Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML20196A1951999-06-17017 June 1999 Instrument Drift Analysis ML20196B8771996-12-16016 December 1996 First Amended & Restated Master Decommissioning Trust Agreement Dtd as of 961231 Between Toledo Edison Co & Mellon Bank ML20196B8951996-12-16016 December 1996 First Amended & Restated Master Decommissioning Trust Agreement Dtd as of 961216 Between Cleveland Electric Illuminating Co & Mellon Bank ML20134H2191996-10-18018 October 1996 Application of Acoustic Methodology for Evaluation of Submerged Structures on Mark III Large Passive ECCS Suction Strainer ML20115J9831996-06-30030 June 1996 Individual Plant Examination of External Events for Severe Accident Vulnerabilities for PNPP ML20115A3621996-06-28028 June 1996 IPE of External Events for Severe Accident Vulnerabilities for PNPP PY-CEI-NRR-2076, Rev 2 to Nonproprietary Version of Controlled Copy of Dose Calculation Data Base for Application of Revised DBA Source Term to CEI Pnpp1996-06-14014 June 1996 Rev 2 to Nonproprietary Version of Controlled Copy of Dose Calculation Data Base for Application of Revised DBA Source Term to CEI Pnpp ML20128L5611996-04-10010 April 1996 Safety Evaluation Summary Per 10CFR50.59(B)(2) 1994-1996 ML20100G0111996-02-0101 February 1996 Rev 0 to PNPP EALs Bases Document ML20101M9851995-08-0808 August 1995 Analytical Rept ML20113D1691995-07-24024 July 1995 Pyrolysis Gas Chromatography Analysis of 5 Thermo-Lag Fire Barriers Samples ML20083C0301995-04-27027 April 1995 GE Numac Leak Detection Sys Seismic Analysis Summary, for DCP 87-0725 ML20196B7871995-04-21021 April 1995 Pennsylvania Power Co Master Decommissioning Trust Agreement for Beaver Valley Power Station & Perry Nuclear Power Plant ML20083C0191995-03-0303 March 1995 GE Numac Leak Detection Sys Emi/Rfi Analysis Rept, for DCP 87-0725 ML20073E9681994-09-26026 September 1994 Course of Action Progress Rept ML20210J8731994-04-0707 April 1994 Detoxification of Clam-Trol CT-4 & CT-1:Daphnia Magna Bioassays ML20059M6111993-11-15015 November 1993 Rev 0 to Perry Nuclear Power Plant Course of Action ML20196B8501993-07-0101 July 1993 Ohio Edison Co Master Decommissioning Trust Agreement for Perry Nuclear Power Plant Unit One,Perry Nuclear Power Plant Unit Two,Beaver Valley Power Station Unit One & Beaver Valley Power Station Unit Two ML18010B0841993-05-0505 May 1993 NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216 ML18010A9521992-11-30030 November 1992 NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216 ML20101J9821992-06-19019 June 1992 Five-Yr Plan ML20096A8921992-05-0808 May 1992 Rev 0 to Evaluation of Flaw Indication(S) in Perry Feedwater Nozzle to Safe-End Welds, Summary Technical Rept PY-CEI-NRR-1463, Rev 0 to Evaluation of Flaw Indications in Perry FW Nozzle to Safe-End Welds Extrapolated Beyond RF0-31992-02-14014 February 1992 Rev 0 to Evaluation of Flaw Indications in Perry FW Nozzle to Safe-End Welds Extrapolated Beyond RF0-3 ML20092A4391992-01-31031 January 1992 Rev 0 to N71 Pipe Rupture Evaluation ML20077G6261991-06-28028 June 1991 Simulation Facility Certification ML20070Q5121991-03-0707 March 1991 Rev 1 to Evaluation of Indications in Perry Feedwater Nozzle-to-Safe-End Welds, Summary Technical Rept ML20246B2031989-06-23023 June 1989 Safety Evaluation for Limitorque Motor Operators Motor W/O T-Drains ML20235A9781988-12-20020 December 1988 Recent & Historic Seismicity in Northeastern Ohio: Reactivation of Precambrian Faults & Role of Deep Fluid Injection PY-CEI-NRR-0835, Motor Valve Testing & Evaluatiion