Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20196A195 | 17 June 1999 | Instrument Drift Analysis | |
ML20196B877 | 16 December 1996 | First Amended & Restated Master Decommissioning Trust Agreement Dtd as of 961231 Between Toledo Edison Co & Mellon Bank | |
ML20196B895 | 16 December 1996 | First Amended & Restated Master Decommissioning Trust Agreement Dtd as of 961216 Between Cleveland Electric Illuminating Co & Mellon Bank | |
ML20134H219 | 18 October 1996 | Application of Acoustic Methodology for Evaluation of Submerged Structures on Mark III Large Passive ECCS Suction Strainer | Hydrostatic |
ML20115J983 | 30 June 1996 | Individual Plant Examination of External Events for Severe Accident Vulnerabilities for Pnpp | Safe Shutdown High winds Fire Barrier Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Emergency Lighting Tornado Generated Missile Seismically rugged Exemption Request Earthquake Fire Protection Program Fire Watch Backfit Weak link |
PY-CEI-NRR-2076, Rev 2 to Nonproprietary Version of Controlled Copy of Dose Calculation Data Base for Application of Revised DBA Source Term to CEI Pnpp | 14 June 1996 | Rev 2 to Nonproprietary Version of Controlled Copy of Dose Calculation Data Base for Application of Revised DBA Source Term to CEI Pnpp | |
ML20128L561 | 10 April 1996 | Safety Evaluation Summary Per 10CFR50.59(B)(2) 1994-1996 | Safe Shutdown Packing leak Grab sample Offsite Dose Calculation Manual Fire Barrier Stroke time Tornado Missile Hydrostatic Past operability Fire impairment Nondestructive Examination Temporary Modification Emergency Lighting Feedwater Controller Failure Turbine Missile Fire Protection Program Weak link Unidentified leakage Failure to Scram |
ML20100G011 | 1 February 1996 | Rev 0 to Pnpp EALs Bases Document | Safe Shutdown Time of Discovery High winds Ultimate heat sink Offsite Dose Calculation Manual Earthquake Offsite Circuit Power change Unidentified leakage |
ML20101M985 | 8 August 1995 | Analytical Rept | |
ML20113D169 | 24 July 1995 | Pyrolysis Gas Chromatography Analysis of 5 Thermo-Lag Fire Barriers Samples | Safe Shutdown Fire Barrier |
ML20083C030 | 27 April 1995 | GE Numac Leak Detection Sys Seismic Analysis Summary, for DCP 87-0725 | |
ML20196B787 | 21 April 1995 | Pennsylvania Power Co Master Decommissioning Trust Agreement for Beaver Valley Power Station & Perry Nuclear Power Plant | |
ML20083C019 | 3 March 1995 | GE Numac Leak Detection Sys Emi/Rfi Analysis Rept, for DCP 87-0725 | |
ML20073E968 | 26 September 1994 | Course of Action Progress Rept | Reactor Vessel Water Level High Radiation Area Coatings Temporary Modification Maintenance Rule Program Scaffolding |
ML20210J873 | 7 April 1994 | Detoxification of Clam-Trol CT-4 & CT-1:Daphnia Magna Bioassays | |
ML20059M611 | 15 November 1993 | Rev 0 to Perry Nuclear Power Plant Course of Action | |
ML20196B850 | 1 July 1993 | Ohio Edison Co Master Decommissioning Trust Agreement for Perry Nuclear Power Plant Unit One,Perry Nuclear Power Plant Unit Two,Beaver Valley Power Station Unit One & Beaver Valley Power Station Unit Two | |
ML18010B084 | 5 May 1993 | NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. | Safe Shutdown Boric Acid Shutdown Margin Loop seal Stroke time Temporary Modification Stress corrosion cracking Liquid penetrant Overspeed trip |
ML18010A952 | 30 November 1992 | NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. | Nondestructive Examination Liquid penetrant |
ML20101J982 | 19 June 1992 | Five-Yr Plan | |
ML20096A892 | 8 May 1992 | Rev 0 to Evaluation of Flaw Indication(S) in Perry Feedwater Nozzle to Safe-End Welds, Summary Technical Rept | |
PY-CEI-NRR-1463, Rev 0 to Evaluation of Flaw Indications in Perry FW Nozzle to Safe-End Welds Extrapolated Beyond RF0-3 | 14 February 1992 | Rev 0 to Evaluation of Flaw Indications in Perry FW Nozzle to Safe-End Welds Extrapolated Beyond RF0-3 | |
