ML20202H227

From kanterella
Revision as of 23:22, 14 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Part 21 & Final Deficiency Rept D/N #62 Re Potential Overspeed Trip in Diesel Generators Mfg by Colt Industries. Initially Reported on 860224.Vendor Forwarded Proposed Mods Whereby Air Will Be Positively Vented After Engine Started
ML20202H227
Person / Time
Site: Satsop
Issue date: 03/26/1986
From: Olson P
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
REF-PT21-86, REF-PT21-86-119-000 D-N-#62, GO3-86-183, PT21-86-119, PT21-86-119-000, NUDOCS 8604150162
Download: ML20202H227 (3)


Text