at Perry Nuclear Power Plant (IE Bulletin 85-003)1988-03-31031 March 1988 Motor Valve Testing & Evaluatiion at Perry Nuclear Power Plant (IE Bulletin 85-003) ML20149F9931988-01-29029 January 1988 Final Rept,Msiv Solenoid Valve Failure,Analytical Chemistry Results ML20155K1391987-12-30030 December 1987 Final Rept MSIV 3-Way Dual Solenoid Valve Failures ML20205N7091987-03-23023 March 1987 Draft GE Record in Nuclear Safety:Independent Study of GE Nuclear Control & Implementation Dept Based on Records of SA Milam & Nrc. NRC Lists of Documentation Examined & Related Info Encl ML20212G7461987-01-0707 January 1987 Rept of Emergency Evacuation Review Team on Emergency Response Plans for Perry & Davis-Besse Nuclear Power Plants ML20202F3391986-07-31031 July 1986 Control Room Validation Summary Rept ML20203G0931986-07-29029 July 1986 Analysis of Physical & Chemical Properties of Original & Replacement Activated Carbon ML20203G1171986-07-29029 July 1986 Analysis of Mode of Ignition & Combustion Propagation for Both Charcoal Adsorber Bed Combustion Events ML20203G1331986-07-29029 July 1986 Description of Charcoal Removal,Sys Drying & Replacement Carbon Installation Activities ML20203G1221986-07-29029 July 1986 Metallurgical Analysis of Offgas Sys Adsorber Bed Vessels ML20203G0881986-07-29029 July 1986 General Description & Background of Offgas Sys ML20203G1561986-07-29029 July 1986 Description of Testing Methods to Verify Adequacy of Offgas Vault Refrigeration & Processing Sys. W/19 Photographs of Offgas Sys Components & Recovery Activities.Attachment 2 Contains 25 Oversize Graphs of N-64 Offgas Sys Event ML20203G0791986-07-28028 July 1986 Unit 1 Offgas Sys Charcoal Adsorber Combustion Events Final Rept PY-CEI-NRR-0478, Rev 0 to Deep Well Injection at Calhio Wells & Leroy,Oh Earthquake of 8601311986-06-10010 June 1986 Rev 0 to Deep Well Injection at Calhio Wells & Leroy,Oh Earthquake of 860131 ML20204F6641986-05-28028 May 1986 Rev 1 to Environ Qualification Rept of Two Duct Sealants ML20198J3141986-05-20020 May 1986 Suppl 2 to Dcrdr Summary Rept ML20198D5501986-04-30030 April 1986 Cleveland Electric Illuminating Co,Perry Power Plant Confirmatory Program of 860131 Ohio Earthquake Effect, Progress Rept ML20203N4171986-04-30030 April 1986 Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications ML20203G5411986-04-24024 April 1986 Emergency Instruction Validation Summary Rept ML20117E8101986-03-31031 March 1986 Results of Atmospheric Tracer Study within Bldg Complex at Pnpp ML20210T5801986-02-25025 February 1986 Spectral Analysis of Perry Nuclear Power Plant Velocity- Time Histories Resulting from Ohio Earthquake ML20151T9521986-02-0303 February 1986 ML 5.0 Earthquake,860131,Strong-Motion Data from Perry Nuclear Power Plant Seismic Instrumentation 1999-06-17
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEAR05000440/LER-1999-004, :on 990916,loss of Safety Function Resulted in TS 3.0.3 Entry.Caused by Design Deficiency in Control Complex Architectural Walls.Revised Storm Contingencies Instructions.With1999-10-18018 October 1999
- on 990916,loss of Safety Function Resulted in TS 3.0.3 Entry.Caused by Design Deficiency in Control Complex Architectural Walls.Revised Storm Contingencies Instructions.With
ML20217K1231999-10-14014 October 1999 Revised Positions for DBNPS & PNPP QA Program ML20212J2011999-09-30030 September 1999 Safety Evaluation Supporting Transfer of Dl Ownership Interest in PNPP to Ceico PY-CEI-NRR-2437, Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With 05000440/LER-1999-003-01, :on 990218,post-accident Dose Limits Were Exceeded.Caused by Relief Valve Leakage Outside of Containment.Removed Relief Valve on 990913,by Design Change Package Implemented Under 10CFR50.59.With1999-09-27027 September 1999
