Summary of 711028 Meeting W/Util,Bpa,Ge & B&R Re Schedule Requirements & to Review Anticipated Problem Areas Recently Encountered W/Other BWRs
ML20214G722
Person / Time
Site: Columbia, 05000000, Zimmer, Bailly
Issue date: 11/16/1971
From: Miner S
US ATOMIC ENERGY COMMISSION (AEC)
To: Boyd R
US ATOMIC ENERGY COMMISSION (AEC)
References
CON-WNP-0156, CON-WNP-156 NUDOCS 8605220440
Download: ML20214G722 (7)


Text

'

!  :- Docket File NOV 161971 l Roger 8. Boyd, Assistaat Kreeter, WR, Mvistam of Beneter Liammatng SEN Tietor Stello, Chief, WB-4, Eiviales of Beester Ideensing umrrine 33M WagIgge yWEEC PWM M N (WNWS) m massens so. 2 uscEaan summa PseuP, seem us. 50-397 M

A meeting was held with representatives of the Washington Public Feuer Supply System. The purpose of the meeting was to A8===== the VFFW schedule requirements and to review early in the projoet anticipated probles areas that may nguire considerable of2ert to resolve. In addition, problem areas encountered during the reenstly reviewed W R's such as Bailey and Elianer were discussed. The meeting attendance is I attaehed.

t M eeussion

1. Schedule:

The WFF88 construction permit mehad=1m is attached. They expect .

to be ready for an ACM meeting by September 1972.

2. Main Stesen Line l

l (a) Isolation valve leakage--

l WFF88 have not provided a method for utnimising isolation valve leakage. The El- and Bailey positica of providing a sealing system was discusseh WFFES will review this matter and inform us of their eenclusions.

(b) Class I seismic design The Class I seismic requirummats for the main steen line extends saly threesh the isolaties valves. WFFW will present at a later date their position en whether to I

extend the Class I design to the tarbine stay valves.

omer > . . . . . . . . .. . .. . . . .

SuneeAnst > . .. .. . . . . . ... _ . .

DATT > . . . . . . . . . . .

Form AEC-Sta (Rev. 9 53) AECM 0240 e u s cowspwtwr paew wice inn stoa.,

8605220440 711116 PDR ADOCK 05000358 i A PDR 1

I 4 ~ .

l Roger S. Boyd NOV 1 g ign The WFFSS turbine is supplied by Westinghouse in which h stop valves are part of the turbine casing. It is expoeted that the zumoteness of the Ematort # site will be a fsetor -~

- la their decision.

3 meneter aseirculation system (a) Escirculation pump trip WPP88 will provide a recirculation pump trip for MVS pro-tection. This will be included in their first PSAR amendment.

l (b) Control Yalve action during a IDCA i

The G.E. representative stated that the interlock to prevent i' the recirculation and block valves from closing during a IDCA was now being provided as a standard part of the '69 line.

l 4- Pipe Whip Criteria ,

! This will be a major problem area for the applicant since the containment is an ASEE pressure vessel and is doubtfal that pipe '

restraints can be anchored to the vessel. The applicant is in the very early stages of design for pipe whip, but indicated that '

their criteria would allow breaking some emergency oore cooling water piping. In addition, they were not considering pipe breaks

! in straight zuns of pipe. Daring the discussion we indicated that breaking of emergency core cooling piping would create safety

, problems. We also stated that their design should take into

  • i

! consideration leagitudinal and horisestal bzwaks imeloding breaks in straight lengths of pipe.

5 Field Installation of Containment 1 The applicant proposes to use 2" pre-molded polyurethane backed up by 1A" fiber glass between the steel containmast vessel and the biological shield. The urethane will be sealt i

i i ,

, OFFICE > . . . .

! SURNAMED -

l ---- - -- -

DATE > _ .- - . .

Forum AEC-918 (Rev 9-53) AECM 0240 e o s sovtawa ? r=*taa o**ct ne'o-an m

i 4

I I

, Roger S. Boyd -3 NOV I 61371 6 Effect on Banford f2 of Radiological Deleases free FFTF >

, The applicant made a prelt=ta v revise of the FFTF information

, and concluded that there should be ao difficulty of meeting the l '. inteert of proposed Appendix I for noensi plant releases. They l also reviewed the eettuated hs02 relemmes from the FFTF daring am nesident condition ara conc 3mded Dat thsee osals.pese no problems to Emaford 56. 2. Rosever, they indiented they weald contianne to review FFTF informaties as it becomes available.

The applicant nyiewed normal and aseidental releases from Eanford Bo.1 and coachdad that the effects of these nlesses on Manford No 2 are insignificant.

1 7 Off-Site Power Availability Boneyville Power Administration (EPA) has the right to interrupt or reduce off-site power to Banford de in case of emergencies, or

, to make repairs and do maintenance The EPA representative agreed l that power to the station will not be intentionally interrupted l without prior approval by WPPSS This will be documented.

I j 8. Addendus fl to FBAR i

Attached is a list of sub,lects to be covered in addendue $1 to l the Bamfbrd No. 2 PSAR.

