Rev 6 to Configuration Control
ML20207S473
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/03/1987
From: Aycock W, Murphy M, Stewart D
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20207S465 List:
References
307.13-SQN, 307.13-SQN-R06, 307.13-SQN-R6, NUDOCS 8703190513
Download: ML20207S473 (16)


Text

c)-

TVA EMPLOYEE CONCERNS REPORT NUMBER: 307.33-SQN

. SPECIAL PROGRAM REPORT _ TYPE: Sequoyah Nuclear Plant Element Report REVISION NUMBER: 6 TITLE: Configuration Control RFASON FOR REVISION:

To incorporate TAS and SRP comments. IR1 To add two new concerns and incorporate SRP. comments and corrective IR2

' action tracking documents. l

.To incorporate SRP comments IR3 To add an additional concern IR4 To incorporate SRP comments and Sequoyah Corrective Action Response IR5 To incorporate NRC comments lR6 PREPARATION PREPARED BY:

W. L. Aycock -f % !f'9 SIGNATURE DATE REVIEWS PEER: o l

Yk

/ SIGNATURE

  • flT [Y

'DATE TAS:

l _._

lll . / _

$!$/Ul 1

3 /'$ ,' SIGNATURE DATE CONCURRENCES _

  • n CEG-H: .

- ,n u T- 5 -$ 1 SRP: q . 3-4-67

_ SIGNATURE DATE

/ SIGNATURE

  • DATE APPHOVED BY:

_. f N/A_.

DATE

ECSt' MANAG _ DATE MANAGER OF NUCLEAR POWER l CONCURRENCE (FINAL REPORT ONLY) l
  • SNP Secretary's signature denotes SRP concurrences are in files.

, 1449T 8703190513 870316 PDR ADOCK 05000327 p PDR t

TEhNESSEE VAI. LEY .1TitoRITY SEQUOYAH NUCLEAR PLANT EMPLOYEE CONCERNS TASK GROUP OPERATIONS CEG Subcategory: Nuclear Power / Site Progrem/i'rocedure Element: Configuration Control 307.13 Report Number: 307.13 - SQN Revision 6 XX-85-062-003 XX --85 -071-N05 BFN 4KSC 85-03 IN-85-984-001 Evaluator: _W. L. Aycock Th/(7' W. L. Aycock Date Evaluator: J. S._Manuel 5/5/f7' J. S. M nue17 tate

, l? ! , / , .

Reviewed by: 4Mf/ 'W ff 1/ 's / ' '/

OPS CEG/ Member ' Date

'n .7 [,

Approved by: # 2 5- o v- 3- 5 'I l W.R.Lahdren Date 1449T

. - _ _ _ __ ..._ . _ . _ . . _ _ . m ..

Revision 6 I. CONFIGURATION CONTROL This element report addresses four employee concerns. XX-85-062-003 is specific to Sequoyah Nuclear Plant (SQN) and was closed out via NSRS Evaluation Report 1-85-473-NPS. This concern is also being addressed by

the Engineering (EN) Category Evaluation Group. Concern XX-85-071-N05 j is also specific to SQN but was not included-in the NSRS investigation.

doncern BFN-IESC-85-03 was expressed for Browns Ferry, but was made generic to SQN. Concern IN-85-984-001 was originated at Watts Bar Nuclear Plant (WBN) and was evaluated as generic to SQN.

i II. SPECIFIC EVALUATION METHODOLOGY The employee concerns are as follows:

XX-85-062-003

'Sequoyah, Browns Ferry: CT was unofficially informed that the drawings, in many-instances, are not a true representation of the installation. Nuclear Power Concern. CI has no more information.

Concern XX-85-062-003 is shared with the Engineering Concern Evaluation Group and is also. addressed by element report 206.01.

XX-851071-N05 NRC identified the following concern from review of the QTC file.

