IR 05000245/1986021
From kanterella
ML20205F519 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 03/12/1987 |
From: | Collins S, Howe A, Keller R, Lange D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
To: | |
Shared Package | |
ML20205F487 | List: |
References | |
50-245-86-21OL, NUDOCS 8703310186 | |
Download: ML20205F519 (158) | |
Similar Documents at Millstone | |
---|---|
Category:EXAMINATION REPORT
MONTHYEARIR 05000423/19970041997-08-12012 August 1997
[Table view]Exam Rept 50-423/97-04(OL) on 970707-11.Exam Results:All RO & SRO Applicants Passed All Portions of Exams ML20134K1721997-02-0707 February 1997 NRC Operator Licensing Exam Rept 50-245/96-12 Administered on 961202-06.Exam Results:Six of Seven Applicants Failed Exams & One Passed,But License Was Not Issued Due to Required Plant Manipulations Not Being Completed IR 05000245/19930251993-10-0101 October 1993 Exam Rept 50-245/93-25-OL on 930914-16.Exam Results: Requalification Exams Were Administered to 8 ROs & 7 Sros. All 15 Licensed Operators Passed All Portions of Exam IR 05000336/19920331993-01-27027 January 1993 Requalification Exam Rept 50-336/92-33OL-RQ on 921214-17. Exam results:14 Licensed Operators Passed All Portions of Exam,Including Evaluation of Three Operating Crews. Requalification Program Determined to Be Satisfactory IR 05000423/19920251992-12-21021 December 1992 Exam Rept 50-423/92-25 (OL-RQ) on 921116-19.Exam Results: All Four Operators Passed Exams.Two SROs & ROs Operated Successfully as Crew During Two Simulator Scenarios.Results of Exam Combined W/Results of Previous Requalification Exam IR 05000245/19900101990-10-26026 October 1990 Exam Rept 50-245/90-10OL on 900827-31.Exam Results:Three of Five SROs & Three ROs Passed Operating & Written Tests IR 05000366/19900271990-10-15015 October 1990 Exam Rept 50-366/90-27OL on 901003.Exam Results:Reactor Operator Candidate Passed Written Exam & Issued Reactor Operator License on 901009 IR 05000336/19900101990-07-20020 July 1990 Requalification Program Audit Rept 50-336/90-10OL-RQ on 900618-22.Audit Results:Training Program Rated Satisfactory IR 05000423/19890051989-05-0303 May 1989 Exam Rept 50-423/89-05OL on 890321-23.Exam Results:All Candidates Successfully Completed Both Written & Operating Parts of Respective Exams Except for One Reactor Operator That Failed Section 1 of Written Exam IR 05000245/19880161989-03-17017 March 1989 Exam Rept 50-245/88-16OL on 881107-10.Exam Results:All Reactor Operator Candidates Passed Exams.Six Senior Reactor Operator (SRO) Candidates Passed Written Exam & Operating Test.One SRO Candidate Failed Written Exam IR 05000336/19880171988-09-12012 September 1988 Exam Rept 50-336/88-17OL Administered During Wk of 880718. Exam Results:Written & Operating Exams Administered to Three Senior Reactor Operator Upgrade Candidates.All Three Passed IR 05000336/19870311988-03-25025 March 1988 Exam Rept 50-336/87-31OL on 880111-14.Exam Results:Six Reactor Operators & Two Instant Senior Reactor Operators Passed Exam IR 05000423/19870281988-03-16016 March 1988 Exam Rept 50-423/87-28OL on 871214-18.Exam Results:Three Senior Reactor Operator (SRO) Candidates & Two Reactor Operator (RO) Candidates Passed Written/Operating Exams.One RO Candidate Failed Operating Exam & One SRO Failed Both IR 05000245/19870231987-11-19019 November 1987 Exam Rept 50-245/87-23OL on 870921-25.Exam Results:Five Senior Reactor Operators Passed Exams.Two Senior Reactor Operators Failed.Related Info Encl IR 05000423/19870231987-11-0606 November 1987 Requalification Exam Rept 50-423/87-23OL on 870612,0731 & 0904.Exam Results:All Senior Reactor Operators (Sros) & Reactor Operators (Ros) Passed Operating Portion of Exams. Three SROs & Two ROs Failed Written Exams IR 05000423/19870161987-10-0909 October 1987 Exam