9 service cooling water system i The spray water cooling pond is divided into two sections with each section having sufficient water stormas for aheat 7 days j if maxe up water is lost. The spray water pond is desi6ned to l Seismic Class I criteria whereas the river water pump house l (make up water) is designed to Seismic Class II Criteria. If the two sections of the spray pond can be arranged for manual interconnection there would be sufficient water storage for l about 30 days without water make up. Bovever, if the single

failure criteria requires considerlag a passive failure in the 1

l l

t t

of7KE > . . . . . . . . . . . . . . . . . -

SURNAME > - . . - - - . .- .

DATE > _

Form AEC-las tRev. 9-53) AECM 0240 e o s oove amm %, == *na.a oes.re n_ air w sa

t Bo6er S. Boyd 4- NOV I C 1371 buried concrete water pond only 7 days storage can be considered as available The applicant will review the condittoms under which only the spray pond will be available for cooling service water to provide a basis for evaluating the storage time avail-able in the spray pond.

Odginsi sirwd by

! Sydney Miner, Project Imader B(R 4 Branch

! Division of Besctor Licensing i DISTRIBUTION:

! Docket File i DRL Reading WR4 P. A. Morris F. Schroeder T. R. Wilson R. S. Boyd R. C. DeYoung D. J. SkQvholt H. R. Denton R. W. Klecker R. H. Vollmer E. G. Case r

R. R. Maccary t Compliance (2)

I DRL/DRS Branch Chiefs S. Kari

S. Miner R. D. Pollard i

I i

l l

I DRL:W R k orrra > .DRL:W R VStello SMine :

! SURNAME > . . . . . . . . . . . .

I OATE >

11/16/71 . . . .l11/ _ _ ./71 Form AEC.Ste (Rev. 9-511 AECM 0240 e u s oovtaque=t echstw onu tem-4or m

i 1

Hanford Bo. 2 Meeting Octok r 28, 1971 WAMIMFfW PUBLIC PGER WFFLY SYSTEE l ,

L. L. Emmplareys B. L. a.=herger

, O. E. Trapp i

i i

EDE VILIE PGER f_wmIRTRATION I

P. C. Otness l

GE ERAL II2CTRIC G. R 8towe i

i BJRNS AND EDE l W. J. Ritsch i

DRL i V. Stello i

S. Miner l

j E. D Po M i

I

, e l l l l I

i l ,

! OmCE > .. . . . . . .

I SUR80AA8E > . . . . . -

04TE >

Fossa AIC.318 (Rev. 9.53) AECM 0240 e u s costowe%v pe= Town crect to'o-ec7 rse

i I

WAANTETCE RTBLIC POWER SERVICE SYSTBt BARFORD 30. 2 i Cbastnetion Pemit Licensing schedule I

g (kehedaled Date l - 1. File sies e Appua. tion s/19/71

! (Application, PEAR and ER) 2 File Voluntary a==na - t 11/1/71 3 Receive 1st Set of W stions 12/1/71 (Including Questions on Environmental Matters) l

4. Answer let Set of Questions 1/15/72 l 5 Receive 2nd Set of Questions 4/1/72 l 6. Answer 2nd Set of Questions 5/15/72 l

I 7 ACRS Subcommittee Meeting 7/1/72 i

! 8. ACRs rull committee Meeting 9/1/72 1

i 9 ACRS Intter to the Consission 9/15/72

, 10. Public Announcement 9/30/72

11. Public Hearing 10/31/72
12. Receive Construction Permit 2/15/73 I

i l

l l

l l

i l

orTKE >

j $URMAME> ... .

DATE > . . . . ., .

Faces AEC418 (Rev. 9-33) AECM 0243 eus w.tawr=?NNtmoncs r e vo-- e

  • m

n l

i a: ~

i I

l WAMNTOE FUBLIC 70WER SUFFLY SINTW i

BAEFORD 50. 2 m 30.1 CEAEMI TO PEAR j 1 UFBASED ECW CAI/MMIME )

2. Cl3EEI1 MENT 20 PEDVIEg au rar'. Ptage TgIF 3 BIENHECY PLAIS - EIPANDED QUTLIEE
4. 230 KY AND 115 EY ROUTING AND rVWmrTICE TO M WBETATION 5 WEBTOII REPORT - GEOPHYSICAL LIIE SEOT ECUTE OF FFTF i 6. BIEMiW CY SEEVI S WATER 7 AIIIITICEAL INFOMATION 05 VAQAEt BELIEF l
6. WIIDIEG ansammmTS (CASK STORAGE) l 9 MIFT amrum EEVISICIIS TO FIDW HTMEMR
10. WALITY ASSURAEG - MIBOR CEAEiES l
11. MIBOR WAEGES TO SECTICES 11 & 12
12. MIBOR NAMER TO SECTION 2 - CLARIFICATIOE OF SOURCE OF GEDIDGICAL l MATERIAL l l l

l 2

i 4

i i

l l

3 omCE > .- ----

SURNAME > . . . . - - - - - - ---- --

1 DATE > - ---

Fone AEC-Ste (Rev,9-53) AkCM 0240 o u o novsamt mt% oerce sov e ne l

l