ML20092A439 | 31 January 1992 | Rev 0 to N71 Pipe Rupture Evaluation | Finite Element Analysis Scram Discharge Volume |
ML20077G626 | 28 June 1991 | Simulation Facility Certification | |
ML20070Q512 | 7 March 1991 | Rev 1 to Evaluation of Indications in Perry Feedwater Nozzle-to-Safe-End Welds, Summary Technical Rept | |
ML20246B203 | 23 June 1989 | Safety Evaluation for Limitorque Motor Operators Motor W/O T-Drains | Boric Acid |
PY-CEI-NRR-0835, Motor Valve Testing & Evaluatiion at Perry Nuclear Power Plant (IE Bulletin 85-003) | 31 March 1988 | Motor Valve Testing & Evaluatiion at Perry Nuclear Power Plant (IE Bulletin 85-003) | Stroke time Hydrostatic |
ML20149F993 | 29 January 1988 | Final Rept,Msiv Solenoid Valve Failure,Analytical Chemistry Results | |
ML20155K139 | 30 December 1987 | Final Rept MSIV 3-Way Dual Solenoid Valve Failures | Half scram Grab sample Stroke time |
ML20205N709 | 23 March 1987 | Draft GE Record in Nuclear Safety:Independent Study of GE Nuclear Control & Implementation Dept Based on Records of SA Milam & Nrc. NRC Lists of Documentation Examined & Related Info Encl | Safe Shutdown Reactor Vessel Water Level Loctite |
ML20212G746 | 7 January 1987 | Rept of Emergency Evacuation Review Team on Emergency Response Plans for Perry & Davis-Besse Nuclear Power Plants | Probabilistic Risk Assessment Earthquake Chernobyl |
ML20202F339 | 31 July 1986 | Control Room Validation Summary Rept | Pressure Boundary Leakage Failure to Scram |
ML20203G117 | 29 July 1986 | Analysis of Mode of Ignition & Combustion Propagation for Both Charcoal Adsorber Bed Combustion Events | |
ML20203G122 | 29 July 1986 | Metallurgical Analysis of Offgas Sys Adsorber Bed Vessels | Hydrostatic |
ML20203G156 | 29 July 1986 | Description of Testing Methods to Verify Adequacy of Offgas Vault Refrigeration & Processing Sys. W/19 Photographs of Offgas Sys Components & Recovery Activities.Attachment 2 Contains 25 Oversize Graphs of N-64 Offgas Sys Event | |
ML20203G093 | 29 July 1986 | Analysis of Physical & Chemical Properties of Original & Replacement Activated Carbon | |
ML20203G088 | 29 July 1986 | General Description & Background of Offgas Sys | Loop seal |
ML20203G133 | 29 July 1986 | Description of Charcoal Removal,Sys Drying & Replacement Carbon Installation Activities | Hydrostatic |
ML20203G079 | 28 July 1986 | Unit 1 Offgas Sys Charcoal Adsorber Combustion Events Final Rept | Hydrostatic Scaffolding |
PY-CEI-NRR-0478, Rev 0 to Deep Well Injection at Calhio Wells & Leroy,Oh Earthquake of 860131 | 10 June 1986 | Rev 0 to Deep Well Injection at Calhio Wells & Leroy,Oh Earthquake of 860131 | Earthquake |
ML20204F664 | 28 May 1986 | Rev 1 to Environ Qualification Rept of Two Duct Sealants | |
ML20198J314 | 20 May 1986 | Suppl 2 to Dcrdr Summary Rept | |
ML20198D550 | 30 April 1986 | Cleveland Electric Illuminating Co,Perry Power Plant Confirmatory Program of 860131 Ohio Earthquake Effect, Progress Rept | Earthquake |
ML20203N417 | 30 April 1986 | Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications | Nondestructive Examination Liquid penetrant |
ML20203G541 | 24 April 1986 | Emergency Instruction Validation Summary Rept | |
ML20117E810 | 31 March 1986 | Results of Atmospheric Tracer Study within Bldg Complex at Pnpp | |
ML20210T580 | 25 February 1986 | Spectral Analysis of Perry Nuclear Power Plant Velocity- Time Histories Resulting from Ohio Earthquake | Earthquake |
ML20151T952 | 3 February 1986 | ML 5.0 Earthquake,860131,Strong-Motion Data from Perry Nuclear Power Plant Seismic Instrumentation | Earthquake |
ML20138A949 | 1 November 1985 | Rev 1 to Environ Analysis of Silicone Rubber Boot Seals | |
ML20133K888 | 14 October 1985 | Suppl 1 to Dcrdr Summary Rept | Post Accident Monitoring Emergency Lighting Scram Discharge Volume Operability Assessment |