Issue date | Title | Topic | |
---|---|---|---|
ML20140G448 | 1 May 1997 | Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages | |
ML20115D200 | 9 July 1996 | Part 21 Rept Re Mfg Defect of Enterprise DSR-4 & DSRV-4 Edgs,Originally Mfg by Calcon Corp.Amot Control Corp Purchased Calcon Product Line & Maintains Design & Production.Valves Returned to Cooper Energy Svcs on 960131 | |
ML20058K384 | 9 December 1993 | Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head | |
ML20044G501 | 26 May 1993 | Part 21 Rept Re Buffer Amplifier Modules Mfg by Bailey Controls Co Containing Suspect Negative Ref Power Supply Having Safety Implications.Caused by Design Error in Circuitry.Modules Would Not Result in Miscalibration | |
ML20044G531 | 26 May 1993 | Suppl to 921207 Part 21 Rept Re Declutch Sys Anomaly in Certain Types of Valve Actuators Supplied by Limitorque Corp.Limitorque Designed New Declutch Lever Which Will Be Available in First Quarter 1993 | Stroke time |
ML18010B084 | 5 May 1993 | NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. | Safe Shutdown Boric Acid Shutdown Margin Loop seal Stroke time Temporary Modification Stress corrosion cracking Liquid penetrant Overspeed trip |
ML20127H230 | 15 January 1993 | Part 21 Rept Re Potential Defeat in Component of Dsrv & Dsr Enterprise Standby DG Sys.Starting Air Distributor Housing Assemblies Installed as Replacement Parts at Listed Sites | |
ML20126B042 | 17 December 1992 | Final Part 21 Rept Re Potential Problem W/Steel Cylinder Heads.Initially Reported on 921125.Caused by Inadequate Cast Wall Thickness at 3/4-inch-10 Bolt Hole.Stud at Location Indicated on Encl Sketch Should Be Removed | Loctite |
ML20126D721 | 16 December 1992 | Potential Part 21 Rept Re Actual Performance of Rosemount Supplied Bailey Bq Differential Pressure Transmitters Differing from Rosemount Original Spec.Bailey Controls Encl.Evaluation Not Yet Performed | |
ML18010A952 | 30 November 1992 | NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. | Nondestructive Examination Liquid penetrant |
ML20118B439 | 11 September 1992 | Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option | |
ML20248E012 | 13 September 1989 | Supplemental Part 21 Rept Re Potential Problem W/Six Specific Engine Control Devices in Air Start,Lube Oil, Jacket Water & Crankcase Sys.Initially Reported on 890429. California Controls Co Will Redesign Valve Seating | |
ML20246K740 | 26 April 1989 | Part 21 Rept Re Incorrectly Stamped Name Plates on Certain Asco Nuclear Qualified Valves.Vendor Will Contact Each Affected Facility & Furnish Correctly Stamped Plates & in Near Future Discontinue Sale of Rebuild Kits for Valves | |
ML20207P045 | 5 October 1988 | Part 21 Rept 146 Re Defect in Left Intercooler Inlet Adapter on Standby Diesel Engine Generator.Recommends Utils Inspect Left Intake Manifold Drain as Part of Operating Plan.Addl Info Expected by 881015 | |
ML20154J410 | 12 May 1988 | Addendum 1 to Supplemental Part 21 Rept 145 Re Potential Problem w/F-573-156 Pressure Sensor/Lube Oil Trip.Initially Reported on 880429.Addl 1-1/8-inch Diameter W/Deep Counterbone in Pressure Head Added to Activate Valve | |
ML20153B619 | 29 April 1988 | Part 21 Rept Re Potential Defect in Component of Dsr or Dsrv Standby Diesel Generators Supplied to Utils.Recommends Return of Subj Components in Onsite Warehouse Storage & Suggests Surveillance of Devices Already Installed | |
ML20237K820 | 26 August 1987 | TVA Employee Concerns Special Program Bellefonte Nuclear Plant Element Rept BLN-NSRS-2, Review of Nuclear Safety Review Staff Non-Startup Items at Bellefonte | Shutdown Margin Tornado Missile Earthquake |
ML20237K808 | 23 July 1987 | Rev 0 to TVA Employee Concern Special Program Bellefonte Nuclear Plant Element Rept BLN-NSRS-1, Review of Nuclear Safety Review Staff Startup Items at Bellefonte | Systematic Assessment of Licensee Performance |
