 Issue dateTitleTopic
ML20140G4481 May 1997Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages
ML20115D2009 July 1996Part 21 Rept Re Mfg Defect of Enterprise DSR-4 & DSRV-4 Edgs,Originally Mfg by Calcon Corp.Amot Control Corp Purchased Calcon Product Line & Maintains Design & Production.Valves Returned to Cooper Energy Svcs on 960131
ML20058K3849 December 1993Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head
ML20044G53126 May 1993Suppl to 921207 Part 21 Rept Re Declutch Sys Anomaly in Certain Types of Valve Actuators Supplied by Limitorque Corp.Limitorque Designed New Declutch Lever Which Will Be Available in First Quarter 1993Stroke time
ML20044G50126 May 1993Part 21 Rept Re Buffer Amplifier Modules Mfg by Bailey Controls Co Containing Suspect Negative Ref Power Supply Having Safety Implications.Caused by Design Error in Circuitry.Modules Would Not Result in Miscalibration
ML20127H23015 January 1993Part 21 Rept Re Potential Defeat in Component of Dsrv & Dsr Enterprise Standby DG Sys.Starting Air Distributor Housing Assemblies Installed as Replacement Parts at Listed Sites
ML20126B04217 December 1992Final Part 21 Rept Re Potential Problem W/Steel Cylinder Heads.Initially Reported on 921125.Caused by Inadequate Cast Wall Thickness at 3/4-inch-10 Bolt Hole.Stud at Location Indicated on Encl Sketch Should Be RemovedLoctite
ML20126D72116 December 1992Potential Part 21 Rept Re Actual Performance of Rosemount Supplied Bailey Bq Differential Pressure Transmitters Differing from Rosemount Original Spec.Bailey Controls Encl.Evaluation Not Yet Performed
ML20118B43911 September 1992Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option
ML20248E01213 September 1989Supplemental Part 21 Rept Re Potential Problem W/Six Specific Engine Control Devices in Air Start,Lube Oil, Jacket Water & Crankcase Sys.Initially Reported on 890429. California Controls Co Will Redesign Valve Seating
ML20246K74026 April 1989Part 21 Rept Re Incorrectly Stamped Name Plates on Certain Asco Nuclear Qualified Valves.Vendor Will Contact Each Affected Facility & Furnish Correctly Stamped Plates & in Near Future Discontinue Sale of Rebuild Kits for Valves
ML20207P0455 October 1988Part 21 Rept 146 Re Defect in Left Intercooler Inlet Adapter on Standby Diesel Engine Generator.Recommends Utils Inspect Left Intake Manifold Drain as Part of Operating Plan.Addl Info Expected by 881015
ML20154J41012 May 1988Addendum 1 to Supplemental Part 21 Rept 145 Re Potential Problem w/F-573-156 Pressure Sensor/Lube Oil Trip.Initially Reported on 880429.Addl 1-1/8-inch Diameter W/Deep Counterbone in Pressure Head Added to Activate Valve
ML20153B61929 April 1988Part 21 Rept Re Potential Defect in Component of Dsr or Dsrv Standby Diesel Generators Supplied to Utils.Recommends Return of Subj Components in Onsite Warehouse Storage & Suggests Surveillance of Devices Already Installed
ML20216E47228 May 1987Part 21 Rept 140 Re Potential Defect in Air Pressure Regulators Mfg by Bellofram.Dripwell Gasket May Fail Due to Mismachining of Gasket Seating Surface Causing Loss of Control Air & Starting Air Pressure
ML20207R70311 March 1987Part 21 Rept Re Potential Defect in Static Exciter Voltage Regulator (Sevr) Reset Design.Recommends Mod to Control Circuits to Energize Sevr Upon Receipt of Emergency Start Signal.Mods Will Be Completed by 870331
ML20211P72123 February 1987Part 21 Rept Re Rockbestos Coaxial Cable Used in Sorrento Electronics Digital & Analog high-range Radiation Monitor. Insulation Resistance at High Temp Not High Enough for Ion Chamber & Associated Electronics to Operate Properly
ML20210S3154 February 1987Revised Final Deficiency Rept Re Unsuccessful Attempt to Synchronize Diesel Generator W/Sys.Initially Reported on 860730.Generator Endturns Cleaned & Greased Before Repairs Made.Permissive Sychronization Relay Scheme Installed
