ML20246B203

From kanterella
Revision as of 06:19, 14 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Safety Evaluation for Limitorque Motor Operators Motor W/O T-Drains
ML20246B203
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/23/1989
From: Patel S
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
Shared Package
ML20246B198 List:
References
NUDOCS 8907070237
Download: ML20246B203 (12)


Text

,

l

. 'g_.,

V SAFETY EVALUATION FOR LIMITOROUE MOTOR OPERATORS l'

MOTOR VITHOUT T-DRAIN (S) l l

1.0 PURPOSE

The purpose of this analysis is to provide documented evidence that the absence of motor "T"-Drains on the Limitorque actuators referenced below in Section 4.0 would not have jeopardized the intended function of the q actuators for the required accident / post-accident period at the Perry -

Power Plant. The actuators are exposed to the environmental parameters

.per the applicable environmental design tables B-022 series drawings.

This document will analyze the actuators for functional performance requirements (if required)taking into consideration time into accident, position in the plant, extended analysis, etc., during a Design Basis Event ~in the "as-found" condition at Perry. The analysis vill demonstrate that the omission of T-drains would not have prevented the proper actuation of the operator or have violated environmental qualification.

The Limitorque actuators have been qualified per Nuclear Regulatory Regulations, Guides and Industry Standards. The documents substantiating their qualification are provided in Perry's auditable file package i

- systems.

2.0 DESIGN INPUT

1) Perry Environmental Conditions drawing numbers B-022-004, Rev.A, B-022-006, Rev.A, B-022-002/003, Rev.A, B-022-066, Rev.A, B-022-022, Rev.A, and B-022-030, Rev.B.
2) Equipment Qualification Review List.

3.0 REFERENCES

1) Test of Limitorque valve operator to Meet General Requirements of An Electric Valve Actuator in Nuclear Reactor Containment Environment, (including Addendum #1, April 29, 1969), Report #F-C2232-01,' dated January 2,1969, Project 600198.
2) Qualification Type Test Report Limitorque Valve Actuators for Class 1E Service Outside Primary Containment In Nuclear Power Station Service, Report #B-0003, dated June 2, 1976, Project 600461.

8907070237 890623  ?

PDR ADOCK 05000440 il P PNU (

,- 7,

[. ; . . ' -

. 1 4.0: . OPERATOR LOCATION / TYPE MPL ZONE TYPE 1E12F0024B AB-4

  • AC-1 1E12F0027A AB-4 * . AC-1 1E12F0042C AB-4
  • AC-1 1E12F0073A AB-4
  • AC-1 1E22F0004- AB-8
  • AC-1 1E32F0006 AB-7 *- AC-1

? 1E32F0007 AB-7

  • AC-1 1E32F0008 AB-7
  • AC-1 1E51F0022 AB-3 DC-IG33F0001 DV-1
  • AC-1 1G61F0080 AB-4
  • AC-1 1G61F0170 'AB-4
  • AC-1

-1P57F0020B CT-3

  • AC-1
  • Inside Containment configuration.

1 5.0 OPERATORS BY ZONE AND ACCIDENT ENVIRONMENTAL PARAMETERS:

5.1 ZONE AB-4: Ref. Design Input #2 MPL NUREG-0588 FUNCTION SERVICE CATEGORY TIME 1E12F0024B c (A3) J(180 days) B PUMP TEST SUPPRESSION P001 1E12F0027A a (A1) J(180 days)~ PEN SP113 OUTBOARD.

ISOLATION f1E12F0042C a (A1) J(180 days) LPCI C PEN #P411 OUTBOARD-ISOL. PNEU.

1E12F0073A a (A1) H( 30 days) RER Hx SHELL SIDE VENT TO POOL 1G61F0080 a (A1) C( 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) CONTAINMENT ISOLATION OUTSIDE CONTAINMENT 1G61F0170 a (A1) C( 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) CONTAINMENT ISOLATION 1

OUTSIDE CONTAINMENT i

i page 2

)

V 's , .