Rept 50-423/87-16OL on 870818-20.Exam Results:One Senior Reactor Operator Candidate Failed Written Exam & Two Failed Operating Exam IR 05000245/19860211987-03-12012 March 1987 Exam Rept 50-245/86-21OL on 861215-19.Exam Results:All Candidates Passed Exams.Accuracy of Simulator Cause & Malfunction Book & Number of Errors Found in Training Matl Raised Concern IR 05000336/19860251987-03-0404 March 1987 Requalification Program Audit Rept 50-336/86-25OL on 861113 & 870105-16.Audit Results:Evaluation of Facility Written Exam Grading & Overall Program Evaluation Satisfactory IR 05000423/19860311987-03-0303 March 1987 Exam Rept 50-423/86-31OL on 861215-19.Exam Results:Four Senior Reactor Operator (Sro),Seven Reactor Operator & One Instructor Certification Candidate Received Licenses. One SRO Failed Simulator Portion of Operating Exam IR 05000336/19860221987-02-0404 February 1987 Exam Rept 50-336/86-22OL on 861215.Exam Results:One Reactor Operator Candidate & One Senior Reactor Operator Candidate Passed Operating Exam.Both Issued Licenses IR 05000336/19860101986-09-15015 September 1986 Exam Rept 50-336/86-10OL on 860707-11.Exam Results:Seven Senior Reactor & Five Reactor Operator Licenses Issued.Two Candidates Failed Simulator Exam & One Candidate Failed Written Exam.Exam & Answer Key Encl IR 05000423/19860101986-07-0202 July 1986 Exam Rept 50-423/86-10 on 860331-0404.Exam Results:Three Reactor Operator & Six of Nine Senior Reactor Operator Candidates Passed All Portions of Exam.Problem Continues Re Lack of Proper Exam Security IR 05000423/19850451986-01-22022 January 1986 Exam Rept 50-423/85-45 on 851030-31.Exam Results:One Reactor Operator & Seven Senior Reactor Operator Candidates Passed IR 05000245/19850211985-12-0202 December 1985 Exam Rept 50-245/85-21 During Wk of 850812.Exam Results:One of Six Reactor Operator Candidates & One of Four Senior Reactor Operator Candidates Failed Both Written & Oral Exams.Supporting Documentation Encl IR 05000423/19850441985-11-13013 November 1985 Exam Rept 50-423/85-44(OL) on 850903-06 & 09-12.Exam results:11 Out of 14 Senior Reactor Operator & 3 Out of 4 Reactor Operator Candidates Passed All Portions of Exams & Will Be Issued Licenses ML20133M2181985-08-0202 August 1985 Exam Rept 50-423/OL-85-15 on 850514-17 & 21-23.Exam Results: Two Reactor Operators & Nine Senior Reactor Operators Passed.Three Reactor Operators & Seven Senior Reactor Operators Failed 1997-08-12 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000245/19990081999-09-14014 September 1999
[Table view]Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations Noted & Being Treated as Ncvs. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000423/19990071999-08-27027 August 1999 Insp Rept 50-423/99-07 on 990614-0715.Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Review of C/A Program Using IP 40500, Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000336/19990061999-07-19019 July 1999 Insp Repts 50-336/99-06 & 50-423/99-06 on 990420-0614.Ten Violations Occurred & Being Treated as non-cited Violations. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000336/19982191999-06-10010 June 1999 Insp Rept 50-336/98-219 on 981214-18,990126-29,0208-19 & 0301-05.Noncited Violations Identified.Major Areas Inspected:Exam of Licensee Corrective Action Implementation IR 05000245/19990051999-06-0404 June 1999 Errata to Insp Repts 50-245/99-05,50-336/99-05 & 50-423/99-05,consisting of Figure 1 ML20207G1211999-06-0303 June 1999 Insp Repts 50-245/99-05,50-336/99-05 & 50-423/99-05 on 990302-0419.No Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML20207F1521999-05-25025 May 1999 Notice of Violation from Investigation Rept 1-94-021 on 940506-960329.Violation Noted:Between 740831-910407,licensee Made Changes to Facility Described in Safety Analysis Rept for Refueling Core Offloads Without Performing Evaluation ML20196K2621999-05-24024 May 1999 EN-99-020:on 980525,notice of Violation & Exercise of Enforcement Discretion Will Be Issued to Licensee.Action Based on Severity Level III Problem Consisting of Four Individual Violations Involving Refueling Outage PNO-I-99-022, on 990509,Millstone Unit 2 Established Reactor Criticality.Nrc Staff Providing Augmented Insp Coverage of Restart Activities,Including round-the-clock Observations of Licensee Activities During Key Operational Evolutions1999-05-11011 May 1999 PNO-I-99-022:on 990509,Millstone Unit 2 Established Reactor Criticality.Nrc Staff Providing Augmented Insp Coverage of Restart Activities,Including round-the-clock Observations of Licensee Activities During Key Operational Evolutions IR 05000336/19990031999-05-10010 May 1999 Insp Rept 50-336/99-03 on 990322-26.No Violations Noted. Major Areas Inspected:Review of Actions Taken by Util to Resolve Significant Issues List Item 21,fire Protection ML20206F4601999-04-30030 April 1999 Insp Rept 50-336/99-04 on 990315-31.Violation Noted.Major Areas Inspected:Monitored Licensee Activities During Plant Transition Between Operational Modes,Both During Normal & off-normal Working Hours PNO-I-99-016, on 990406,operators Initiated Plant Cooldown from Normal Operating Pressure & Temp in Mode 3,hot Standby. Cooldown Was Necessary to Minimize Further Degradation of Bonnet Pressure Seal for Valve 2-SI-652 & to Repair Valve1999-04-0707 April 1999 PNO-I-99-016:on 990406,operators Initiated Plant Cooldown from Normal Operating Pressure & Temp in Mode 3,hot Standby. Cooldown Was Necessary to Minimize Further Degradation of Bonnet Pressure Seal for Valve 2-SI-652 & to Repair Valve ML20205M7201999-04-0606 April 1999 Notice of Violation from NRC OI Case 1-96-002 & Conclusions of Millstone Independent Review Team.Violation Noted. E Debarba,Deliberately Discriminated Against Supervisor in Performance Engineering Group at Millstone Station ML20205M7351999-04-0606 April 1999 Notice of Violation from Investigation in Case Numbers 1-96-002 & 1-97-007.Violation Noted:Licensee Discriminated Against Supervisor in Performance Engineering Group at Plant Due to Involvement in Protected Activities IR 05000245/19990021999-04-0202 April 1999 Insp Repts 50-245/99-02,50-336/99-02 & 50-423/99-02 on 990112-0301.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000336/19990011999-03-29029 March 1999 Insp Rept 50-336/99-01 on 990117-0217.Violations Noted.Major Areas Inspected:Licensee C/A Program Implementation Using Guidance of NRC IP 40500, Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems ML20205J0941999-03-12012 March 1999 Rept of Review of Millstone Units 1,2 & 3:Allegations of Discrimination in NRC Ofc of Investigations Cases 1-96-002, 1-96-007,1-97-007 & Associated Lessons Learned ML20207M1131999-03-0909 March 1999 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $88,000.Violation Noted:Employment of Two Contractor Employees Terminated in Aug 1997,in Part Because Individuals Raised Concerns Re MOV Program Manual ML20205G6161999-03-0909 March 1999 EN-99-010:on 990309,notice of Proposed Imposition of Civil Penalty in Amount of $88,000 Issued to Licensee.Action Based Upon Severity Level II Problem Involving Discrimination Against Two Contractor Employees at Millstone MOV Dept IR 05000245/19980061999-03-0101 March 1999 Insp Repts 50-245/98-06,50-336/98-06 & 50-423/98-06 on 981123-990111.