ML20199F873

From kanterella
Revision as of 18:08, 19 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs That Personnel Noted on Encl Are Proposed as Additions to Millstone Independent Corrective Action Verification Program Staff,Iaw Project Procedure PP-06, Substitution or Addition of Personnel
ML20199F873
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/18/1997
From: Curry D
External (Affiliation Not Assigned)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUM2-PPNR-0802, NUM2-PPNR-802, NUDOCS 9711250033
Download: ML20199F873 (2)


Text

-

L'" PARSONS

" Daniel L' Curry, vo necoint tumw Wo

'P;psors Power Group inc 2675 Morgantown Road

  • Readag Penncyivcea IMh7 * (f10) 655-23f6
  • Fax (610) 8%PG02 Novanber 18,1997 Docket No. 50-336 Parsons NUh12-PPNR-0802 L U.S. Nuclear Regulatory Commission

- Attention: Document Control Desk Washington, D.C. 20555 hiillstone Nuclear Power Station Unit No. 2 Indgpsndent Corre_q1irg_ Action Vedfication Program (ICAVP)

Gentlemen:

In accordance with Project Procedure PP-06 " Substitution or Addition of Personnel", the personnel noted on Attachment I are proposed as additions to the hiillstone Unit 2 ICAVP Staff. Attachment 1 includes a brief description of the assigned task / role on the hiillstone Unit 2 ICAVP. " Conflict ofInterest Forms" and resumes of these personnel have been previously forwarded.

In addition, one individual interviewed on October 7,1997 conunitted to the sale of Northeast Utilities stock within 60 days. This it to inform you that the individual involved has sold all shares of Northeast Utilities stock.

Contact me at (610)855-2366 if you requir.: additional information.

Sincerely,

' d,c NA'I fDO\

Daniel L. Curry Parsons ICAVP Project Director DLC:evb t Attachments:

I Attachment 1 - Proposed Additions to the hiillstor.e Unit 21CAVP cc: E. Imbro (2)- USNRC II. Eichenholz- USNRC R. Laudenat - NNECo J. Fougere - NNECo Rep. Terry Concannon - NEAC 9711250033 971110 PDR ADOCK 05000336 P PDR

. e ,3 l

{ A

  • ' ~--

ATTACllMENT 1 ADDITION OF PERSONNEL - MILLSTONE UNIT 2 ICAVP NAME ASSIGNED TASK / ROLE Chen, Wenchi(Victor) IIVAC - Tier 1 Flemming, Tom Mechanical (Diesel)- Tier I Depew, James llVAC - Tier i Schmehl, Richard Structural- Tier 1 i

Didier, Claude Mechanical- Tier 3 IIall, Roger Electrical- Tier I D

4