ML20199A180

From kanterella
Revision as of 07:10, 20 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
EN-97-115:on 971223,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Problem Involving Several Violations Re Two Separate Events
ML20199A180
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/18/1997
From: Lieberman J, Reis T
NRC OFFICE OF ENFORCEMENT (OE)
To:
References
EA-97-497, EN-97-115, NUDOCS 9801270137
Download: ML20199A180 (1)


Text

_ ,

  • Dec mber 18,1997 EN 97-115 OFFICE OF ENFORCEMENT

.. 4 ,

NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTK h pcensee: Entergy Operations, Inc. (EA 97-497)

River Bend Station Docket No. 50-458 Sublect: PROPOSED IMPOSITION OF civil PENALTY - $55,000 This is to inform the Commission that a Notice of Violation and Proposed Imposition of Civil Penalty in the amount of $55,000 will be issued on or about December 23,1997, to Entergy Operations. Inc. This action is based on a Severity Level lli problem involving several violdons related to two separate events where tha licensee failed to ensure shutdown cooling systems were adequately maintained. The first violation involves a failure to meet techn! cal specification requirements when, in one event, the licensee inidvertantly transitioned from Reactor mode 4 to mode 3 for about 30 minutes and experie iced some boiling in the core. The remaining three violations involve failures to establish adequate procedures for op2 ration of shutdown cooling.

B cause this was not the first escalated enforcement action within 2 years, the staff considered whether credit was warranted for identification and corrective action. Credit was not warranted for Identification b:cause the violations were revealed by events and because there was industry experience and other information available to plant staff that should reasonably have caused actions that would have prevented tha violation. However, the NRC determined that Entergy is deserving cf Corrective Actions based on its prompt and comprehensive corrective actions.

It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule ofissuance and notification is:

Mailing of Notice December 23,1997 Telephone Notification of Licensee December 23,1997 i

Ths State nf Louisiana will be notified.

Tha licensec has thirty days from the date of the Notice ,a which to sespond. Following NRC evaluation of th3 response, the civil penalty may be remitted, mitigated, or imposed by Order.

Contacts: Terry Reis, OE, 504-3281 Jim Lieberman, OE, 504-2741 Distribution OWFN OWFN TWFN Regional Offices Chairman EDO OC Rf RIV Comm. DEDR AEOD Ril WCFO Comm. DEDS OP CTR Rlli Comm. OE NMSS SECY OGC IRM Mall OCA NRR OlG NUDOCS IP 01 RES PDR PA SP ACRS PRELimARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION d3 9001270137 971218 i,g'agjg hv(.