ML20202D730

From kanterella
Revision as of 04:14, 15 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Violation from Insp on 970921-1025.Violation noted:10CFR50.59 SE Had Not Been Performed as Required within 90 Days on Wds Piping non-conforming Condition
ML20202D730
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/24/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20202D727 List:
References
50-302-97-16, NUDOCS 9712050142
Download: ML20202D730 (4)


Text