ML20216E472 | 28 May 1987 | Part 21 Rept 140 Re Potential Defect in Air Pressure Regulators Mfg by Bellofram.Dripwell Gasket May Fail Due to Mismachining of Gasket Seating Surface Causing Loss of Control Air & Starting Air Pressure | |
ML20207R703 | 11 March 1987 | Part 21 Rept Re Potential Defect in Static Exciter Voltage Regulator (Sevr) Reset Design.Recommends Mod to Control Circuits to Energize Sevr Upon Receipt of Emergency Start Signal.Mods Will Be Completed by 870331 | |
ML20211P721 | 23 February 1987 | Part 21 Rept Re Rockbestos Coaxial Cable Used in Sorrento Electronics Digital & Analog high-range Radiation Monitor. Insulation Resistance at High Temp Not High Enough for Ion Chamber & Associated Electronics to Operate Properly | |
ML20210S315 | 4 February 1987 | Revised Final Deficiency Rept Re Unsuccessful Attempt to Synchronize Diesel Generator W/Sys.Initially Reported on 860730.Generator Endturns Cleaned & Greased Before Repairs Made.Permissive Sychronization Relay Scheme Installed | |
ML20207Q646 | 21 January 1987 | Forwards Two Lists Revising Commitment Completion Dates for Final Deficiency Repts.Encl 1 Lists Items to Be Completed at Least 6 Months Prior to Fuel Load.Encl 2 Lists Items Scheduled to Undergo Peer Review | |
ML20207Q660 | 21 January 1987 | Final Part 21 & Deficiency Rept Re Misinterpretation of Pipe Movement Data for Itt Grinnell Designed Pipe Supports. Initially Reported on 840208.Pipe Support Detail Sheet Reviewed & Incorrect Drawings Revised | |
ML20214K527 | 17 November 1986 | First Interim Deficiency Rept Re Missing Internal Lockwelds on Anchor Darling swing-check Valves.Initially Reported on 861016.Two Subj Valves Found Thus Far Inspected & Found Acceptable.Final Rept to Be Submitted 1 Yr Before Fuel Load | Anchor Darling |
ML20214G019 | 10 November 1986 | Revised Final Deficiency Rept Re Target Rock Solenoid Valves on post-accident Sampling Facility Not Meeting Backpressure Requirements.Corrective Action Will Not Be Complete Until 6 Months Before Fuel Load | |
ML20215G680 | 10 October 1986 | Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During Testing | Stroke time |
ML20215G535 | 10 October 1986 | Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During Testing | Stroke time |
ML20215F346 | 6 October 1986 | Final Part 21 & Deficiency Rept Re Failure to Adequately Disposition Reportable Nonconformances in Divs of Nuclear Engineering & Nuclear Const.Initially Reported on 860224. Changes to Corrective Action Program Listed | |
ML20210L707 | 22 September 1986 | Interim Deficiency Rept SCR Bln 4949 Re Use of Long Slotted Holes W/O Plate Washers.Initially Reported on 860822. Investigation of Reactor Bldgs & Pipe Support Connections Required to Determine If Corrective Action Needed | |
ML20210T037 | 15 September 1986 | Second Revised Final Deficiency Rept Re Attachment of Pipe Supports to 6-inch Strip Plates Lacking Capacity to Withstand Seismic Pipe Support Loads.Initially Reported on 811231.All Affected Supports Identified & Procedure Revised | |
ML20203M028 | 19 August 1986 | Part 21 & First Interim Deficiency Rept SCR Bln 4921 Re Closing Assist Spring Failure on Atwood & Morrill Msivs. Initially Reported on 860721.Testing to Assure Soundness of Springs Underway.Next Rept Expected 1 Yr Prior to Fuel Load | Safe Shutdown |
ML20205F614 | 13 August 1986 | Part 21 Rept Re Connecting Rod Bolts for Dsrv Engines.Listed Procedures Recommended for Next Connecting Rod Insp, Including Replacement of Bolts Due to Cracked Threads & Large Grooves & Galls in Threads | |
ML20203K415 | 6 August 1986 | Final Deficiency Rept Re Incorrect Insulation Weights for Intake Pumping Station Piping.Initially Reported on 840221. Calculations for Insulation Weights Completed & Documented. Drawings Revised to Reflect New Weights | Design basis earthquake |
