Summary of 971104 Meeting W/Util Re Issues Related to Improved STS for Fermi 2.List of Meeting Attendees Encl
ML20199G680
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/19/1997
From: Kugler A
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9711250249
Download: ML20199G680 (4)


Text

. _ .

k -

... t221C (

[ t UNITED STATES j j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 3de6H001 g,3tf/

\.....[t November 19, 1997 LICENSEE: Detroit Edison Company FACILITY: Fermi 2 Nucleer Plant

SUBJECT:

MEETING WITH THE DETROIT EDISON COMPANY TO DISCUSS ISSUES RELATED TO THE IMPROVED STANDARD TECHNICAL SPECIFICATIONS FOR FERMI 2 A meeting was held at NRC Headquarters on November 4,1997, to discuss the licer.see's plans for the submittal and implementation of the improved standard technical specifications (ISTS) at the Fermi-2 plant. The licensee had requested the meeting to discuss the status of its submittal preparations and to leam more about the process the NRC is currently using for the review of these submittals.

The licensee plans to submit its application in March 1998. The licensee hopes to implement the ISTS in the middle of an operating cycle (i.e., with a 2 or 3-month separation from any refueling outage). The next refueling outage is scheduled to begin in August 1998, with the following outage starting in approximately March 2000. The staff indicated that the NRC review would take approximately 12 months from the time it starts. However, due to a backlog of reviews, the NRC would not begin its review as soon as the submittal s' rives. Most likely, NRC L review would start in the middle of 1998 with completion in mid-1999. This appears to fit well with the Fermi schedular needs.

l The staff emphasized the need to minimize the inclusion of any items that are beyond the ISTS scope in the submittal. These items would require separate reviews and could delay the issuance of the amendment. The licensee indicated that it understood this.

The staff then explained the process. Shortly after the staff receives the submittal, it will perform a screening review to locate any obvious problems. These problems will then be discussed and resolved with the licensee, if the screening identifies issues that require a separate review, the NRC project manager will initiate action for these reviews immediately. At some later date, the staff will begin the formal review. The staff expects to develop a draft safety evaluation (SE) approximately 9 months after the formal review is started. The draft SE will be discussed with the licensee, providing an opportunity for comments. The final SE and the amendment will then be issued approximately 12 months after the beginning of the formal review. The staff also mentioned that it had modified the format for the SE starting with the f

i H.B. Rob'nson plant To support this modificd approach, the staff would be asking 'he licensee /

to supply a table defining differences between the licensee's submittal and the standard. This request would be made after the staff had resolved any questions raised during the review. On [)

the subject of relocations, the staff indicated that it viewed movement of a TS item to documents such as the updated final safety analysis report (UFSAR) or the quality assurance plan (QAP) op p relocation. Moving a TS item to procedures is considered a deletion. This

. L iJU L D i

'NC FRE CENTER CDPV

, 9711250249 971119 ll'll llE lll!ll i e * *llll PDR ADOCK 05000341

_ _ _ _l _ . _ _ _ _ . _ _ _. P DR , _

2 distinction is maue because the regulations eMablish a threshold above which changes to documents such as the UFSAR and the QAP require NRC review and approval, in general, the regulations do not require NRC review and approval of licensee procedures.

The meeting was viewed as useful for both the licensee and the NRC and the staff expects this dialogue to continue. A list of the meeting attendees is enclosed.

ORIGINAL SIGNED BY Andrew J. Kugler, Project Manager Project Directorate ill 1 Division of Reactor Projects -lil/IV Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

As stated cc w/ encl: See next page s

DlSIfiiB11Il0B Hard Copy Docket File PUBLIC .

PD3 ' R/F >

OGC ACRS E-mail SCollins/FMiraglia (SJM1/FJM)

RZimmerman (RPZ)

EAdensam (EGA1)

BBurgess (BLB)

ESchweibinz (ERS)

Dross (SLM3)

GTracy (GMT)

WBeckner (WDB)

DOCUMENT NAME: G:\WPDOCS\ FERMI \FE-ISTS.MTS To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE PM:PD31 ,

E LA:PD31 E PD:PD31_ ,

NAME AKugler:db WL CJamerson Cfy JHannon DM, kv DATE 11/lq /97 11/ is /97 8 11//9 /97 OFFICIAL RECORD COPY

.. -- .~ - --- . ._ . . . . . . . . .. .

< o

. i i

  • i Detroit Edison Company Fermi 2  !

cc:

John Flynn, Esquire Mr. Douglas R. Gipson Senior Attorney Senior Vice President  ;

Detroit Edison Company Nuclear Generation 2000 Second Avenue Detroit Edison Company .

Detroit, Michigan 48226 6400 North Dixie Highway

  • Newport, MI 48166  ;

Drinking Water and Radiological Protection Division '

Michigan Department of Environmental Quality 3423 N. Martin Luther King Jr Blvd i P. O. Box 30630 CPH Mailroom Lansing, Michigan 48g09 8130 U.S. Nuclear Regulatory Commission Resident inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 Monroe County Emergency Management Division 963 South Raisinville Monroe, Michigan 48161 Regional Administrator, Region lll U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532 4351 Norman K. Peterson Director, Nuclear Licensing Detroit Edison Compcny Fermi 2 280 TAC 6400 North Dixie Highway Newport, Michigan 48166

. - - . - - . - . - - - . . . .. .-. . - . _ - . - -. .- - . . ~ . . . .- .--

a . a

. i MEETING ATTENDEES FOR NOVEMBER 4,1997, FERMI 2 MEETING ON THE IMPROVED STANDARD TECHNICAL SPECIFICATIONS NAME AFFILIATION William Beckner NRC/NRR/TSB, Branch Chief Andrew Kugler NRC/NRR/PD3-1, Fermi Project Manager Glen- Ohlemacher Detroit Edison, Licensing Staff Chan.2 dope Contractor to Detroit Edison 1