~

~

.l m

' ACCIDENT ENVIRONMENTAL PARAMETERS: Ref. Design' Input-#1 SIGNIFICANT' DURATION TEMP. RELATIVE PRESSURE ENVIRONMENTAL EVENT DEG.F ' HUMIDITY (%)- (PSIG)- MEDIUM RHR 10" LINE NOT A DESIGN BASE ACCIDENT

-BREAK .

LOCA.IN 0 MIN TO 151 90 ATMOSPHERE AIR  !

CONTAINMENT 1 HR.

V/ EMERGENCY EQUIPMENT 1 HR. TO 123 20 ATMOSPHERE AIR' RUNNING IN 180 DAYS .

ZONE AB-4  !

't i

5.2 ZONE AB-7: Ref. Design Input #2 MPL NUREG 0588 FUNCTION SERVICE CATEGORY TIME 1E32F0006 a (A1) J(.L30 DAYS) STEAM TUNNEL ISOL. VLV.

a (A1) 1E32F0007 J(180 DAYS) STEAM TUNNEL ISOL. VLV.

1E32F0008 a (A1) J(180 DAYS) ANNULUS ISOL VLV.

ACCIDENT ENVir.DNMENTAL PARAMETERS: Ref. Design Input #1 SIGNIFICANT ' DURATION TEMP RELATIVE PRESS. ENVIRONMENTAL EVENT DEG.F HUMIDITY (PSIG) MEDIUM MAIN STEAM 0 SEC. 310 100 8.5- STEAM LINE BREAK TO 2 HRS IN ZONE'AB-7 2 HRS TO 160 100 0.0 STEAM / AIR 5 HRS 5 HRS TO 130 100 0.0 AIR 12 HRS 12 HRS T3 117 90 0.0 AIR 180 DAYS  :

LOCA INSIDE 1 HR TO 119 90 ATMOSPHERE AIR CONTAINMENT 180 DAYS 110 2O ATMOSPHERE AIR l

page 3

)

i, a

5.3- ' ZONE AB-8: Ref. Design Input #2

.MPL NUREG 0588 FUNCTION SERVICE-CATEGORY TIME 1E22F0004 ~ a (A1) D (6 HOURS) HPCS PUMP INJECTION VLV.

i ACCIDENT ENVIRONMENTAL PARAMETERS: Ref. Design Input #1 l- SIGNIFICANT DURATION TEMP RELATIVE PRESSURE ENVIRONMENTAL EVENT DEG.F HUMIDITY (%) (PSIG) MEDIUM LOCA INSIDE 1 HR TO 126 90 ATMOSPHERE AIR CONTAINMENT 6 HRS.

5.4 ZONE AB-3: Ref. Design Input #2 i

MPL NUREG 0568 FUNCTION SERVICE  !

CATEGORY TIME 1E51F0022 a (A1) E(12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />) RCIC TO CST ISOL.

ACCIDENT ENVIRONMFJITAL PARAMETERS: Ref. Design Input #1 SIGNIFICANT DURATION TEMP RELATIVE PRESSURE ENVIRONMENTAL j EVENT DEG.F HUMIDITY (PSIG) MEDIUM i RVCU BREAK- NOT A DESIGN BASE ACCIDENT l IN ZONE AB-5 I LOCA IN 1 HR TO 137 90 0.0 AIR CONTAINMENT 180 DAYS j EMERGENCY i EQUIPMENT RUNNING IN ZONE AB-3 l

5.5 ZONE DV-1: Ref. Design Input #2 l MPL NUREG 0588 FUNCTION SERVICE CATEGORY TIME 1G33F0001 a (A1) B(10 MIN) PEN #P131 INBOARD ISOL.

LRL, PNEU i

page 4

ACCIDENT ENVIRONMENTAL PARAMETERS: Ref. Design Input #1 SIGNIFICANT DURATION TEMP RELATIVE PRESSURE ENVIRONMENTAL EVENT DEG.F HUMIDITY (PhiG) MEDIUM LOCA INSIDE O SEC TO 145 90 0.0 SPRAY, CONTAINMENT 1.6 SEC. SUBMERGENCE DRYVELL (FOR 5 SEC)

(LARGE LINE 1.8 SEC. 330 GTEAM 22.1 "

BREAK) TO 8 SEC.