I

" Drawings in the control room do not reflect actual plant

configuration."

i i

HFN-IESC-85-03 Concerns expressed regarding:

1. Process for evaluation of 10 CFR 21 applicability
2. Inadequate understanding of the level of control required in i nuclear parts program is indicative of weakness in NQAM
3. Configuration control i

' The first two items in this concern are not related to configuration control and are being addressed by the Quality Assurance CEG.

l Page 1 of 13 i

J.-.. , - - . - , - . , , - , . , - - ..mi, ,-

, -n--, e,--,, , --

- Revision 6 IN 85-984-001 The Nuclear Power Department changes hardware without changing the drawings. EG: Ladders to tops of filter cubicles in Auxiliary Building Number 1 and common areas on 676', 692' and 737' elevations were cut in half to allow removal during filter plug removal, but drawings were not changed. 1982 Construction Department concern. CI has no further information.

This concern was made in regard to a manifestation of configuration control breakdown at WBN. It was resolved by an FCR which revised the design drawings to show the new ladder configuration. Thus, the specific installation was not evaluated at SQN, but was taken as a part of the overall configuration control issue.

The concerns were evaluated as one under the topic of configuration control.

The evaluation of these concerns and the associated NSRS evaluation response concentrated on five aspects:

1. The validity of the concerns.
2. The adequacy of the NSRS evaluation report and the recommendations contained therein.
3. Verification of the line response to the NSRS report.
4. Verification of corrective action taken by line management.
5. The adequacy of corrective action to resolve the concern and prevent recurrence.

Appropriate regulatory requirements and Sequoyah specific procedures were reviewed to ensure programmatic compliance for configuration control at SQN.

III. FINDINGS NSRS investigated concern XX-85-062-003 (reference 7) and determined it to be valid due to the following:

1. Field Change Requests (FCRs) specifically concerning configuration deviations have been initiated at SQN to correct drawings that do not accurately reflect the plant conditions. A sample review found 23 FCRs that corrected configuration differences.

A related finding was that several FCRs had been legged by construction, but were not documented in construction files, Management and Engineering Data Systems (MED) or in the available OE FCR logs.

Page 2 of 13

Revision 6 The timeframe associated with processing FCRs has also been a problem, sometimes taking up to several months. This leads to long periods during which the plant configuration is not accurately represented on drawings. (See Reference 15)

2. In-plant surveys by the SQN Quality Surveillance Section have resulted in Discrepancy Report SQ-DR-85-10-131 R and Corrective Action Reports SQ-CAR-84-12-20 and SQ-CAR-84-03-008. These reports identify 19 drawings that did not agree with the plant configuration. Workplans 11378, 11424, 11458, and 9609 were written to correct these identified plant configuration deficiencies. TVA memoranda from R. V. Olsen to P. R. Wallace dated January 31, 1985, and May 29, 1985, documented these problems but deferred actions.
3. The examples of failure to produce as-constructed drawings, instrument tabs, and bills of material partially result from a lack of formal written instructions and inadequate training of personnel.

There was not a clear understanding by plant personnel as to what constituted as-constructed drawing requirements. Document Control Center (DCC) pointed out to the NSRS investigator that they are not in a position to make judgments on what items are to be as-constructed. The process of producing as-constructed drawings correctly rests with the workplan initiator alone.

4. Within the last twelve months there have been several investigations into configuration control by personnel within TVA and by experts outside TVA. (See References 6, 9, and 34) Each review has exposed configuration control weaknesces and has made recommendations to improve the process. A corporate configuration management program manager has been named, and TVA committed to develop an improved program for all sites by July 1986. Evidence of this effort is contained in the Corporate Nuclear Performance Plan (CNPP).

NSRS made three recommendations as a result of their investigation.

1. I-85-473-NPS-01, " Systematic Configuration Control." NSRS recommended that the corporate configuration manager develop a configuration control program at all TVA nuclear plants which systematically confirms the safety-related, as-built configuration.

I Page 3 of 13

Revision 6

2. I-85-473-NPS-02, " Additional Instructions on As-Constructed Drawing Requirements." Additional written instructions should be developed which include how to "as-construct" bills of material, vendor manuals, and instrument tabs. It should also include procedures for maintaining a drawing which is needed for operation, maintenance, or modification but is not in the Drawing Management System (DMS). Also, SQN AI-25 (Reference 8) should be revised to reflect these instructions as well as to relieve the workplan cognizant engineer of the responsibility for deciding about plant configuration record keeping matters.
3. I-85-473-NPS-03, " Improve As-Construc* _ Drawing Process."

