #. sw i 3m- a er ne
. n th It s no Nc: t i
u ie is ss o
s m a
r c ss m1 g r
i nt C
1 a
iD aVd e b . t5t rKe k u s. s4o 4 s c A3n e e lg n
e 4 s B s i
m f
o n x2m l
oee a nst s e egy r pi c p F s,
- A f E-
- L,.
IIllli lII
- s
- g,iIilIgIIIII III v.
- T i
= ]
[
- is f
f N N o
- ORO T
- NE IO n
t o-t-
o t-LPT C S s C. .
l g
S- ] ~ o t- h a [
a-m u " /
c- m m
r-I n- n1 x1 e o uf t- is t As n cn I n
n C- ru ar sa or b u
tT s
nb w1fsn RT
%S ou C a
- CS ANt wTr !t o
L
- r ne1 r .II gb1sb% l ill,. Ig IIIIlIIIIlI xn ua Ar n T o4 t5 n a n Re h
t ho Ct un tt b ug oou ub oo u onb St S Siu TRS nb mS > oUu c oo q '
TCS l
t o To l B l*
nt '
,w b o hu tS P r-s or O' i Nu t C oo n Tc o E e i t
D a o t T
sS O' r Ce E
Cwo oP -
T d _
l o _
c _
n i
K u -
w
.. R
. . :2-
' -m_
g8 j j^Og i
N7 p
_m Os g m e
.: p M~
> EO
w O - _
e e 1 i J. O!. gg
=~ z
$ ~
)l[ SW 2 f3 aR EE @
o n@. c 8
".e.F9au s 21! F E 9 Y -/ 5 m 1
~ n - ,
l E l
- c. Os k
s
{! ,
cO!,
5 st
@g m
O e
o
b 3 .- ?e l
k W,W
- t. '
is o
(d p Nann ;
Desian/Licensina Basis
. USAR Sections 3.1.2.2.8 andI5.2.2.1 describe compliance with General Design Criterion 17
. General Design Criterion 17 - Electric Power Systems "An onsite electric power system and an offsite electric system shall be provided to permit functioning of structures, systems, and components important to safety."
. CPS Compliance With Key Requirements in GDC 17
- Requirement i 1
" Electric power from the transmission network to the onsite electric l distribution system shall be supplied by two physically independent circuits (not necessarily on separate rights of way) designed and located so as to minimize to the extent practical the likelihood of their simultaneous failure under operating and postulated accident and !
environmental conditions." )
- CPS Comoliance Separate 138kV and 345 kV offsite supplies. See diagram.
- Reauirement
" Provisions shall be included to minimize the probability of losing electric power from any of the remaining supplies as a result of, or coincident with, the loss of power generated by the nuclear power unit, the loss of power from the transmission network, or the loss of power from the onsite electric power supplies."
i
, - CPS Comollance
- Both 138 kV and 345 kV safety transformers are fed independently
-} from the Illinois Power system. Loss of any one or the loss of emergency diesel generators or the CPS generator does not cause a loss of the other supplies.
Desian/Licensina Basis ccont.3 General Desian Criterion 17 - Electric Power Systems (Cont.)
hteoulroment
'One of these circuits shall be designed to be available within a few seconds following a loss of-coolant accident to assure that core cooling, containment integrity, and other vital safety functions are maintained."
- CPS Comoliance The ERAT (138kV system) and RAT (345kV system) are each capable l
- of being continuously available to supply all safety-related loads following a LOCA.
, Recent grid voltage history demonstrates that the 138kV system voltage is more constant than that of the 345kV system.
l - Reauirement l
Each of these circuits shall be designed to be available in sufficient l time following a loss of all onsite alternating current power supplies I and the other offsite electric power circuit, to assure that specified '
acceptable fuel design limits and design conditions of the reactor
! coolant pressure boundary are not exceeded. :
- CPS Compliance f
e Both the ERAT (138kV system) and RAT (345kV system) are immediate access circuits. However, if the voltage of either source is too low (such that the source may not be available following a plant trip), the source effectively becomes a delayed access circuit that can be recovered in a reasonably short period of time (i.e., well within the coping time established for a station blackout at CPS).
I l
Desian/Licensina Basis ccont.)
Technical Specification Reauirements
. TS LCO 3.8.1 requires 'two qualified circuits between the offsite transmission netwo* and the onsite Class 1E AC Electric Power Distribution System, and three diesel generators."
. With one offsite circuit inoperable, Required Action A.1 requires performing SR 3.8.1.1 for the OPERABLE offsite circuit within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, and Required Action A.2 requires restoring the inoperable offsite circuit to OPERABLE status with 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (and within 6 days from discovery of failure to meet the LCO).
- Within two offsite circuits inoperable, Required Action C.1 requires declaring required features inoperable when the redundant required features are inoperable (within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from discovery of both circuits being inoperable concurrent with inoperability of redundant features), and Required Action C.2 requires restoring one offsite circuit to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
. SR 3.8.1.1 requires verifying " correct breaker alignment and indicated power availability for each offsite circuit every 7 days."
F h
6 e
? Issue Resolution i
- Continued Compliance with Design / Licensing Basis t
6 i
I 1
i 1
)
i I
i
_ _ _ _ . .