8 SEC. TO 250 STEAM 14.8 "

13 MIN.

13 HIN 215 100 12.0 "

TO 10 DAYS 10 DAYS 100 100 0.0 AIR TO 180 DAYS LOCA INSIDE O SEC T.0 330 STEAM 15.0 CONTAINMENT 3 HRS DRYWELL (SMALL LINE 3 HRS TO 310 STEAM 14.0 BREAK) 6 HRS 6 HRS TO 250 STEAM 10.0 30 HRS 30 HRS 238 STEAM 9.0 i TO 2 DAYS  !

2 DAYS TO 90 100 0.0 180 DAYS 5.6 ZONE CT-3: Ref. Design Input #2 MPL NUREG 0588 FUNCTION SERVICE CATEGORY TIME 1P57F0020B a (A1) I (100 days) DRYWELL ISOLATION page 5

7- '.

g c. , ,

' ACCIDENT ENVIRONMENTAL PARAMETERS: Ref. Design Input #1' SIGNIFICANT DURATION = TEMP RELATIVE PRESSURE ENVIRONMENTAL-EVENT DEG.P HUMIDITY (PSIG) MEDIUM LOCA INSIDE O SEC. TO 98' 100 8.8. AIR, SPRAY, CONTAINMENT 6 SEC. SUBMERGENCE

6 SEC. TO 125 100 7.3 "

L 100 SEC. 100 SEC. "

165 100 10.3 TO 30 MIN.

30 MIN TO 184.6 100 12.0 "

3 HRS.

1 littS TO 160 100 6.3 "

10 DAYS 10 DAYS 90 100 0.0 "

TO 180 DAYS 6.0 - ANOMALIES / SIMILARITIES The following section evaluates the anomalies / similarities in the reference reports 600198 and 600461 for their possible impact on Perry's

~

E0 program. A statement of similarity vill first be made to contain a

. synopsis of the operator tested to see if it encompasses the entire family of Limitorque' Actuators at the Perry Plant. This will then be followed by the discussion of the anomalies. The reference' reports identify the anomalies which vere encountered during the type test program. The concern at Perry revolves around the' anomalies directed towards the qualification of the Limitorque operator as to having a possible impact on the justification provided herein for the missing motor.T-Drain (s),

including the operability of the MOVLfor last 18-months. Subsequent to each anomaly, a justification has been provided for any impact on specific

. requirements of Perry.

6.1 STATEMENT OF SIMILARITY j All Limitorque actuators are essentially equivalent, with differences limited to cover material changes, electrical component differences (including motors, terminal blocks, torque switch and limit switch materials), and the use of motor Y-Drain (s) and actuator grease-relief valves.

  • The equipment tested in the reference 1 report #600198 was (a) a Limitorque valve operator and (b) a motor-brake assembly as identified belovt page 6

. 1

^

6' * '.? -

l, _

c .; .;,

a)'Name Plate Information of Valve Operator' 1 Name: SMB-0 l Manufacturer: . Philadelphia Gear Corporation-

~ -Motor: Reliance / Rad H. insulation R

Start: 15 ft.-lb. 1 Run:'3 ft.-lb. (Temp. rise: 75 deg.C)

Voltage:- Dual-230/460, AC Phase: 3 RPM: 1700 j i

b) Torque Motor With Brake: (N/A-not utilized at Perry)

  • The equipment tested in the-reference 2 report #600461 was (a) a- -l Limitorque valve operator, (b) one test motor #1 and'(c) one testimotor:

'#2 as identified below:

a) Name Plate Information Of Valve Operator Name: SMB-0 Manufacturer Limitorque Corp.

Motor: Reliance / Class B insulation Starts 25 ft.-lb.

Run: 5 ft.-lb. (Temp. rise: 75 deg.C)

' Voltage: Dual-230/460, AC Phase: 3 RPM: 1700 b) Test Motor _#1

, Motor: Reliance / Class B insulation Starts 25 ft.-lb.

