Part 21 & Final Deficiency Rept Re Foreign Matl in C&D Batteries.Initially Reported on 840822.Batteries Will Be Replaced W/New Batteries Which Do Not Use Reigel Wrap in Const
ML20203B911
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 07/02/1986
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-86, REF-PT21-86-263-000 PT21-86-263, PT21-86-263-000, NUDOCS 8607180316
Download: ML20203B911 (2)


Text

o ,- o TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 SN 157B Lookout Place

, i P2'.d'

'JUL 2 886 BLRD-50-438/84-46 BLRD-50-439/84-42 U.S. Nuclear Regulatory Comission Region II Attn: Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

Dear Dr. Grace:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - FOREIGN MATERIAL IN BATTERIES BY C&D BATTERIES - BLRD-50-438/84-46. BLRD-50-439/84 EINAL REPORT The subject deficiency was initially reported to NRC-OIE Inspector P. E. Fredrickson on August 22, 1984 in accordance with 10 CFR 50.55(e) as NCR BLN EEB 8416. Thit. was followed by our first interim report dated September 19, 1984. Enclosed is our final report. We consider 10 CFR Part 21 applicable to this deficiency.

If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours.

TENNESSEE VALLEY AUTHORITY

/

R. L. Gridley Director Enclosure Nuclear Safety and Licensing cc: Mr. James Taylor, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Comission Washington, D.C. 20555 Records Center (Enclosure)

Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8607180316 860702 PDR ADOCK 05000438 S PDR *

\

z An Equal Opportunity Employer

a . p ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 FOREIGN MATERIAL IN BATTERIES BY C&D BATTERIES BLRD-50-438/84-46, BLRD-50-439/84-42 10 CFR 50.55(e)

NCR BLN EEB 8416 FINAL REPORT Description of Deficiency Battery 1EB-EU-50-D (C&D type LC33) failed to deliver catalog capacity during the performance of preoperational test PT-EU-OlA in May and September 1983.

Subsequent tests and inspections of cells from this battery by the vendor (C&D Batteries of Plymouth Meeting, Pennsylvania) revealed that the root cause of the deficiency is the "reigel wrap" material which was used as a mat between the cell positive plates and the separators. The "reigel wrap" is shedding and filling the cell area normally reserved as " sediment space". This condition coupled with the normal shedding of active material from the plates is increasing the potential for internal short circuits. C&D has determined that this is the cause of the low capacity exhibited by the 1EB-EU-50-D battery.

This condition is not generic to other TVA plants since no other batteries have been supplied to TVA which use the "reigel wrap" material.

Safety Tmplications Ifthedeficiench'remaineduncorrectedthebatterycapacitywouldcontinueto decrease due to the shedding "reigel wrap" material and its subsequent affect on capacity noted above. Eventually the battery would no longer have .

sufficient capacity to perform its intended safety function in support of a safe shutdown. This condition could have jeopardized the safe operation of the plant had it remained uncorrected.

Corrective Action All eight vital batteries associated with units 1 and 2 will be replaced with new batteries which do not use "reigel wrap" in their construction. This action will be completed by six months before fuel load of the applicable unit.

The action taken to prevent recurrence has been accomplished by C&D by discontinuing the use of "reigel wrap" in the construction of their batteries.

~