Each of the plants should establish an ae-constructed drawing review process as part of workplan closure to eliminate the potential for error of single point control responsibility assigned to the workplan initiator and to ensure timely processing of workplan drawing changes.

The NSRS evaluation was sufficiently thorough to cover the issues raised by all four concerns as outlined above.

Following the NSRS investigation. SQN line management agreed to implement the recommendations, but gave them a low priority.

Consequently, no specific action has been taken by SQN to address them. Other corporate TVA programs, however, are working to improve the configuration control process. These include the Configuration Control Task Force (CCTF), and the Configuration Control portion of the Sequoyah Nuclear Performance Plan.

The TVA Corporate CCTF was created in June 1983 to resolve audit findings at Brown's Ferry, but was later chartered to evaluate and propose solutions to configuration control issues throughout TVA-Nuclear.

CCTF identified nine issues which led to ineffective configuration control:

1. Insufficient management emphasis.
2. Insufficient and incorrect use of the existing design and modification controls.
3. Insufficiently documented design criteria and basis.

l 4. I.ack of a comprehensive and integrated TVA vendor information program.

S. Use of multiple and inaccurate drawing management data bases.

6. Inadequate and inaccurate content and control of procedures.

Page 4 of 13 l

Revision 6

7. Lack of a prioritized drawing list for updating drawings to reflect the plant status.
8. Problems with legibility, unitization, and accuracy of drawings.
9. Insufficient document' control.

Out of these issues CCTF proposed ten improvements:

1. A single, unitized drawing system (CCD), which represents the design.and configuration status of the plant.
2. Unitized design change packages as defined by Nuclear Quality Assurance Manual (NQAM) Part V Section 2.4 Quality Notice on design change supplements.
3. Closure of the backlog of open ECNs and workplans.
4. Constructability walkdowns between the designer and constructor.

S. Drawing discrepancy program as defined by NQAM Part III, Section 1.1 Quality Notice.

6. Vendor information program established per NQAM Part V.

Section 6.2 and NQAM Part III, Section 1.1-Quality Notice.

7. Establishment of a design basis documentation program.
8. Establishment of the Drawing Management System (DMS) as the ONP drawing and document status system.
9. Upgrade of data bases and information systems, and
10. Consolidated document control centers.

The CCTF charter did not mandate tracking of the recommendations, therefore the-essence of the recommendations have become part of the Sequoyah Nuclear Performance Plan (SNPP) and the CNPP.

The SNPP was originally presented to NRC in November 1985 to satisfy a request to address some specific corrective actions. In July, 1986, TVA submitted a revised (Reference 11) SNPP to the NRC as part of the overall re-organization of the nuclear program. The CNPP outlines system-wide enhancements to the nuclear program, including configuration control.

Page 5 of 13

-Ravision 6 In the SNPP, TVA.related.the findings of two design control surveys

- performed by Gilbert / Commonwealth (G/C) (Reference 9). Problems identified by the first survey were:

1. Need for reliable information on plant configuration for engineering personnel.
2. Need for increased emphasis on the documentation of design e inputs.
3. Requirement for completed design work to be reviewed for potential unreviewed safety questions.

The second G/C review team selected the main and auxiliary feedwater sy, stems for a review of design changes made since-issuance of the operating license. The survey identified nineteen technical issues and eighteen observations. The recommendations made to resolve-the technical issues were put into the form of TVA action plans. Root causes identified by the survey were:

1. Engineering evaluation of design changes.
2. Documer.tation of evaluation.
3. Detail in design output.
4. Identification of design input and design bases. ,

An additional finding from the second G/C review was that the Unreviewed Safety Question Determination (USQD) activities requhe improvement. Division of Nuclear Engineering (DNE) initiated A review of the current configuration and determined that fourte'en Engineering Change Notices (ECN) would require a USQD based on the current state of the plant. This is considered symptomatic of the lack of coordinated configuration control practices. DNE accordingly made several recommendations.

1. Initiate a review of shutdown and accident-mitigating systems to L uncover any USQs.

t

2. Check accuracy of markups on as-configured drawing in the SQN control room.
3. Review unimplemented ECNs for the necessity of incorporation
4. Revise AI-19 (Reference 36) to require DNE concurrence on USQD's prepared at SQN for partially implemented ECNs to ensure that DNE design analyses are not impacted.

