IR 05000336/1986022
| ML20211L543 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 02/04/1987 |
| From: | Coe D, Collins S, Keller R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20211L497 | List: |
| References | |
| 50-336-86-22OL, NUDOCS 8702270153 | |
| Download: ML20211L543 (3) | |
Text
{{#Wiki_filter:1 .y V. S. NUCLEAR REGULATORY COMMISSION REGION I OPERATOR LICENSING EXAMINATION REPORT EXAMINATION REPORT NO. 86-22 (OL) FACILITY DOCKET NO. 50-336 FACILITY LICENSE NO. DPR-65 LICENSEE: Northeast Energy Co.
P.O. Box 270 Hartford, CT 06141 FACILITY: Millstone 2 EXAMINATION DATE: December 15, 1986 ,& /8[ CHIEF EXAMINER: ' D. Coe, Reactor Engineer (Lead Examiner) ' Date REVIEWED BY: [[/ [ 2/7/f7 R. Keller, Chief,' Project Section ID Date APPROVED BY-b)lk////1hi ih T. J. Collins, Deputy Director, DRP 'Date SUMMARY: One Reactor Operator candidate and one Senior Reactor Operator candidate were given operating examinations. Both candidates had previously passed an NRC written examination. Both passed the operating examination and were issued licenses.
NR #kob?l95000336 870209 Y PDR t
. .-
REPORT DETAILS < TYPE 0F EXAMS: Replacement X EXAM RESULTS: , l R0 l SR0 l l Pass / Fail l Pass / Fail-l , l l l l l l l' 10ral Exam l 1 /0 l 1 /0 l l l l l l l l l l Simulator Examl 1/0 l 1/0 l l l l l l l
I l0verall l 1/0 l 1/G l l
I I I I I i 1.
CHIEF EXAMINER AT SITE: Douglas Coe, NRC 2.
OTHER EXAMINERS: Noel Dudley, NRC Cornelius Holden, NRC 3.
Summary of generic strengths or deficiencies noted on oral exams: None noted.
4.
Comments on availability of, and candidate familiarization with design, ' procedure, and T. S. changes, and with LERs.and recent significant events.
The senior operator candidate was knowledgeable of and sensitive to required Technical Specification actions upon loss of certain instrument inputs to the Remote Shutdown Panel (C-21).
Lack of this sensitivity on the part of licensed operators had recently contributed to an event of similar nature at Millstone Unit 2.
5.
Personnel Present at Exit Interview: l NRC Personnel D. H. Coe, Chief Examiner l l
-.. .
Facility Personnel H. F. Haynes, Manager, Operator Training J. S. Keenan, Unit 2 Superintendent J. F. Smith, Unit 2 Operations Supervisor M. J. Wilson, Unit 2 Operator Training Supervisor J. Becker, Unit 2 Operator Training Assistant J. Parillo, Unit 2 Operator Training Assistant 6.
Summary of NRC Comments made at exit interview: The NRC gave no results of the operating examinations.
The NRC discussed the methods presently being employed to conduct a formal evaluation of the licensee's 1986 operating and written requalification examinations. At the time of this exit meeting, the operating examina-tions were completed and written examinations scheduled for early January 1987 with NRC review being conducted throughout. The details of this evaluation will be issued under a separate report (No. 336/86-25 [0L]). The results of a performance based requalification program inspection were discussed. These results have been turned over to the Senior Resident Inspector for inclusion in the monthly inspection report.
t t l t l l _ _.
__ . . . . -. -. . _ .- - }}