First Interim Deficiency Rept Re Failure to Adequately Disposition Reportable Nonconformances.Initially Reported on 850224.Peer Review Continuing.Final Rept Expected 1 Yr Before Unit 1 Fuel Loading
ML20203A875
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 04/03/1986
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8604170615
Download: ML20203A875 (3)


Text

. .- _

o *

, . TENNESSEE VALLEY AUTHORITY CH ATTANOOG A. TENNESSEE 37401 SN 1578 Lookout Place J["SlAhrillS, 13Q)

SLRD-50-438/86-06 BLRD-50-439/86-05 U.S. Nuclear Regulatory Commission Region II Attention: Dr. J. Velson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

Dear Dr. Grace:

BELLEFONTE NUCLEAR PLANT UNIIS 1 AND 2 - FAILURE TO ADEQUATELY DISPOSITION REPORTABLE NONCONFORMANCES IN THE DIVISIONS OF NUCLEAR ENGINEERING AND NUCLEAR CONSTRUCTION - SLRD-50-438/86-06, BLRD-50-439/86 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-01E Inspector Art Johnson on February 24 and February 28, 1986 in accordance with 10 CFR 50.55(e) as SCRs BLN 4703 and BLN CEB 8604, 8605, 8606 respectively.

Enclosed is our first interim report. We expect to submit our final repert no later than one year before fuel loading of unit 1.

A delay of a few days in tre submittal of this report was discussed with NRC-0IE Inspector Art Johnson on March 27, 1986.

If there are any questions, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY l 5.

!v R. L. Gridley Manager of Licensing Enclosure l cc: Mr. James Taylor, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Records Center (Enclosure)

Institute of Nuciear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8604170615 Ehb0403 gDR ADOCK 05000438 PDR " r An Equal Opportunity Employer g

. ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 FAILURE TO ADEQUATELY DISPOSITION REPORTABLE NONCONFORMANCES IN THE DIVISIONS OF NUCLEAP ENGINEERING AND NUCLEAR CONSTRUCTION BLRD-50-438/86-06 AND BLRD-50-439/86-05 h 10 CFR 50.55(e)

SCR BLN 4703 AND SCR BLN CEB 8604 FIRST INTRRIM RRPORT Description of Deficiency In performing independent (" peer") reviews on 10 CFR 50.55(e) reportable nonconformance reports /significant condition reports (NCRs/SCRs), which were believed to be completed and ready for NRC closure, approximately 50 percent of the items were found to be incomplete for a variety of reasons, including inadequate or incomplete corrective actions (both in TVA's Division of Nuclear Engineering and Division of Nuclear Construction); incomplete, inadequate, or nonexistant review for generic implications; and inadequate action required to prevent recurrence. Based on these results, it is believed that a similar condition may exist for all TVA plants and may also apply to responses to violations or other responses made to NRC that contain significant commitments to NRC for TVA actions or design changes.

Examples of this are found in Bellefonte Nuclear Plant (BLN) SCR BLN 4703 and SCR BLN CEB 8604, 8605, and 8606, which were evaluated as reportable under 10 j

CFR 50.5 (e), and SCR BLN CEB 8607, 8608, and 8609, which were nonceportable.

This type of problem was also exhibited to some degree in the violation

]

1 received by TVA on Watts Bar Nuclear Plant concerning Control Room Design Review descrepancies, which was one of the factors resulting in the performance of the peer review for BLN items.

1 Safety Implications Failure to fully complete corrective actions, action required to prevent recurrence, or failure to perform adequate review for generic implications may result in an unsafe condition remaining uncorrected. As a result, the safe operation of the plant might be jeopardized.

Interim Progress The Bellefonte Site Director has issued R requirement for peer review of I,

all significant 50.55(e) items and violatic.s that contain significant corrective actions. This will be implemented in the Bellefonte Project Manual by June 30, 1986, and will ensure that final configurations and documentation meet commitments made in those responses and will emphasize consideration of aspects of a deficiency outside of those identified on the NCR or SCR being dispositioned.

. - _ . , , _ , _ _ . _ _ _ ~ _ _ . .- , _ ,,__.__,_,,___,__,,m_,_. . _ . _ _ . , _ _ . . , _ __ _

~ ,

TVA is in the process of issuing a generic SCR (SCR GEN NEB 8603) describing this condition as potentially applicable to all TVA plants. The need for further corrective actions, and actions to prevent recurrence for BLN and other TVA plants, will be evaluated in disposition of the generic SCR.

The final report on this matter will be provided upon completion but no later than one year before fuel loading of unit 1.