S. Revise design change procedures to delineate the scope of a change and to specify those changes which are made to support licer. sing commitments or to resolve Conditions Adverse to Quality (CAQs).

Page 6 of 13

1 I

Ravision 6 4 5: In_ addition to the DhE recommendations, an NRC inspection of the G/C survey resulted in these findings:

1. Industry codes and standard were not followed in some parts of the original design.
2. Design calculations were not available to support some of the original design.
3. Temporary alteration procedures have been used.for permanent design; management controls did not provide for engineering review and closure.
4. Seismic requirements were not being adequately handled as design input in some instances nor were they translated into design output documents.
5. Five cases were identified where design modifications violate the assumptions or the statements contained in USQD.

The above findings were assessed by TVA as being attributable to the root causes defined in Section II.3.2 of the SNPP.

Per the DNE recommendation,-a Sequoyah Design Baseline and Verification Program was initiated under the SNPP. The focus of this project as it applies to configuration control is to assess the adequacy of post-modification work and correct deficiencies.

Specific directives of this project are:

1. Verifying and establishing the plant configuration.
2. Reconstructing the desigr basis.
3. Reviewing and evaluating modifications since OL issuance against the design basis.
4. Performing the required tests or modifications developed from this review and evaluatian.

The program encompasses all of those systems or portions of systems which are required to mitigate accidents analyzed in FSAR chapter 15 and. provide for safe shutdown. An additional effort, to be completed after restart, extends the program to system corrections not required for restart and to other safety related systems.

Methodology of the program includes development of design basis documents, performance of system walkdowns, evaluation of all changes to the systems, and comparison of all data to licensing commitments and design bases. The effort will follow through with correction of any discrepancies found. Independent verification of the program will be provided by DNE's Engineering Assurance group.

Page 7 of 13

i Revision 6 Another major action resulting from the SNPP and CNPP was total revision of the NQAM (See References 18 and 19). In the configuration control area, the NQAM now defines the program on a TVA generic " Quality" level and strengthens the"As-Constructed Drawing Discrepancy" form (SQN AI-25) by making it a permanent QA record. These changes are intended to implement the increased management commitment to configuration control.

Below the NQAM level, program changes made under the SNPP have at least partially satisfied the NSRS recommendations. Specific actions are as follows.

Recommendation I-85-473-NPS-01 " Systematic Configuration Control."

Section II.3.3 of the SNPP details a three part SQN design control improvement program. First a Change Control Board (CCB) consisting of senior plant personnel from management, licensing, QA, DNE and chaired by the Site Director was established. CCB objectives are to evaluate and minimize changes, review for adequate design control, implement a " closed loop" design feedback system, and track changes to ensure completion / closeout.

Secondly, a transitional design control system has been implemented under Sequoyah Engineering Procedure SQEP-13 (Reference 35). Key features of this program are a new unitized, integrated design package, review by a quality engineering group, management of each package by an assigned task engineer, and limitation of change scopes to ensure manageability. Finally, a permanent design control system will be implemented by DNE, based on the plant modification package concept. The goal of this system is to ensure that design drawings are:

All identified Prepared, reviewed for technical adequacy, and approved by qualified personnel Consistent with the appropriate design basis Developed and controlled in a systematic fashion Reviewed using suitable review / verification criteria Issued to appropriate personnel Updated to reflect actual plant configuration Accurately reflected in licensing documents Additionally the new program will force DNE to provide all supporting material and documentation including schedules, bills of material, USQD, calculations, tests, etc.

Page 8 of 13

Ravision 6 Recommendation I-85-~473-NPS-02 called for additional instructions on as-constructed drawing requirements. The request to provide

~ instructions for as-constructing bills of material, vendor manuals and instrument tabs has not been addressed. Similarly, no procedure yet exists for maintaining a drawing which is needed for maintenance, operation or modification but is not present in the DMS. Finally, AI-25 still shows the workplan cognizant engineer as. responsible for deciding plant configuration.

Recommendation I-85-473-NPS-03 to establish an as-constructed drawing review process as part of the workplan closecut has not been incorporated into AI-25.