ML20207Q64621 January 1987Forwards Two Lists Revising Commitment Completion Dates for Final Deficiency Repts.Encl 1 Lists Items to Be Completed at Least 6 Months Prior to Fuel Load.Encl 2 Lists Items Scheduled to Undergo Peer Review
ML20207Q66021 January 1987Final Part 21 & Deficiency Rept Re Misinterpretation of Pipe Movement Data for Itt Grinnell Designed Pipe Supports. Initially Reported on 840208.Pipe Support Detail Sheet Reviewed & Incorrect Drawings Revised
ML20214K52717 November 1986First Interim Deficiency Rept Re Missing Internal Lockwelds on Anchor Darling swing-check Valves.Initially Reported on 861016.Two Subj Valves Found Thus Far Inspected & Found Acceptable.Final Rept to Be Submitted 1 Yr Before Fuel LoadAnchor Darling
ML20214G01910 November 1986Revised Final Deficiency Rept Re Target Rock Solenoid Valves on post-accident Sampling Facility Not Meeting Backpressure Requirements.Corrective Action Will Not Be Complete Until 6 Months Before Fuel Load
ML20215G53510 October 1986Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During TestingStroke time
ML20215G68010 October 1986Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During TestingStroke time
ML20215F3466 October 1986Final Part 21 & Deficiency Rept Re Failure to Adequately Disposition Reportable Nonconformances in Divs of Nuclear Engineering & Nuclear Const.Initially Reported on 860224. Changes to Corrective Action Program Listed
ML20210L70722 September 1986Interim Deficiency Rept SCR Bln 4949 Re Use of Long Slotted Holes W/O Plate Washers.Initially Reported on 860822. Investigation of Reactor Bldgs & Pipe Support Connections Required to Determine If Corrective Action Needed
ML20210T03715 September 1986Second Revised Final Deficiency Rept Re Attachment of Pipe Supports to 6-inch Strip Plates Lacking Capacity to Withstand Seismic Pipe Support Loads.Initially Reported on 811231.All Affected Supports Identified & Procedure Revised
ML20203M02819 August 1986Part 21 & First Interim Deficiency Rept SCR Bln 4921 Re Closing Assist Spring Failure on Atwood & Morrill Msivs. Initially Reported on 860721.Testing to Assure Soundness of Springs Underway.Next Rept Expected 1 Yr Prior to Fuel LoadSafe Shutdown
ML20205F61413 August 1986Part 21 Rept Re Connecting Rod Bolts for Dsrv Engines.Listed Procedures Recommended for Next Connecting Rod Insp, Including Replacement of Bolts Due to Cracked Threads & Large Grooves & Galls in Threads
ML20203K4156 August 1986Final Deficiency Rept Re Incorrect Insulation Weights for Intake Pumping Station Piping.Initially Reported on 840221. Calculations for Insulation Weights Completed & Documented. Drawings Revised to Reflect New WeightsDesign basis earthquake
ML20214H1861 August 1986Final Deficiency Rept Re Error in Seismic Data Used in Auxiliary Control Bldg Design.Initially Reported on 840406. Revised Fixed Damped Response Spectra for Auxiliary Control Bldg GeneratedEarthquake
ML20212D33130 July 1986Final Deficiency Repts Ncr Bln 3684 & Ncr Bln 4254 Re Conduit Support Stiffener Plates Not Installed Per Drawing. Initially Reported on 840510.Electrical QC & Engineering Personnel Retrained in Procedures
ML20212B20018 July 1986Final Deficiency Rept Re Unconservative Flange Qualification Analysis.Initially Reported on 841207.Caused by Misinterpretation of ASME Code Section Iii,Subsection NC-3658.1 (S76)
ML20212B37317 July 1986Part 21 & Revised Final Deficiency Rept Ncr Bln 2393 Re High Vibration Levels Measured for Bingham-Willamette Pumps. Initially Reported on 830622.Cause of Deficiency Unknown. Problem Does Not Represent Problem at Any TVA FacilitySafe Shutdown Earthquake
ML20206U0592 July 1986Part 21 Rept Re Potential Defect in Component of Dsrv Standby Diesel Generators,Involving Problem W/Fastening of Engine Connecting Rod Assembly Which Could Result in Engine Nonavailability.Procedure Will Be Issued by 860718
ML20203B9112 July 1986Part 21 & Final Deficiency Rept Re Foreign Matl in C&D Batteries.Initially Reported on 840822.Batteries Will Be Replaced W/New Batteries Which Do Not Use Reigel Wrap in ConstSafe Shutdown
ML20207L15818 June 1986Final Part 21 & Deficiency Rept Re Design Problems W/B&W Steam Generators.Initially Reported on 820830.Nozzles Supplying Auxiliary Feedwater to Internal Headers Capped Off & New External Headers Installed to Preclude Failures
ML20206J89711 June 1986Final Deficiency Rept Re Erroneous Dimensions for American Boa B1-0 Flexible Conduit Appearing in Electrical Design Std DS-E13.1.7.Initially Reported on 860515.Std Will Be Revised
ML20211B17228 May 1986Final Part 21 & Deficiency Rept Re Ruskin Fire Damper Installation & Closure Problems.Initially Reported on 840411.Caused by Improper Util Installation & Inadequate Testing by Mfg to Establish Closure CriteriaFire Barrier
Condition Adverse to Quality
ML20198K31015 May 1986Revised Final Deficiency Rept Re Insulation Weights Assumed in Analyses for Valves & Pipe Fittings.Initially Reported on 840123.All Affected Piping Sys Will Be Reanalyzed. Rigorous Analysis Handbook Will Be Updated by 860601
ML20197H2588 May 1986Part 21 Rept 135 Re Defect W/Lube Oil Sump Tank Foot Valve of Standby Diesel Generator.Caused by Extrusion of Liner Matl Due to Overpressurization.Corrective Actions Being Developed.List of Affected Sites Modified
ML20155J1327 May 1986Final Deficiency Rept Re Omissions to Auxiliary Feedwater Pump Drawings.Initially Reported on 820225.Required Piping Will Be Designed & Placed on Appropriate Drawings
ML20203C2608 April 1986Final Deficiency Rept Re Defect in Overlap Modeling Techniques.Initially Reported on 840801.Rigorous Analysis Handbook Revised to Incorporate Techniques in NUREG/CR-1980. Corrective Actions Will Be Done 6 Months Before Fuel Load
ML20155C2764 April 1986Final Deficiency Rept Re Use of Nonconservative Analyses of Insulation Weights for Valves & Pipe Fittings.Initially Reported on 840123.Corrective Actions Will Be Completed 6 Months Prior to Fuel Load
ML20203A8753 April 1986First Interim Deficiency Rept Re Failure to Adequately Disposition Reportable Nonconformances.Initially Reported on 850224.Peer Review Continuing.Final Rept Expected 1 Yr Before Unit 1 Fuel Loading
ML20205M02531 March 1986Final Deficiency Rept Ncr 4490 Re Piping Component Support Welds Not Meeting Insp Criteria.Initially Reported on 850927.Visual QA Certification of Inspectors Implemented. Item Not Reportable Per 10CFR50.55(e)
ML20202G97428 March 1986Final Part 21 & Deficiency Rept Re Failure of BIF Butterfly Valve Seats.Initially Reported on 820511.Seat Failures Reworked.Informal Tests Performed After Seat Replacement Show That Leakage Corrected
ML20202J00927 March 1986Final Part 21 & Deficiency Rept Re Failure of Main Steam Lines Due to Main Feedwater Overfill.Initially Reported on 800319.B&W Will Provide Design for safety-grade Main Feedwater Overfill Protection Sys for Steam GeneratorsSafe Shutdown
ML20202J33424 March 1986Final Deficiency Rept Re out-of-date Design Criteria for DHR & Core Flooding Sys.Initially Reported on 830405.Caused by Deferral of Paperwork.All Design Criteria Documents Reviewed & Revised to Incorporate Outstanding Design Input Memos
ML20205L66124 March 1986Final Deficiency Rept Re Incorrect Installation of Pressure Relief & Safety Valves.Initially Reported on 820305.Relief Valve Piping Will Be Redesigned to Provide Adequate Vent Area