ML20214H186 | 1 August 1986 | Final Deficiency Rept Re Error in Seismic Data Used in Auxiliary Control Bldg Design.Initially Reported on 840406. Revised Fixed Damped Response Spectra for Auxiliary Control Bldg Generated | Earthquake |
ML20212D331 | 30 July 1986 | Final Deficiency Repts Ncr Bln 3684 & Ncr Bln 4254 Re Conduit Support Stiffener Plates Not Installed Per Drawing. Initially Reported on 840510.Electrical QC & Engineering Personnel Retrained in Procedures | |
ML20212B200 | 18 July 1986 | Final Deficiency Rept Re Unconservative Flange Qualification Analysis.Initially Reported on 841207.Caused by Misinterpretation of ASME Code Section Iii,Subsection NC-3658.1 (S76) | |
ML20212B373 | 17 July 1986 | Part 21 & Revised Final Deficiency Rept Ncr Bln 2393 Re High Vibration Levels Measured for Bingham-Willamette Pumps. Initially Reported on 830622.Cause of Deficiency Unknown. Problem Does Not Represent Problem at Any TVA Facility | Safe Shutdown Earthquake |
ML20206U059 | 2 July 1986 | Part 21 Rept Re Potential Defect in Component of Dsrv Standby Diesel Generators,Involving Problem W/Fastening of Engine Connecting Rod Assembly Which Could Result in Engine Nonavailability.Procedure Will Be Issued by 860718 | |
ML20203B911 | 2 July 1986 | Part 21 & Final Deficiency Rept Re Foreign Matl in C&D Batteries.Initially Reported on 840822.Batteries Will Be Replaced W/New Batteries Which Do Not Use Reigel Wrap in Const | Safe Shutdown |
ML20207L158 | 18 June 1986 | Final Part 21 & Deficiency Rept Re Design Problems W/B&W Steam Generators.Initially Reported on 820830.Nozzles Supplying Auxiliary Feedwater to Internal Headers Capped Off & New External Headers Installed to Preclude Failures | |
ML20206J897 | 11 June 1986 | Final Deficiency Rept Re Erroneous Dimensions for American Boa B1-0 Flexible Conduit Appearing in Electrical Design Std DS-E13.1.7.Initially Reported on 860515.Std Will Be Revised | |
ML20211B172 | 28 May 1986 | Final Part 21 & Deficiency Rept Re Ruskin Fire Damper Installation & Closure Problems.Initially Reported on 840411.Caused by Improper Util Installation & Inadequate Testing by Mfg to Establish Closure Criteria | Fire Barrier Condition Adverse to Quality |
ML20198K310 | 15 May 1986 | Revised Final Deficiency Rept Re Insulation Weights Assumed in Analyses for Valves & Pipe Fittings.Initially Reported on 840123.All Affected Piping Sys Will Be Reanalyzed. Rigorous Analysis Handbook Will Be Updated by 860601 | |
ML20197H258 | 8 May 1986 | Part 21 Rept 135 Re Defect W/Lube Oil Sump Tank Foot Valve of Standby Diesel Generator.Caused by Extrusion of Liner Matl Due to Overpressurization.Corrective Actions Being Developed.List of Affected Sites Modified | |
ML20155J132 | 7 May 1986 | Final Deficiency Rept Re Omissions to Auxiliary Feedwater Pump Drawings.Initially Reported on 820225.Required Piping Will Be Designed & Placed on Appropriate Drawings | |
ML20203N417 | 30 April 1986 | Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications | Nondestructive Examination Liquid penetrant |
ML20203C260 | 8 April 1986 | Final Deficiency Rept Re Defect in Overlap Modeling Techniques.Initially Reported on 840801.Rigorous Analysis Handbook Revised to Incorporate Techniques in NUREG/CR-1980. Corrective Actions Will Be Done 6 Months Before Fuel Load | |
ML20155C276 | 4 April 1986 | Final Deficiency Rept Re Use of Nonconservative Analyses of Insulation Weights for Valves & Pipe Fittings.Initially Reported on 840123.Corrective Actions Will Be Completed 6 Months Prior to Fuel Load | |
ML20203A875 | 3 April 1986 | First Interim Deficiency Rept Re Failure to Adequately Disposition Reportable Nonconformances.Initially Reported on 850224.Peer Review Continuing.Final Rept Expected 1 Yr Before Unit 1 Fuel Loading |