Run: '5 ft.-lb. (Temp rise: 75 deg.C)

Voltage: Dual-230/460 Phase: 3 RPM: 1700

'c): Test Motor'#2 Motor: Electric. Apparatus / Class B insulation

Start: 40 ft.-lb.

Run: 8 ft.-lb. (Temp. rise: 75 deg.C)

Voltage: Dual-220/440 Phase: 3 RPM: 1705 The size SMB-0 actuator is an average mid-size unit, which was used to generically qualify all sizes of Limitorque operators for the environmental test conditions in accordance with the IEEE-Standards.

Based on.the successful qualification testing of SMB-0 actuator, all other sizes of the type SMB, SB, SBD and SMB/HBE are also deemed qualified. The Limitorque actuators at the Perry are also enveloped as defined by the above-criteria.

page 7

_ ___:---_-__. - _ = -

l. .

V 6.2 ' DISPOSITION OF ANOMALIES IN REPORT NO. 600198 (ref.1) a) Description of Anomaly:

The geared limit switch frame had been attacked by the boric acid in the steam environment. This caused the gear frame to corrode and resulted in binding up of the shafts of the geared limit switch where they extend through the geared limit switch housing. This caused the premature failure of the geared limit switch.

Justification of Anomaly:

The anomaly noted above is not applicable to Perry, since the subject motor operators at Perry utilizes bronze housing. Note that, the original 600198 test was unsuccessful when an aluminum housing was  :

utilized. The subsequent Addendum #1 testing utilized the bronze housing. The new geared limit svitch successfully completed the seven day test with no sign of wear or deterioration due to the steam pressure, temperature or chemical environment.

h) Description of Anomaly:

Recorded pressure variation in chamber pressure upon reaching the 90 psig level caused by a leak in the pressure Transducer.

Justification of Anomaly: i The anomaly has no bearing on the successful performance of the l actuator, since it is evident from figure 4 of the report that the limit switch compartment pressure recorder noted 90 psig indicating the steady state condition (i.e. pressure equalization). In addition, the chamber pressure is a function of the temperature which indicated the pressure at the saturation temperature to be around 90 psig.

6.3 DISPOSITION OF ANOMALIES IN REPORT NO. 600461 (ref. 2) a) Description of Anomaly:

During the environmental type test, the actuator overran the open limit.

page 8

e y

~ .

c, ; ...s

, Justification of Anomaly:

The. anomaly noted above is not applicable to Perry since the actuator-

. overrun did.not" occur-before or after the test.- It was believed a'.

momentary.short was caused by localized condensation. Normally the torque switch would have prevented this, but it was not utilized in the test. Perry's actuators utilize the torque switch for opening or

' closing'and therefore, poses no concern.

Note that, as previously mentioned, the documents substantiating the qualification of the actuators for the subject. report are provided in Perry's auditable. file package systems.

7.0 DISCUSSION / ANALYSIS

~ ~

The intent of this analysis is not to demonstrate the actuator's qualification but to adequately address the fact that the omission of T-drains wouldfnot have prevented proper actuator operation or violate environmental qualification. This report will.further substantiate the actuator's performance in the vorst case Design Basis Event environmental conditions without the motor T-drains.

The principal purposes for use of the T-drains are,-1) to provide drainage of internal' actuator condensation; and 2) to serve.as.the primary vehicle

.for internal-to-external actuator pressure equalization. The. presence of the T-drain (s) vill assure accomplishment of the aforementioned function.

However, it should be noted that Limitorque has successfully tested a

. valve operator under a simulated accident / post accident steam and chemical environment without utilizing'T-drains (References 1 & 2). The successful testing further substantiates the fact that the Limitorque' operator motor, by virtue of;its design, is capable of delivering the necessary torque for the. required actuator operation during a Design Basis Event.

Having established the qualification testing of the actuator without ,

T-drains, the DBE operability analysis for the operators found without i T-drains vill be discussed. The operator "MPL's" are segregeted by the zones and listed in section 5.0 above along with the NUREG 0588 Equipment Category, Function Time, service and the DBE Environmental parameters.

