Documents Results of Evaluation Performed in Incorrect Assembly of Steam Dryer.No Adverse Effect Found on Any Structure in Load Path.Related Info Encl
ML20214L224
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/08/1986
From: Clay Johnson
GENERAL ELECTRIC CO.
To: Kremer S, May R
DETROIT EDISON CO.
Shared Package
ML20214L221 List:
References
FOIA-86-551 TDEC-5349, NUDOCS 8609090553
Download: ML20214L224 (3)


Text

-

313-586-2798 ec: CL,HPL.,7MLL iiR GENERAL $ ELECTRIC .

HUcLEAA LNEROV eult,Ess OPeRAftONS n!.( .

GENEaAL [LEC1WC COMPANY e 17$ CutTNER AVENUE 9 SAN Jos[. CAUFOaNA 931r>

MC391,(408)925-2588 July 8, 1986 TDEC-5349 Mr. S. E. Kremer, General Supervisor Nuclear Procurement

  • Enrico Ferrai 2,108 EF2 NOC -

The Detroit Edison Company 6400 N. Dixie Highway Newport, MI 48165 Attention: Mr. R. May (215 EF2 AIB)

SUDJECT: Evaluation Results for Fermi-2 Dryer Insta11Ltion Problem Gentlenen:

This is to document the results of an evaluation perfortned by GE to confirvn that the incorrect assembly of the steam dryer / vessel closure head had no adverse effect on any structure in the load path.

, It was reported that the steam dryer was incorrectly installed in the vessel and this resulted in an interference that'did not let the vessel head seat on the flange when assembly was attempted. The report indicated that the seismic lug, which should straddle the vessel lug with no vertical load transmission to the vessel lug, was in contact with the vessel lug and supported the weight of the vessel head and the weight of the steam dryer.

For our evaluation, the vessel head was assumed to be supported by three of the four steam dryer lifting lugs. The lif ting lug is welded to the dryer support ring. The dryer support ring carries the dryer plus head weight to the vessel steam dryer support lugs. The following structure was che-ked:

1. Theliftlug(buckling). .
2. The lift lug to dryer support ring welds.
3. The dryer seismic bracket for the non-design vertical load.
4. The vessel dryer support lug weld.
6. The vessel wall.

8609090553 860904 PDR FOIA  !

- REECANB6-551 PDR

313 586-2798

..y,..

GENER AL $ ELECTRIC nf ..

The evaluation showed that all stmsses were within ellowable stress limits of A5ME Section III. (It should be noted that all stresses would be within the ASME Code allowables if it were assumed that the loads were carried by two lifting lugs rather than three, except for the lift lug critical buckling stress. Ytsual examination showed that the lift lugs did not buckle.)

Very truly yours.

. 03nson w/ ..

.. Pr ect Manager j'; Enrico Fermi 2 Project -

(l' h CMJ:mrk 01 -

j::

cc: E. 5. Drumhiller, GE Site W. F. Miotti. GE Cleveland lI I!

l

l. . - _ _

-~

USILY REPORT DII D3fE OT/10/86 . .

FACILITY /LICEwSEEt FERMI 2

, NOTIFICATION: 541 lSU6JECTI PROPOSED MEARING

EVEzT
SV A 5-3 VOTE. THE 90MR0E CouNTYo,.*!CHIGAN HOARD OF COUNTY COMMISSIONERS PASSE 0 A RESOLUTION TO

,RE00EST C049#ESSMAN JOHN UINGELL To CONDUCT HEARINGS ON TME SE MARK I CONTAINMENTS. THE SAFE ENERGY COALITION

'0F CICHIGAN (SEC041 STATEU AT THE NRC COMNISStoN HRIEFING ON MONDAT. JULY To 1986 THAT IT ALSO WAS GOING To

MAME SUCM A RE00EST.

j RE010NAL ACTION: INFORMATI0g l

l l

l FACILITY / LICENSEE LACsed

}=0TIFICSTION: TELECON FROM LICENSEE nN JurJE 10. 1986

SUeJECT
RETURg To OPERaTIow

' event THE PLANT Resume 0 09EhATING At 8 Asi P.M. coy ON Joty v. 19n6. FOLLOW!NG THE REACTOR TRIP OF JULY P.

1986 (5EE MORNING REPORT OF JULY 9 1R86). A SPARE CONTR3L RUD ORIVE UNIT wAS INSTALLED ON CONTROL ROD No.

'12 C0 ERECTING THE PR04LEn WITH THAT 4; NIT YHE REDUNnANT ELECTRIC DR!vE FEEDWATER PU*P WAS USED FOR THE STARTU8

,440 OPERATION. THE UNIT PARALLELEn Ti THE GRIO AT 63 33 A.M. COT 04 JULY 10, 1986 1RECIONAL ACTIDMI FOLLoeUP PER MC 2515

, FACILITY / LICENSEE FERM1 2 NOTIFICOTION FROM SRI SoeJECT: REACTOR WESSEL HEA0 NOT SEATED P&OPERLY EVENT

  • ON M0w0AY JULY To 1986. THE LTCENSEE ATTEMPTEu TO INSTALL THE REACTOR VESSEL HEAD. UPON SETTING TME hec 0 DN THE VESSEL THE LICENSEE OBSERVED TFAT THE HE AD w AS 2"-3" ABOVE SEATING ON THE REACTOR VESSEL FLANGE.

'TdE LICENSEE THEN DETERMINED THAT THE HEAD wAS RESTING ON THE TOP OF THE STEAM ORYER WHICH WAS NOT PROPERLY SECTEU. THE HEAD AwD OdvER WERE THEN REmonED. THE DwYER 4ESEaTED. ANU THE MEAD REINSTALLED PROPERLY ON THE REcCTOR VESSEL FLANGE. ei IS PRESENTLY DOING AN ANALYSIS ON THE DRYEH TO DETERNINE IF AN OVERSTRESSED ComoITION OCCURRED.

REC 10NAL ACTION: FOLLoeup oY SRI n .