Conclusion:

This evaluation produced findings which substantiate the facts forming the basis for the concern. The NSRS recommendations could correct the deficiencies. The corporate management attention to configuration control as evidenced by the CCTF and the new design control programs initiated under the CNPP are consistent with the NSRS recommendations. Until all of the commitments made in this area are implemented in working-level procedures, however, configuration control may continue to be inadequate when station modifications are made.

At present, the SQN ac-constructed drawings-do not completely represent the plant configuration, but the ongoing Sequoyah
Design Baseline and Verification Program should resolve the deficiencies and produce a set of accurate drawings.

IV. ROOT CAUSE The peccedures previously used for configuration control were inadequate to ensure that design changes were carried through to

'a completed station modification and revised design documents (drawings, specifications, etc.). Further, insufficient controls existed to mandate reporting of discrepancies in the as-constructed

' drawings.

V. GENERIC APPLICABILITY Concern XX-85-062-003 was a SQN-and BFN concern, XX-85-071-N05 was SQN specific, and BFN-IESC-85-03 was BFN specific. IN-85-984-001 was a WBN concern. The NSRS investigation report covered SQN, BFN, and BLN.

The recommendations made were specific to the plants as well as programmatic in nature, thus impacting.DNE. For this reason, the concerns are considered generic to all TVA nuclear plants.

l i

Page 9 of 13 i

Revision 6 VI. REFERENCES

1. 10CFR50, Appendix B, Criterion III, " Design Control;" Criterion V,

" Instructions, Procedures, and Drawings;" and Criterion VI,

" Document Control"

2. Topical Report TVA-TR75-1A, Sections 17.1 and 17.2, Revision 8
3. Nuclear Quality Assurance Manual (NQAM), Part II, Section 3.1,

" Plant Modifications: Before Issuances of the Operating License "

Revision 0, June 24, 1986

4. NQAM, Part II, Section 3.2, " Plant Modifications: After Licensing," Revision 0, June 24, 1986
5. NQAM, Part III, Section 1.1, " Document Control," Revision 0, June 18, 1986
6. Institute of Nuclear Power Operations (INPO) Corporate Evaluation, December 30, 1985, Finding 2.5A-4, WBN RIMS A02 851230 027
7. Nuclear Safety Review Staff (NSRS) Investigation Report I-d5-473-NPS, " Configuration Control at SQN, BFN, and BLN,"

March 7, 1986

8. SQN Administrative Instruction (AI)-25, Part 1, " Drawing Control After Unit Licensing," Revision 15, July 21, 1986; Part 2

" Revision of As-Constructed Drawings " Revision 0, October 25, 1985

9. Gilbert / Commonwealth Report No. 2600 dated October 1985,

" Assessment of the Design Control Program for the Sequoyah Nuclear Plant (SQN)"

10. Nuclear Perforaance Plan, Volume 1, " Corporate" (CNPP),

Revision 1, July 22, 1986

11. Nuclear Performance Plan, Volume 2, "Sequoyah" (SNPP), Revision 1 July 17, 1986
12. SQN - Corrective Action Report (CAR)03-008, " Contrary to the requirements of AI-25 and M&AI-3, as-constructed drawings do not always show the actual configuration of the plant." 03-27-84, closed 04-01-85
13. SQN - CAR-84-12-20, " Contrary to the requirements of AI-19, Part IV, Steps 4.4.7 and 4.4.8, the markup of drawings to reflect modification changes is not being performed in an adequate manner." 12-13-84, closed 09-19-85

)

Page 10 of 13

Rsvisicn 6

14. SQN - CAR-85-03-005, Contrary to the requirements of AI-25, Revision 10, vendor drawings used in the performance of maintenance activities affecting quality are not controlled or verified copies." March 14, 1985, closed April 11, 1986
15. Significant Condition Report (SCR) - Genims-8501-R1, " Untimely entry of OE nuclear drawing information into the Drawing Management System (DMS)," November 1, 1985, RIMS-B04-851104-001
16. Draft Quality Notice NQAM Part III, Section 1.1, " Interim Procedure for Using and Evaluating Vendor Drawings Which are not Included in the Ccnfiguration Control System," August 14, 1985
17. Quality Notice, NQAM Part III, Section 1.1, " Program for Including Vendor Drawings in the " Configuration Control" System,"