7.1 OPERATORS LOCATED IN ZONE AB-4: (see section 5.1)

The omission of the notor T-drains does not invalidate the operator's environmental qualification since 90% relative humidity level is not severe enough to produce significant amount of condensate. For the " Post DBE" functional requirement of'the equipment in this zone, no steam environment is anticipated in the area zone, Steam conditions prevail only during the'RHR 10" line break in the aux. building, which is not the Design Base Accident. None of the subject valves are required or vill automatically change position upon detection of the 10" line break. The zone environment is enveloped by the Limitorque Qualification for Outside Containment (ref.2), which requires no T-drains. The operator 1E12F0024B l

page 9


,-,,,,----,--,,,---,-,-,--,-r_ - - - , - - -

. + ~q)> ////bo o h4*'% IMAGE EVALUATION ///gj d%

gr gj +gk/ TEST TARGET (MT-3) x ,,[)4 ;p&

y,, & /4, e je  ;

+

s8*

a, ,s%,

sp 1//,

/ fb e/h m

O, , ++$ge$ +

t Y: - _ _

. .. j 3s listed as category c (NUREG-0588) and has no functional requirement. )

-Long time operability for the subject operator does not pose an E0 concern j due to the absence of condensate / steam environment. )

l 7.2 OPERATORS lhCATED IN ZONE AB-7: (see section 5.2)

Per Reference 1, Limitorque test report no. 600198, dated 01-02-1969, the operator with a Rad H insulation motor without T-drains was subjected to DBA test. The testing lasted for seven days. The Valve operator operated satisfactorily during and after the environmental test. It was also noted in the above test report that a 9-hour preliminary steam test 1 was performed by piping live steam into the conduit taps on the top of the limit switch compartment. One of the bottom conduit taps was left open to drain off any condensate. The motor compartment, however, did not have T-Drains. This configuration would allow steam to enter the bell housing, but not allow drainage of condensate from the motor. Note that the plugs were installed for all testing done other than this 9-hour preliminary steam test. The report indicates that the existence of moisture inside the unit did not prevent adequate actuator performance.

The subject valves are'each normally closed but will be opened by operator action from the control room 20 minutes after a LOCA inside containment if the inboard MSIV leakage control (E32) subsystem or inboard MSIV does not operate properly. The valve operators must be capable of surviving a steam line break in the non-safety portion of the main steam lines at the far end of the steam tunnel in order to be operable after the 20 minute time period. Note that with the Main Steam Line Break in the steam tunnel as the only event, the E32 system function is not required. The significant event of the MSLB in the subject zone vill generate high temperature and pressure and 100% Relative Humidity / Steam conditions. The LOCA inside containment will generate only high radiation condition.

Assuming that the operators have to be opened to mitigate the aforementioned concurrent events, the duration of 20 minutes is too short to produce a significant amount of condensate that would prevent the motor operator from performing its safety function. Furthermore, as stated above, Limitorque successfully tested the motor operator even in presence of live steam for a period of 9-hours. Long time operability for the subject valves during LOCA inside containment does not pose an E0 concern since 90% relative humidity is not severe enough to produce a significant

+

amount of condensate in this zone.

7.3 OPERATOR LOCATED IN ZONE AB-8: (See section 5.3)

The absence of the motor T-drains does not invalidate the operators' environmental qualification since 90% relative humidity will not produce significant amount of condensate. Regarding the " Post DBE" functional requirement for the operator in this zone, no steam is anticipated in the area zone. The post-accident environment is enveloped by the Limitorque report for Outside Containment (ref.2), which requires no T-drains. The omission of T-drains vould therefore not have prevented the motor operator from performing its intended safety function. Long time operability for the subject operator does not pose an EQ concern due to the absence of condensate or steam environment.

l page 10

~,

a: :. , . -

L 7.4 . OPERATOR 1ACATED IN ZONE AB-3: (see section 5.4) l The subject motor operator is located in the test return line to the condensate storage tank. A design flow functional test of the RCIC system is performed during normal plant operation by drawing suction from

