(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Similar Documents at Fermi |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N4261999-10-25025 October 1999 Forwards Amend 17 to License DPR-9 & Safety Evaluation. Amend Revises TS by Deleting SR D.3.c,which Required Weekly Observation of Nitrogen Cover Gas Pressure within Sodium Storage Tanks Located in Sodium Building NRC-99-0085, Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl1999-10-22022 October 1999 Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl NRC-99-0094, Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed1999-10-22022 October 1999 Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed ML20217P1661999-10-21021 October 1999 Forwards Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted ML20217M0771999-10-19019 October 1999 Confirms Discussion Between GL Shear,M Mitchell,E Kosky, D Williams,B Rumins,D Harmon & W Rutenberg in Public Meeting on 990923.Purpose of Meeting Was to Discuss Current Status RP Program at Enrico Fermi 2 ML20217N9231999-10-15015 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 40 ML20217E5671999-10-14014 October 1999 First Partial Response to FOIA Request for Documents.Records in App a Already Available in Pdr.App B Records Encl & Being Released in Entirety NRC-99-0087, Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons1999-10-12012 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons NRC-99-0083, Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-10-0707 October 1999 Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal ML20217D5331999-10-0707 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 39 ML20217F5931999-10-0707 October 1999 Forwards Insp Rept 50-341/99-11 on 990724-0908.Two Violations Re Failure to Follow Procedures While Sampling Standby Liquid Control Tank & Wear Dosimetry Properly Being Treated as Noncited Violations ML20217B8261999-10-0404 October 1999 Forwards Summary of Decommissioning Insp Plan for Fy 2000. Plan Will Be Updated Annually & May Be Revised at Any Time Based Upon Future Insp Findings,Events & Resource Availability ML20212J8121999-10-0101 October 1999 Discusses Plant,Unit 2 Completion of Licensing Action for GL 98-01 & Suppl 1, Y2K Readiness of Computer Sys at Npps. Ack Efforts That Licensee Have Completed to Date in Preparing Plant for Y2K Transition ML20212K8881999-09-30030 September 1999 Refers to 990928 Meeting Conducted at Fermi Unit 2 to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20217A3261999-09-30030 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 38 NRC-99-0091, Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations1999-09-27027 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations ML20212J8331999-09-27027 September 1999 Responds to Licensee 990924 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in TS 3/4.6.1.8.Ltr Documents 990923 Telcon with Util in Which NRC Orally Issued NOED ML20216G9791999-09-24024 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 37 NRC-99-0092, Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys1999-09-24024 September 1999 Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20216H3561999-09-23023 September 1999 Informs That During 990914 Telcon,L Sanders & M Bielby Made Arrangements with NRC to Inspect Licensed Operator Requalification Program at Fermi Nuclear Station for Week of 991129 Which Coincides with Util Regularly Scheduled Exam ML20216H4541999-09-23023 September 1999 Informs That During 990914 Telcon L Sanders & M Bielby Made Arrangements for Administration of Licensing Exams at Fermi Nuclear Station for Week of Jan 31,2000.NRC Will Make Exam Validation Visit to Facility During Week of Jan 10,2000 ML20212F3241999-09-20020 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 36 NRC-99-0081, Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public1999-09-17017 September 1999 Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public ML20217A9421999-09-0909 September 1999 Informs That NRC Plan to Conduct Addl Resident Insps Beyond Core Insp Program Over Next 6 Months to Assess Improvements in Areas of Procedural Compliance & Quality of Work. Historical Listing of Plant Issues Encl NRC-99-0079, Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-09-0808 September 1999 Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20211Q0991999-09-0303 September 1999 Forwards Rev 35 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0090, Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld1999-09-0303 September 1999 Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld NRC-99-0066, Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d)1999-08-30030 August 1999 Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d) ML20211G4951999-08-24024 August 1999 Forwards Rev 34 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0055, Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval1999-08-19019 August 1999 Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval IR 05000341/19990131999-08-19019 August 1999 Discusses Insp Rept 50-341/99-13 & OI Rept 3-98-039 Conducted Into Potential Misconduct of Operator Formerly Employed by De.Nrc Determined That Violation of NRC Regulations Occurred.Synopsis of IO Rept Encl NRC-99-0056, Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation1999-08-19019 August 1999 Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation ML20211C0521999-08-17017 August 1999 Forwards Tables for Sections 3.6 & 3.7 of Draft Safety Evaluation of Proposed Conversion of Current TS to Improved Standard TS NRC-99-0089, Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-08-17017 August 1999 Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20217E6181999-08-13013 August 1999 FOIA Request for Documents Re Implementing Regulations in 10CFR & Requesting That Region III Task Interface Agreement (TIA) Related to Fermi 2 Plant Be Made Available IR 05000341/19990011999-08-10010 August 1999 Forwards Insp Rept 50-341/99-01 on 990619-0723 & Nov. Violation of Concern Because Operators Did Not Understand License Requirements & Placed Plant in Configuration Where EDG 11 Was Removed from Service IR 05000341/19990121999-08-0606 August 1999 Forwards Insp Rept 50-341/99-12 on 990712-0716.No Violations Noted.Insp Focused on Implementation of Plant Chemistry & Radiological Environ Monitoring Programs & Operation of post-accident Sampling Sys ML20211C4761999-08-0606 August 1999 Forwards Draft Safety Evaluation Re Proposed Conversion of Current TS to Improved Standard TS NRC-99-0057, Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS1999-08-0404 August 1999 Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS ML20210N5451999-08-0303 August 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 33 NRC-99-0077, Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS1999-07-26026 July 1999 Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS ML20210J2121999-07-23023 July 1999 Discusses NRC OI Investigation Rept 3-98-039 Completed on 990524 & Forwards Notice of Violation NRC-99-0053, Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl1999-07-15015 July 1999 Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl ML20209H7211999-07-14014 July 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 32 NRC-99-0054, Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal1999-07-13013 July 1999 Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal ML20209F6571999-07-12012 July 1999 Forwards Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted.Weak Procedural Guidance,Communications Issues & Configuration Control Weaknessess Were Evident NRC-99-0052, Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions1999-07-0707 July 1999 Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions ML20196J5511999-07-0202 July 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950519 & DE Responses & 980729 for Fermi 2.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 as Result of Review of Responses ML20209C6141999-07-0101 July 1999 Rev 31 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0076, Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included1999-06-30030 June 1999 Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included 1999-09-09
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20115G0431996-05-13013 May 1996 Discusses Concerns Re Dumping of Waste Water from Fermi Plant,Near Monroe ML20207Q5941986-10-0606 October 1986 Partially Illegible FOIA Request for Documents on Thompson Concerns Re Plant ML20214L2241986-07-0808 July 1986 Documents Results of Evaluation Performed in Incorrect Assembly of Steam Dryer.No Adverse Effect Found on Any Structure in Load Path.Related Info Encl ML20127N0751985-05-0707 May 1985 Requests Util to NRC Re Results of as-built Evaluation of safety-related Piping Sys Attached to RCPB for Faulted Loads.Ltr Needed to Respond to Encl 2 of NRC ML20210T2241984-09-25025 September 1984 Forwards Duke Power Co Const Assessment Team Comments on Recipient Response to Recommendations Included in Team Fermi II-Final Assessment of Const Rept. Review Completed in Fewer Manhours than Authorized by D Metcalf ML19257A3321979-12-14014 December 1979 Forwards Coastal Zone Mgt Act Federal Consistency Certification Submitted to NRC in Conjunction W/Licensee Application to Receive Nuclear Fuel & Operate Plants ML19275A0571979-08-0202 August 1979 Approves,W/Mods, Intrainment & Impingement Study - Phases I & Ii. ML19326A9531971-03-0505 March 1971 Forwards 710304 Ltr to Toledo Blade Re Necessity & Safety Factors of Facilities to Be Constructed within 50 Mile Distance of Lake Erie 1996-05-13
[Table view] Category:EXTERNAL LETTERS ROUTED TO NRC
MONTHYEARML20207Q5941986-10-0606 October 1986 Partially Illegible FOIA Request for Documents on Thompson Concerns Re Plant ML20214L2241986-07-0808 July 1986 Documents Results of Evaluation Performed in Incorrect Assembly of Steam Dryer.No Adverse Effect Found on Any Structure in Load Path.Related Info Encl ML20127N0751985-05-0707 May 1985 Requests Util to NRC Re Results of as-built Evaluation of safety-related Piping Sys Attached to RCPB for Faulted Loads.Ltr Needed to Respond to Encl 2 of NRC ML20210T2241984-09-25025 September 1984 Forwards Duke Power Co Const Assessment Team Comments on Recipient Response to Recommendations Included in Team Fermi II-Final Assessment of Const Rept. Review Completed in Fewer Manhours than Authorized by D Metcalf ML19257A3321979-12-14014 December 1979 Forwards Coastal Zone Mgt Act Federal Consistency Certification Submitted to NRC in Conjunction W/Licensee Application to Receive Nuclear Fuel & Operate Plants ML19275A0571979-08-0202 August 1979 Approves,W/Mods, Intrainment & Impingement Study - Phases I & Ii. ML19326A9531971-03-0505 March 1971 Forwards 710304 Ltr to Toledo Blade Re Necessity & Safety Factors of Facilities to Be Constructed within 50 Mile Distance of Lake Erie 1986-07-08
[Table view] |
Text
-
313-586-2798 ec: CL,HPL.,7MLL iiR GENERAL $ ELECTRIC .
HUcLEAA LNEROV eult,Ess OPeRAftONS n!.( .
GENEaAL [LEC1WC COMPANY e 17$ CutTNER AVENUE 9 SAN Jos[. CAUFOaNA 931r>
MC391,(408)925-2588 July 8, 1986 TDEC-5349 Mr. S. E. Kremer, General Supervisor Nuclear Procurement
- Enrico Ferrai 2,108 EF2 NOC -
The Detroit Edison Company 6400 N. Dixie Highway Newport, MI 48165 Attention: Mr. R. May (215 EF2 AIB)
SUDJECT: Evaluation Results for Fermi-2 Dryer Insta11Ltion Problem Gentlenen:
This is to document the results of an evaluation perfortned by GE to confirvn that the incorrect assembly of the steam dryer / vessel closure head had no adverse effect on any structure in the load path.
- , It was reported that the steam dryer was incorrectly installed in the vessel and this resulted in an interference that'did not let the vessel head seat on the flange when assembly was attempted. The report indicated that the seismic lug, which should straddle the vessel lug with no vertical load transmission to the vessel lug, was in contact with the vessel lug and supported the weight of the vessel head and the weight of the steam dryer.
For our evaluation, the vessel head was assumed to be supported by three of the four steam dryer lifting lugs. The lif ting lug is welded to the dryer support ring. The dryer support ring carries the dryer plus head weight to the vessel steam dryer support lugs. The following structure was che-ked:
- 1. Theliftlug(buckling). .
- 2. The lift lug to dryer support ring welds.
- 3. The dryer seismic bracket for the non-design vertical load.
- 4. The vessel dryer support lug weld.
- 6. The vessel wall.
8609090553 860904 PDR FOIA !
- REECANB6-551 PDR
313 586-2798
..y,..
GENER AL $ ELECTRIC nf ..
The evaluation showed that all stmsses were within ellowable stress limits of A5ME Section III. (It should be noted that all stresses would be within the ASME Code allowables if it were assumed that the loads were carried by two lifting lugs rather than three, except for the lift lug critical buckling stress. Ytsual examination showed that the lift lugs did not buckle.)
Very truly yours.
. 03nson w/ ..
.. Pr ect Manager j'; Enrico Fermi 2 Project -
(l' h CMJ:mrk 01 -
j::
cc: E. 5. Drumhiller, GE Site W. F. Miotti. GE Cleveland lI I!
l
- l. . - _ _
-~
USILY REPORT DII D3fE OT/10/86 . .
FACILITY /LICEwSEEt FERMI 2
, NOTIFICATION: 541 lSU6JECTI PROPOSED MEARING
- EVEzT
- SV A 5-3 VOTE. THE 90MR0E CouNTYo,.*!CHIGAN HOARD OF COUNTY COMMISSIONERS PASSE 0 A RESOLUTION TO
,RE00EST C049#ESSMAN JOHN UINGELL To CONDUCT HEARINGS ON TME SE MARK I CONTAINMENTS. THE SAFE ENERGY COALITION
'0F CICHIGAN (SEC041 STATEU AT THE NRC COMNISStoN HRIEFING ON MONDAT. JULY To 1986 THAT IT ALSO WAS GOING To
- MAME SUCM A RE00EST.
j RE010NAL ACTION: INFORMATI0g l
l l
l FACILITY / LICENSEE LACsed
}=0TIFICSTION: TELECON FROM LICENSEE nN JurJE 10. 1986
- SUeJECT
- RETURg To OPERaTIow
' event THE PLANT Resume 0 09EhATING At 8 Asi P.M. coy ON Joty v. 19n6. FOLLOW!NG THE REACTOR TRIP OF JULY P.
- 1986 (5EE MORNING REPORT OF JULY 9 1R86). A SPARE CONTR3L RUD ORIVE UNIT wAS INSTALLED ON CONTROL ROD No.
'12 C0 ERECTING THE PR04LEn WITH THAT 4; NIT YHE REDUNnANT ELECTRIC DR!vE FEEDWATER PU*P WAS USED FOR THE STARTU8
,440 OPERATION. THE UNIT PARALLELEn Ti THE GRIO AT 63 33 A.M. COT 04 JULY 10, 1986 1RECIONAL ACTIDMI FOLLoeUP PER MC 2515
, FACILITY / LICENSEE FERM1 2 NOTIFICOTION FROM SRI SoeJECT: REACTOR WESSEL HEA0 NOT SEATED P&OPERLY EVENT
- ON M0w0AY JULY To 1986. THE LTCENSEE ATTEMPTEu TO INSTALL THE REACTOR VESSEL HEAD. UPON SETTING TME hec 0 DN THE VESSEL THE LICENSEE OBSERVED TFAT THE HE AD w AS 2"-3" ABOVE SEATING ON THE REACTOR VESSEL FLANGE.
'TdE LICENSEE THEN DETERMINED THAT THE HEAD wAS RESTING ON THE TOP OF THE STEAM ORYER WHICH WAS NOT PROPERLY SECTEU. THE HEAD AwD OdvER WERE THEN REmonED. THE DwYER 4ESEaTED. ANU THE MEAD REINSTALLED PROPERLY ON THE REcCTOR VESSEL FLANGE. ei IS PRESENTLY DOING AN ANALYSIS ON THE DRYEH TO DETERNINE IF AN OVERSTRESSED ComoITION OCCURRED.
REC 10NAL ACTION: FOLLoeup oY SRI n .
1
--n, . - - - .w._