- on 990218,post-accident Dose Limits Were Exceeded.Caused by Relief Valve Leakage Outside of Containment.Removed Relief Valve on 990913,by Design Change Package Implemented Under 10CFR50.59.With
PY-CEI-NRR-2429, Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With ML20212A6881999-08-31031 August 1999 Safety Evaluation Supporting Amend 106 to License NPF-58 PY-CEI-NRR-2424, Monthly Operating Rept for July 1999 for Perry Npp.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Perry Npp.With ML20210J3851999-07-28028 July 1999 PNPP - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval PY-CEI-NRR-2416, Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With ML20196A1951999-06-17017 June 1999 Instrument Drift Analysis ML20207G2741999-06-0707 June 1999 Safety Evaluation Concluding That Firstenergy Flaw Evaluation Meets Rules of ASME Code & That IGSCC & Thermal Fatigue Crack Growth Need Not Be Considered in Application PY-CEI-NRR-2409, Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With PY-CEI-NRR-2393, Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be Explored1999-05-12012 May 1999 Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be Explored ML20206G6451999-05-0303 May 1999 Safety Evaluation Authorizing Requests for Relief IR-032 to IR-035 & IR-037 to IR-040 Re Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp PY-CEI-NRR-2399, Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With ML20206E2261999-04-29029 April 1999 Safety Evaluation Concluding That Proposed Alternatives Will Result in Acceptable Level of Quality & Safety.Authorizes Use of Code Case N-504 for Weld Overlay Repair of FW Nozzle Weld at PNPP & Use of Table IWB-3514 05000440/LER-1999-002-01, :on 990327,RHR a Pump Failed to Start & LCO 3.0.3 Was Entered Due to TS Bases Misinterpretation.Caused by Failed Optical Isolator That Provided Signal to Pump Start Permissive Circuitry.Subject Circuitry Was Replaced1999-04-26026 April 1999
- on 990327,RHR a Pump Failed to Start & LCO 3.0.3 Was Entered Due to TS Bases Misinterpretation.Caused by Failed Optical Isolator That Provided Signal to Pump Start Permissive Circuitry.Subject Circuitry Was Replaced
ML20206D7911999-04-23023 April 1999 Rev 6 to PDB-F0001, COLR for Pnpp Unit 1 Cycle 8,Reload 7 05000440/LER-1999-001-01, :on 990317,discovered That Control Complex Bldg Architectural Walls Were Not Included in Tornado Dp Loading Design.Caused by Failure to Consider Tornado Dp Loads. Compensatory Measures Were Implemented.With1999-04-16016 April 1999
- on 990317,discovered That Control Complex Bldg Architectural Walls Were Not Included in Tornado Dp Loading Design.Caused by Failure to Consider Tornado Dp Loads. Compensatory Measures Were Implemented.With
ML20205P4371999-04-15015 April 1999 Safety Evaluation Concluding That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking or Thermal Binding ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected PY-CEI-NRR-2389, Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With ML20205G4221999-03-31031 March 1999 Safety Evaluation Accepting Second 10-yr Interval IST Program Releif Requests for Plant,Unit 1 ML20206D8461999-03-31031 March 1999 Rev 1 to J11-03371SRLR, Supplemental Reload Licensing Rept for Pnpp,Unit 1 Reload 7 Cycle 8 ML20205S0601999-03-31031 March 1999 Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331 ML20205E0591999-03-26026 March 1999 Safety Evaluation Supporting Amend 105 to License NPF-58 ML20205D3101999-03-26026 March 1999 Safety Evaluation Supporting Amend 103 to License NPF-58 ML20205D6921999-03-26026 March 1999 Safety Evaluation Supporting Amend 104 to License NPF-58 ML20205C3761999-03-26026 March 1999 Safety Evaluation Supporting Request for Proposed Exemption to 10CFR50,app a GDC 19 ML20204C0711999-03-11011 March 1999 Safety Evaluation Supporting Amend 102 to License NPF-58 ML20207F4361999-03-0303 March 1999 Safety Evaluation Supporting Amend 101 to License NPF-58 PY-CEI-NRR-2369, Special Rept:On 990127,PAMI Was Declared Inoperable.Caused by Low Resistance Reading Existing in Circuit That Goes to Drywell.Troubleshooting of Affected Cable Will Commence During RFO on 9902271999-03-0303 March 1999 Special Rept:On 990127,PAMI Was Declared Inoperable.Caused by Low Resistance Reading Existing in Circuit That Goes to Drywell.Troubleshooting of Affected Cable Will Commence During RFO on 990227 PY-CEI-NRR-2372, Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With ML20207L4881999-02-24024 February 1999 Safety Evaluation Supporting Amend 100 to License NPF-58 ML20203F8381999-02-0808 February 1999 Safety Evaluation Supporting Amend 97 to License NPF-58 ML20203A5961999-02-0202 February 1999 Safety Evaluation Accepting Licensee Proposed Revs to Responsibilities of Plant Operations Review Committee as Described in Chapter 17.2 of USAR ML20203A5211999-01-27027 January 1999 Safety Evaluation Accepting Licensee Calculations Showing That Adequate NPSH Will Be Available for HPCS Pumps ML20198R8921999-01-0707 January 1999 SER Accepting Licensee Proposed Amend to TSs to Delete Reference to NRC Policy Re Plant Staff Working Hours & Require Administrative Controls to Limit Working Hours to Be Acceptable ML20206B0101998-12-31031 December 1998 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for Fiscal Yr Ending 981231,encl ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 PY-CEI-NRR-2356, Monthly Operating Rept for Dec 1998 for Perry Nuclear Power Plant,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Perry Nuclear Power Plant,Unit 1.With ML20198J0031998-12-22022 December 1998 SER Accepting Licensee Response to GL 92-08,ampacity Derating Issues for Perry Nuclear Power Plant,Unit 1 ML20198K9071998-12-21021 December 1998 Safety Evaluation Supporting Amend 96 to License NPF-58 ML20196J4731998-12-0202 December 1998 Safety Evaluation Supporting Amend 95 to License NPF-58 PY-CEI-NRR-2346, Monthly Operating Rept for Nov 1998 for Perry Nuclear Power Plant,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Perry Nuclear Power Plant,Unit 1.With ML20196D2751998-11-23023 November 1998 Safety Evaluation Supporting Amend 94 to License NPF-58 ML20195F6891998-11-0505 November 1998 Safety Evaluation Accepting Proposed Reduction in Commitment in Quality Assurance Program to Remove Radiological Assessor Position 05000440/LER-1998-003, :on 981001,missed TS SR on H Igniters Was Noted.Caused by Personnel Error.Missed Surveillance Was Performed on Day of Discovery of Item & Function of H Igniters Were Verified.With1998-11-0202 November 1998
- on 981001,missed TS SR on H Igniters Was Noted.Caused by Personnel Error.Missed Surveillance Was Performed on Day of Discovery of Item & Function of H Igniters Were Verified.With
PY-CEI-NRR-2335, Monthly Operating Rept for Oct 1998 for Perry Nuclear Power Plant,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Perry Nuclear Power Plant,Unit 1.With 1999-09-30