.the condensate storage tank and discharging through the full flow test return.line back to the condensate storage tank. The valve remains open

'during the testing mode. However, if the RCIC system requires initiation while in the test mode, the control system automatically returns to the operating mode. During this phase of operation, the subject valve has to be closed for the system to deliver the rated flow to the reactor within the required 30 seconds. The omission of the motor T-drain does not invalidate the operators environmental qualification since 90% relative humidity is not severe enough to produce a significant amount of condensate within 30 seconds. Furthermore, the " Post DBL" environment for this zone does not experience steam conditions. Steam conditions prevail in this zone only during the RUCU line break in zone AB-5, which is not the Design Base Accident. The zone environment is enveloped by the referenced Limitorque Qualification reports which did not utilfze T-drains. It is therefore concluded that the absence of the motor T-drain from the subject operator would not have jeopardized proper actuator operation or violate environmental qualification.

7.5 OPERATOR LOCATED IN ZONE DV-1: (see section 5.5)

The subject operator is an inboard isolation valve and is required to close upon receipt of isolation signal. The motor operator has to accomplish this function vithin 15 seconds into LOCA and remain close for the required period of 10 minutes. The duration of 10 minutes (max) into the accident with high temperature and pressure and a steam environment is too short to produce a significant amount of condensate that would prevent the operator from performing its safety related function. Furthermore, Limitorque Report 600198 (ref.1) documents the accident testing conducted on a Limitorque operator which did not have T-drains installed in the motor. The test was performed at a peak temperature and pressure of 329 deg.F and 90 psig, respectively. These parameters envelop Perry's dryvell peak' conditions. In addition, the Limitorque test included saturated steam and chemical spray which allowed moisture to enter the motor compartment and still. functioned during DBA conditions. This discussion provides further evidence that the absence of the T-drains would not have prevented the operator from performing its safety function or have violated environmental qualification.

7.6 OPERATOR LOCATED IN ZONE CT-3: (see section 5.6)

The motor operator 1P57F0020B is a safety-related instrument air system valve. Manual switches with status lights are provided in the Control Room for closing this valve if needed during LOCA. This valve has no automatic isolation signal and must be operated manually. It acts as a system isolation valve and is located inside containment in the subject zone (Note that the valve is not a Containment Isolation Valve). This valve is normally open and is required to remain open Post-LOCA. If for page 11

=*^

. * , l any' reason this valve vas shut when a LOCA occurred, it would be required
V 'to open the valve for up to 100 days Post-DBE. For the " Post-DBE" functional requirement of the equipment in this zone, no steam environment h is anticipated in the' area zone. Limitorque documents testing in.

reference 1_ report no.600198, where a 9-hour preliminary steam test was performed by piping live steam into the limit switch compartment through-the upper conduit taps and draining any condensate via an open bottom conduit taps. .The report indicates that the existence of-moisture inside the unit did.not prevent adequate actuator performance. The tested-configuration therefore, represents the vorst case condition in comparison to the 'no steam' environment in this zone. Furthermore, the operator motor utilizes Reliance RH insulation which is considered far.

more superior than the Rad H class insulation used in the Limitorque testing. This further substantiates the fact that the operator motor, by the virtue of its design, vould not have prevented the operator from performing its safety function. .In addition, this actuator is configured such that the. limit switch compartment is lover than the motor. A T-Drain was installed in the bottom conduit taps of the limit switch compartment, which would allow drainage of condensation.

8.0 CONCLUSION

Based on the analysis and the documented evidence presented herein, it is concluded that the omission of the motor T-drains did not invalidate the environmental qualification of the operators and that the operators, when subjected to the vorst case DBE environmental parameters in the respective zones at Perry, vill perform the required safety function. However, motor T-drains have been installed as recommended by Limitorque to put the operators into the "as tested" configuration.

Prepare by /0/ /

. C. Patel Date Approved by <d #

/b '

3

/ S. V. Li hfield Dat'e' 1

1 e

page 12

i. _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ ,