ML20203B254

From kanterella
Revision as of 19:29, 14 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Submits Current Status of Plant Design,Const & Preoperational Phase Testing.Util in Final Process of Testing Plant in Preparation for Fuel Load.Fuel Load Anticipated in Late June or Early Jul 1986
ML20203B254
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/16/1986
From: Hall D
ILLINOIS POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
U-600506, NUDOCS 8604180097
Download: ML20203B254 (11)


Text