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support PNO-I-99-006, on 990128,operators Inadvertently Reduced Spent Fuel Pool Water Level by Two Inches When Purification of Spent Fuel Pool Water Initiated.Operators Held Shift Briefing to Discuss Realigning Purification Sys1999-01-29029 January 1999 PNO-I-99-006:on 990128,operators Inadvertently Reduced Spent Fuel Pool Water Level by Two Inches When Purification of Spent Fuel Pool Water Initiated.Operators Held Shift Briefing to Discuss Realigning Purification Sys IR 05000245/19982171999-01-22022 January 1999 Evaluation Repts 50-245/98-217,50-336/98-217 & 50-423/98-217 Conducted on 981026-30.Areas Evaluated:Whether NNECO Has Improved Sufficiently & Has Demonstrated Sustained Performance in Maintaining safety-conscious Work Environ PNO-I-99-004, on 990115,carbon Dioxide Was Inadvertently Discharged Into Unit 3 Cable Spreading Room,Containing Electrical Wiring.Ambulance Reported to Site as Precautionary Measure.Licensee Assembled Event Review1999-01-20020 January 1999 PNO-I-99-004:on 990115,carbon Dioxide Was Inadvertently Discharged Into Unit 3 Cable Spreading Room,Containing Electrical Wiring.Ambulance Reported to Site as Precautionary Measure.Licensee Assembled Event Review IR 05000336/19980051999-01-0707 January 1999 Insp Repts 50-336/98-05 & 50-423/98-05 on 981006-1123. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20199C6381999-01-0707 January 1999 Notice of Violation from Insp on 981006-1123.Violation Noted:On or Before 981120,conduit 9-15,in Fire Area A-24,not Sealed & Tested in Accordance with Astme E-119,fire Endurance Test PNO-I-99-001, on 981231,Millstone Unit 2 Began Reloading Fuel Into Reactor After Extended Shutdown.Millstone Unit 3 Went Critical on 981230,after Forced Outage Due to Inadvertent MSIV Closure During Surveillance Testing at Power1999-01-0404 January 1999 PNO-I-99-001:on 981231,Millstone Unit 2 Began Reloading Fuel Into Reactor After Extended Shutdown.Millstone Unit 3 Went Critical on 981230,after Forced Outage Due to Inadvertent MSIV Closure During Surveillance Testing at Power PNO-I-98-062, on 981211,Millstone Unit 3 Tripped from 100% Reactor Power During MSIV Partial Stroke Testing.Solenoid Valve Integral to MSIV Failed to Reopen When Licensed Operator Released Test Switch1998-12-15015 December 1998 PNO-I-98-062:on 981211,Millstone Unit 3 Tripped from 100% Reactor Power During MSIV Partial Stroke Testing.Solenoid Valve Integral to MSIV Failed to Reopen When Licensed Operator Released Test Switch ML20195H6901998-11-18018 November 1998 Notice of Violation from Insp on 980818-1005.Violation Noted:Engineering Evaluations Not Performed When RCS Heatup Rate Limit Exceeded on 951217 & When RCS Cooldown Rate Limit Exceeded on Three occasions,940424,0728 & 951215 IR 05000245/19982161998-11-18018 November 1998 Insp Repts 50-245/98-216,50-336/98-216 & 50-423/98-216 on 980818-1005.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000336/19982031998-11-0505 November 1998 Insp Rept 50-336/98-203 on 980824-0904.No Violations Noted. Major Areas Inspected:Effectiveness of Configuration Mgt Plan ML20155B1521998-10-23023 October 1998 Notice of Violation from Insp on 980810-0903.Violation Noted:Design Basis,As Described in FSAR Chapter 14,Accident Analyses Had Not Been Correctly Translated Into Plant Procedures & Acceptance Criteria IR 05000336/19982131998-10-23023 October 1998 Insp Rept 50-336/98-213 on 980810-0903.Violations Noted. Major Areas Inspected:Certain Aspects of Accident Mitigation Sys IR 05000245/19982151998-10-14014 October 1998 Evaluation Repts 50-245/98-215,50-336/98-215 & 50-423/98-215 on 980824-28.Major Areas Evaluated:Whether Licensee Has Improved Sufficiently & Has Demonstrated Sustained Performance in Maintaining safety-conscious Work Environ IR 05000336/19980041998-10-0101 October 1998 Insp Rept 50-336/98-04 on 980914-18.No Violations Noted. Major Areas Inspected:Mov Program Associated with GL 89-10 IR 05000245/19982121998-09-25025 September 1998 Insp Repts 50-245/98-212,50-336/98-212 & 50-423/98-212 on 980630-0817.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000423/19982111998-09-11011 September 1998 Insp Rept 50-423/98-211 on 980413-24,0511-15,27-29,0609-11 & 23-25.Violation Noted.Major Areas Inspected:Evaluation of Licensee C/As & Other ICAVP Process Activities ML20154D1151998-09-11011 September 1998 Notice of Violation from Insp on 980413-24-0511-15,27-29, 0609-11 & 23-25.Violation Noted:Program Implemented TS 6.8.4.a,failed to Include Provisions to Reduce Leakage from RSS Heat Exchangers to SW Sys IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support PNO-I-98-039, 980812,Millstone Unit 3 Was Shutdown to Repair Small Leak on Afws Discharge Noted.Current Leakage Does Not Exceed Regulatory Requirements & Shutdown Not Required by Tech Specs.Licensee Issued Press Release on 9808111998-08-12012 August 1998 PNO-I-98-039:980812,Millstone Unit 3 Was Shutdown to Repair Small Leak on Afws Discharge Noted.Current Leakage Does Not Exceed Regulatory Requirements & Shutdown Not Required by Tech Specs.Licensee Issued Press Release on 980811 ML20237D3041998-08-12012 August 1998 Notice of Violation from Insp on 980413-0508.Violations Noted:Two Examples Identified Where Licensee Not Performing Leakage Testing of safety-related Valves in Sys That Could Contain Highly Radioactive Fluids During Accident IR 05000245/19982081998-08-12012 August 1998 Insp Repts 50-245/98-208,50-336/98-208 & 50-423/98-208 on 980428-0629.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML20237B0741998-08-12012 August 1998 Notice of Violation from Insp on 980428-0629.Violation Noted:Licensee Failed to Direct Test Personnel to Close & Lock RHR Outboard Drain Valve IR 05000336/19982011998-08-12012 August 1998 Insp Rept 50-336/98-201 on 980413-0508.Violations Noted. Major Areas Inspected:Licensee Ability to Identify & Resolve Deficiencies Focusing,But Not Limited To,Period of CMP Implementation & ICAVP at Parsons Power Group,Inc PNO-I-98-026, on 980701,Millstone Unit 3 Criticality Update Made.Nrc Staff Continues to Provide Augmented Insp of Unit 3 Restart Activities,Including round-the-clock Coverage of Key Operational.Licensee Plans No Press Release1998-07-0101 July 1998 PNO-I-98-026:on 980701,Millstone Unit 3 Criticality Update Made.Nrc Staff Continues to Provide Augmented Insp of Unit 3 Restart Activities,Including round-the-clock Coverage of Key Operational.Licensee Plans No Press Release PNO-I-98-025, on 980630,unit 3 Established Reactor Criticality,However Reactor Was Shut Down When Control Room Operator Noticed Spiking Intermediate Range Monitor.Licensee Troubleshooting1998-06-30030 June 1998 PNO-I-98-025:on 980630,unit 3 Established Reactor Criticality,However Reactor Was Shut Down When Control Room Operator Noticed Spiking Intermediate Range Monitor.Licensee Troubleshooting IR 05000245/19982071998-06-19019 June 1998 Insp Repts 50-245/98-207,50-336/98-207 & 50-423/98-207 on 980301-0427.Violations Noted.Major Areas Inspected:Maint, Operations,Engineering & Plant Support ML20249C6931998-06-19019 June 1998 Notice of Violations from Combined Insp on 980301-0427. Violations Noted:Prior to 980424,instrument Min Accuracy of Wind Speed Channels Were Not Measured as Required by Table 3.3-8 of Unit 2 TS 3/4.3.3.4 IR 05000423/19970831998-06-12012 June 1998 Insp Rept 50-423/97-83 on 980413-24.Violations Noted. Major Areas Inspected:Readiness of Plant Hardware,Staff & Mgt Programs to Support Safe Restart & Continued Operation of Plant Unit 3 ML20249B0421998-06-12012 June 1998 Notice of Violations from Insp on 980413-24.Violations Noted:Only 1 RCS Loop Operable W/Plant in Mode 4 on 980407 IR 05000423/19970821998-06-11011 June 1998 Insp Rept 50-423/97-82 on 980209-20.Violations Noted.Major Areas Inspected:Corrective Actions Processes 1999-09-14 |
Inspection Report - Millstone - 1986021 | |
---|---|