ML20205F481

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-245/86-21OL of Exam Administered During Wk of 861212.Concerns Re Accuracy of Simulator Cause & Malfunction Book & Number of Errors in Facility Lesson Plans Warrant Immediate Attention
ML20205F481
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/20/1987
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20205F487 List:
References
NUDOCS 8703310172
Download: ML20205F481 (2)


See also: IR 05000245/1986021

Text

. - . _

MAR 2 01987

Docket No. 50-245

Northeast Nuclear Energy Company

ATTN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

SUBJECT:

EXAMINATION REPORT NO. 50-245/86-21 (OL)

The week of December 12-19, 1986, the NRC administered examinations to employ-

ees of your company who had applied for licenses to operate your Millstone

Unit 1 facility. At the conclusion of the examination, the examination

questions and preliminary findings were discussed with those members of your

staff identified in the enclosed-report.

Two areas of concern found during the examination period warrant your immediate

attention. These are the accuracy of the simulator cause and malfunction book

and the large number of errors in the facility lesson plans. Details of these

concerns are in the attached report.

In accordance with 10 CFR 2.790 of the Commissions regulations, a copy of this

letter and the enclosure (s) will be placed in the NRC Public Document Room.

Should you have any questions concerning this examination, please contact us.

Sincerely,

Edward C. Wenzinger, Chief

Projects Branch 3

Division of Reactor Projects

Enclosure: Examination Report No. 50-245/86-21 (OL) w/ attachments 1, 2 and 3

3f#

OFFICIAL RECORD COPY

OL ER MILL 1 - 0001.0.0

8703310172 870320

PDR

ADOCK 05000245

V

PDR _

-

-

..

.-

--

-

. - - _ . - . . _ _ - . - .-- .--_-_ -

-

..

_

Northeast Nuclear Energy Company

2

MAR 2 01987

cc: w/ enclosure and Attachments 1, 2, 3:

E. Scace, Station Superintendent

R. Lueneburg, Supervisor, Operator Training

Senior Resident Inspector

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of Connecticut

cc: w/ enclosure; without Attachments 1, 2, 3:

W. D. Romberg, Vice President, Nuclear Operations

D. O. Norquist, Manager of Quality Assurance

R. M. Kacick, Manager, Generation Facilities Licensing

G. Garfield, Esquire

bec: w/o enclosure without Attachment 1, 2, 3:

DRP Section Chief

Examiner

Chief, OLB DHFT, NRR

Region I Docket Room (w/ concurrences)

Master Exam File (w/all attachments)

OL File

B. Hajek, NRC Consultant

.

}

RI:DR

I:DRP

RI: RP

d

RI:DRP

RI:DRP.

h

'

o

s

McCabe

ediin'ger

Howe /fi

Langed

Kel

X

03/q/87

03/q/87 03

/8;

/2/8

03/$/87 03//8/87

0FFICIAL RECORD COPY

OL ER MILL 1 - 0002.0.0

03/05/87