November 29, 1985

18. TVA Memorandum from S. A. White to NQAM Distribution List,

" Distribution of the Interim Nuclear Quality Assurance Manual (NQAM)," July 2, 1986, RIMS-L860702-805

19. TVA Memorandum from R. B. Kelly to NQAM Distribution List,

" Distribution of the Interim Nuclear Duality Assurance Manual (NQAM)," July 2, 1986, RIMS-L860702-805

20. TVA Memorandum from Configuration Control Task Force to S. A. White, " Office of Nuclear Power (ONP) - Configuration Control Task Force (CCTF) Final Report," June 30, 1986, RIMS-R15-860626-833
21. TVA Memorandum from R. K. Seiberling to Carl Crawford "FOI Request - Knoxville Journal," May 9, 1986, RIMS-Q01-860509-233
22. TVA Memorandum from D. C.-Cravens to B. M. Patterson," Corrective Action Report No. SQ-CAR-85-03-005 - Verification of Corrective Actions Involving the Use of Vendor Drawings," March 10, 1986
23. TVA Memorandum from B. M. Patterson to P. R. Wallace,

" CAR-85-03-005, Use of Vendor Drawings," July 23, 1985

24. TVA Memorandum Form B. M. Patterson to P. R. Wallace.

" CAR-85-03-005, Vendor Manual Problems," July 9, 1985

25. TVA Memorandum from T. G. Chapman to E. G. Beasley, " Documentation Problems Identified in Configuration Control Task Force Metting Notes of March 6, 1985," June 3, 1985, RIMS B45-850603-200
26. TVA Memorandum from R. D. Guthrie to Joe W. Anderson, " Request for Drawing Management System (DMS) Quality Control and Information Systems Analysis Services," May 3, 1985 RIMS-R25 850501 910 4

Page 11 of 13

- Rsvisicn 6

27. TVA Memorandum from J. B. Krell to All Plant Maintenance Employees. "Use of Drawings in Vendor Manuals " April 24, 1985
28. TVA Memorandum from K. W. Whitt to J. P. Darling, " Browns Ferry, Watts Bar, and Sequoyah Nuclear Plants - Review of Corrective Action Program - Nuclear Safety Review Staff Report No.

R-85-11-NPS," April 17, 1985, RIMS-Q01-850417-052

29. TVA Memorandum from D. C. Craven to J. B. Krell, " CAR No.

SQ-CAR-85-03-005 - Use of Vendor Drawings," May 1, 1985

30. TVA Memorandum from Michael L. Scalf to R. D. Guthrie, "DMS Overview " March 12, 1985, RIMS-B04-850312-440
31. TVA Memorandum from R. W. Wright to Design Services Files, " Browns Ferry Nuclear Plant (BFN) - Office of power Engineering Configuration Control Task Force (CCTF) " January 31, 1985, RIMS
32. TVA Memorandum from R. W. Cantrell to D. B. Bowen and R. G. Domer,

" Drawing Management System (DMS) - Engineering Projects Responsibilities," November 21, 1984, RIMS-IMS-841121-002

33. TVA Memorandum from R. D. Guthrie to Those Listed, " Configuration Control Task Force - Subtask Groups," October 9, 1984, RIMS-0EN-841011-011
34. Querytech Associates Report to R. Cantrell Dated September 1985

" Assessment of Engineering Design Control for the Browns Ferry Nuclear Plant"

35. Sequoyah Engineering Procedure SQEP-13, Revision 0; Procedure for Transitional Design Change Control
36. SQN Administrative Instruction (AI-19 Revision 17, Modifications '

after Licensing VII. IMMEDIATE OR LONG-TERM CORRECTIVE ACTION Corrective Action Tracking Dc. ament (CATD) 30713-SQN-01 was issued to I document the plant's response to Revision 0 of this report. The l l

Corrective Action Plan (CAP) states that SQEP 30 will be revised to include specific instructions on how to produce as-constructed drawings I which include notes only (typical drawings, bills of materials, etc). l The CAP further states that no action is required to establish an l as-constructed drawing review process to eliminate the single-point l failure mechanism presented by the workplan initiator's review of the IR6 drawings. The CAP supports this position by citing the AI-19 and AI-25 i requirements which instruct the workplan engineer to mark-up the l drawings to reflect the modification and prescribes a review by the DNE l I

engineer to ensure agreement with the design.

Page 12 of 13

  • Rivision 6 The report called for an improvement in the timeliness of drawing update i upon completion of the workplan. The original CAP stated that action l was in progress on this matter and cited a memorandum as the only I tangible evidence of the action. ECTG did not agree that sufficient I attention had been paid in this area and issued CATD 30713-SQN-02 to i formally request action. Commitments made by the CAP response include I revisions to both the modifications and engineering procedures. AI-19, 1 Part IV, will be revised to enable the workplan drawings to be sent to l DNE as soon as the required approval is obtained, i.e., routine _lR6 workplan-closure items accomplished after drawing update. Strong l management attention will be focused on ensuring that as the I modification is field complete, all appropriate steps are completed l in a timely manner to get the marked up drawings to DNE within the I time limit. I On the DNE side, revisions will be made to ensure that primary drawings I will be issued within 15 days, and secondary drawings will be issued I within 90 days from determination of system operability. The procedures I are expected to be in place by March 31, 1987. The process should be l implemented by June 30, 1987. l The responses as proposed by the original CAP and modified by the i later CAP have been accepted by ECTG. I l

i l

I Page 13 of 13 f

t

REFERENCE - ECPS112J-ECPS112C TENNESSEE VALLEY AUTHORITY PAGE - 1 FREQUENCY - REQUEST OFFICE OF NUCLEAR POWER RUN IlME - 12' ONP - ISSS - RHM EMPLOYEE CONCERN PROGRAM SYSTEM (ECPS) RUN DATE *- 10 LIST OF EMPLOYEE CONCERN INFORMATION S GENERIC KEYHORD A H APPL QTC/NSRS P KEYHORD B CONCERN SUB R PLT BBSH INVESTIGATION S CONCERN KEYHORD C-NUMBER CAT CAT D LOC FLQB REPORT R DESCRIPTION KEYHORD D l

XX 062-003 EN 20601 S HPS YYYY I-85-473-NPS SS SEQUOYAH, BROWNS FERRY: CI HAS UNOFF NONCONFORMANCE l ICIALLY INFORMED THAT THE DRAHINGS, DOCUMENT CONTRO

, T50127 OP 30713 S K-FORM IN MANY INSTANCES, ARE NOT A TRUE RE OPERATIONS t

PRESENTATION OF THE INSTALLATION. N GENERAL UCLEAR POWER CONCERN. CI HAS NO MOR E INFORMATION.

XX 071-N05 QA 80501 N SQN NNNN NS NRC IDENTIFIED THE FOLLOHINO CONCERN J K-FORM FROM REVIEW OF QTC FILE. "DRAHINGS IN THE CONTROL ROOM DO NOT REFLECT ACTUAL PLANT CONFIGURATIONS."

BFNIESC-85-03 QA 80501 S BFN YYYY SS CONCERNS EXPRESSED REGARDING 1. P QA 80604 S K-FORM ROCESS FOR EVALUATION OF 10CFR21 APP LICABILITY. 2. INADEQUATE UNDERSTA NDING OF THE LEVEL OF CONTROL REQUIR ED IN NUCLEAR PARTS PROGRAM IS INDIC ATIVE OF HEAKNESS IN NQAM. 3. CONF 1 IGURATION CONTROL.

IN 984-001 OP 30713 N HBN NNHY HS THE NUCLEAR POWER DEPARTMENT CHANGES DRAHINOS T50154 K-FORM HARDHARE HITHOUT CHANGING THE DRAHI DOCUMENT STATb5 NGS. EG LADDERS TO TOPS OF FILTER CIVIL CUBICLES IN AUXILLIARY BLDG. 91 AND STRUCTURES COMMON AREAS ON 676', 692' AND 737' ELEVATIONS HERE CUT IN HALF TO ALLO H REMOVAL DURING FILTER PLUG REMOVAL

, BUT DRAHING HERE NOT CHANGED. 198 2 CONSTR. DEPT. CONCERN. CI HAS NO 1 FURTHER INFORMATION. NO FOLLON REQU IRED.